Title: Southern Morava Region Sewerage and Wastewater Treatment Master Plan
1Southern Morava Region Sewerage and Wastewater
Treatment Master Plan
- Preparation of a Sewerage Wastewater Strategic
Master Plan for the Southern Morava Region and
Tender Documents for Construction of a "Model"
WWTP - An EU funded project managed by the European
Agency for Reconstruction
- Izrada Strateškog plana razvoja kanalizacione
mreže i tretmana otpadnih voda u slivu Južne
Morave i priprema tenderske dokumentacije za
konstrukciju Modela postrojenja za preradu
otpadnih voda - Projekat je finansiran od strane Evropske Unije
pod upravom Evropske Agencije za Rekonstrukciju
2Southern Morava Region Sewerage and Wastewater
Treatment Master Plan
Podrucje projekta
3Southern Morava Region Sewerage and Wastewater
Treatment Master Plan
- Characteristics of the Project Area
- About 16,000 km2
- About 1 million inhabitants
- 25 Municipalities
- 24 Named Urban Centres
- About 100 major industries
- Karakteristike projektnog podrucja
- Oko 16 000 km2
- Oko milion stanovnika
- 25 opštine
- 24 gradska centra
- Oko 100 vecih industrijskih pogona
4Southern Morava Region Sewerage and Wastewater
Treatment Master Plan
- Project Objectives
- To strengthen the protection of water resources,
water quality and public health - Provision of improved conditions for increased
investment in wastewater treatment and sewerage,
and protection of ground and surface water - Project Outputs
- Sewerage and Wastewater Treatment Master Plan
- WWTP Design and Tender Documents
- Ciljevi projekta
- - Povecati zaštitu izvora vode, kvalitet vode
i javnog zdravlja - - Obezbediti bolje uslove za veca ulaganja u
sisteme za precišcavanje otpadnih voda i
kanalizaciju i zaštitu podzemnih i površinskih
voda - Rezultati projekta
- - Strateški plan razvoja kanalizacije i
tretmana otpadnih voda - - Izrada tehnicke dokumentacije
postrojenja za preradu otpadnih voda i priprema
tenderske dokumentacije
5(No Transcript)
6Major Outputs Glavni rezultati
- Full Master Plan ready for financing
- GIS based data base for whole region
- Preliminary design of priority investments
- Design Manual for good practice
- Detailed design for small WWTP
- Potpun Strateški plan spreman za finansiranje
- GIS baza podataka za citavo podrucje
- Preliminarni projekat o prioritetnim ulaganjima
- Smernice za pripremu tehnicke dokumentacije
- Glavni projekat za manje prostrojenje za
precišcavanje otpadanih voda
7Southern Morava Region Sewerage and Wastewater
Treatment Master Plan
- 2 years
- Project office in Nis
- Permanent staff of 8
- Total staff of 49
- 20 international experts
- 21 Serbian experts
- 2 godine
- Projektna kancelarija u Nišu
- 8 osoba sa stalnim angažmanom tokom projekta
- Ukupan broj angažovanih na projektu je 49
- 20 medjunarodnih strucnjaka
- 21 strucnjak iz Srbije
8Southern Morava Region Sewerage and Wastewater
Treatment Master Plan
- Main findings
- 50 of the population connected to sewer systems
- In total 1,085 km of primary sewers.
- 29 pumping stations
- 5 wastewater treatment plants with capacity of
49,000 PE (5 of the total domestic wastewater
flow) - Three plants need major reconstruction
- Najbitniji zakljucci
- - 50 stanovništva povezano na kanalizacioni
sistem - - ukupna dužina primarne mreže iznosi 1 085km
- - ukupno postoji 29 pumpnih stanica
- - postoji 5 postrojenja za precišcavanje otpadne
vode kapaciteta 49 000 ES (5 ukupne kolicine
otpadne vode iz domacinstava) - - potrebna kompletna rekonstrukcija tri (3)
postrojenja za precišcavanje
9(No Transcript)
10Southern Morava Region Sewerage and Wastewater
Treatment Master Plan
- Future Requirements
- 60 projects identified
- Future wastewater load in project area
- 250,000 m3/day
- 1.1 million PE
- 21 wastewater treatment plants
- 105 pumping stations
- 749 km of connecting sewers
- Investments needed
- 300 million Euros for the master plan
- 200 million Euros for local sewer networks
- Buduce potrebe
- Identifikovano 60 projekata
- Buduce opterecenje otpadnom vodom na podrucju
projekta - - 250 000 m3/dan
- - 1,1 milion ES
- 21 postrojenje za precišcavanje
- 105 pumpnih stanica
- 749 km primarne kanalizacione mreže
- Potrebne investicije
- - 300 miliona Evra za master plan
- - 200 miliona Evra za lokalne kanalizacione
mreže
11(No Transcript)
12Southern Morava Region Sewerage and Wastewater
Treatment Master Plan
- Ranking of Projects
- Phase 1 0-5 years
- Phase 2 6-15 years
- Phase 3 16-25 years
- Rangiranje projekata
- - Faza 1 0-5 godina
- - Faza 2 6-15 godina
- - Faza 3 16-25 godina
13Southern Morava Region Sewerage and Wastewater
Treatment Master Plan
- Methodology used for ranking
- Multi Criteria Analysis (MCA)
- Costs
- Environment and Hygiene
- Social aspects
- Primenjena metodologija pri rangiranju
- Višekriterijumska analiza (VA)
- Troškovi
- Životna sredina i higijena
- Socijalni aspekti
14Southern Morava Region Sewerage and Wastewater
Treatment Master Plan
Top-10 results
15Southern Morava Region Sewerage and Wastewater
Treatment Master Plan
- Phase 1
- Prokuplje
- Niš
- Leskovac
- Pirot
- Vranje
- 105,000,000 Euro
- Faza 1
- Prokuplje
- Niš
- Leskovac
- Pirot
- Vranje
- 105,000,000 Euro
16(No Transcript)
17(No Transcript)
18Southern Morava Region Sewerage and Wastewater
Treatment Master Plan
Thank You Hvala