per 100 meter of installed pipe. The Study Covers: Stormwater and sewer applications ... Total Installed Cost (Rand per Meter) for 300 mm Diameter Pipe ... – PowerPoint PPT presentation

Number of Views:44
Avg rating:3.0/5.0
Slides: 8
Provided by: a121
Category:

less

Transcript and Presenter's Notes

Title: Comparative Labour Content and Installed Costs for Different Pipe Systems


1
Comparative Labour Content and Installed Costs
for Different Pipe Systems
Conducted by
September 2005
2
Background
  • Study aim
  • To provide scientifically based comparisons for
  • Total labour content across the value chain,
  • Total cost in Rand,
  • per 100 meter of installed pipe
  • The Study Covers
  • Stormwater and sewer applications
  • Concrete, HDPE and GRP pipes
  • 300 mm, 600 mm and 1 200 mm diameter classes

3
The Value Chain for Pipes

Level 1
Level 2
Level 3
Level 4
Pipe Type
Pipe Laying
Concrete
Iron Ore
Steel
Coal
Equipment
Pipe Manufacture
Aggregate
Labour
Cement
Coal
Pipe Laying
Ethylene (Sasol)
HDPE
Coal
Equipment
HDPE Polymer(Dow Plastics)
Pipe Manufacture
Labour
Fill material
Pipe Laying
GRP
Glass fibre (imported)
Pipe Manufacture
Equipment
Resin (inputs imported)
Labour
Fill material
Transport
Transport
Transport
4
Work Content for Total Value Chain for Pipe
Delivered
(Mandays/100 m for 600 mm diameter pipe)
5
Pipe Laying Cost (Rand per Meter) for 600 mm
Diameter Pipe
6
Total Installed Cost (Rand per Meter) for 300 mm
Diameter Pipe
7
Key Conclusions
  • Concrete piping systems provide significantly
    more jobs across the value chain, compared with
    HDPE and GRP
  • Concrete pipes has the lowest installed cost 66
    of the cost of GRP/HDPE for smaller diameters and
    60 of the cost of competing systems for larger
    diameters
  • Concrete pipes use only locally produced raw
    materials GRP is heavily dependent on imported
    material