US IOOS Coastal and Ocean Modeling Testbed: Roundup and Progress - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

US IOOS Coastal and Ocean Modeling Testbed: Roundup and Progress

Description:

TMG Advance common infrastructure for ... assets and capabilities that contribute to the U.S. IOOS in the areas of governance/management ; observing ... – PowerPoint PPT presentation

Number of Views:139
Avg rating:3.0/5.0
Slides: 18
Provided by: NOS56
Category:

less

Transcript and Presenter's Notes

Title: US IOOS Coastal and Ocean Modeling Testbed: Roundup and Progress


1
US IOOS Coastal and Ocean Modeling
TestbedRoundup and Progress
  • Becky Baltes
  • COMT Project Manager
  • April 14, 2015

2
Outline
  1. Science Priorities and Drivers
  2. COMT Infrastructure Accomplishments
  3. Project Accomplishments
  4. Year Ahead

2
3
Science Priorities and Drivers
  • Ecological Forecasting Roadmap
  • Storm Surge Roadmap
  • OFS Development Cycle
  • Federal Operational Requirements
  • Administrative ToR, Implementation Plan
  • Aspiring Drivers
  • CO-OPS 5 year Requirements Plan
  • NOS Implementation Plan
  • IOOS RA User requirements

4
Projects
GoMx- Hypoxia
Cyber Infrastructure
Fennel et al. JGR SURA issue (2013)
SciWMS image below for Ruoying He's model
rendered directly from a DAP server.
WCOFS
Wave Inundation
CB- Hypoxia
4
5
Transitioning an Estuarine Hypoxia Model to
Operations in the Chesapeake Bay
  • Objective
  • Assess suite of estuarine dissolved oxygen models
    to make recommendations for producing predictions
    of hypoxia within Chesapeake Bay
  • Infrastructure Developments
  • Code is ready for testing
  • Learning the requirements for transition
  • Connecting to CO-OPS development cycle
  • Part of pilot for EFR Hypoxia Team

6
Seasonal and Short-term Forecast System and
Nutrient Load Scenarios for Hypoxia Prediction in
the Northern Gulf of Mexico
Objective Implement and demonstrate a real-time
hypoxia forecasting system applicable to the
hypoxia-prone Northern Gulf of Mexico.
  • Infrastructure Developments
  • NCCOS, EPA and ONR engaged in process
  • NCCOS coordinating COMT work as it funds
    complimentary work and plans out year work
  • EFR Pilot project in planning process

Fennel et al. JGR SURA issue (2013)
7
Cyberinfrastructure for COMT
  • Objective
  • Improve function and performance of SciWMS so it
    can be used to visualize all compliant model
    results and observational data stored on the COMT
    archive server
  • Develop a SciWMS based web client to perform the
    visualization
  • Infrastructure Developments
  • IOOS Catalog coordination
  • Visualization tools

SciWMS image below for Ruoying He's model
rendered directly from a DAP server.
8
Puerto Rico/U.S. Virgin Islands Surge and Wave
Inundation
  • Objectives
  • Extend the present wave/surge operational
    forecasting capability from mild-sloped coastal
    areas such as the US East and Gulf of Mexico
    coasts to steep-sloped areas such as around
    Caribbean and Pacific islands
  • Transition this capability to NOAAs National
    Hurricane Center and local WFOs.
  • Infrastructure Successes
  • Jamie Rhomes visit to the COMT All Hands Meeting
  • A model doesnt need to be transitioned for
    the
  • testbed work to be a success. Thats not
    necessarily
  • even the best case scenario.

9
The West Coast Project
  • Part of a larger NOAA development project for a
    West Coast Ocean Forecast System (WCOFS)
  • Objectives are to
  • Compare 3 ROMS based models as a step toward a
    coordinated super-regional modeling capability
    for the U.S. West Coast.
  • Compare performance of 3 different bio-chemical
    models (NPZDO, NEMURO, COSINE) within a single
    ROMS domain.

10
NOS OFS Plans
11
WCOFS Ocean Data Map
Climatology
NWS NCEP Central Operations (NCO)
NWS NCEP Environmental Modeling (EMC)
RTOFS (HYCOM)
WCOSS BUFR tanks (/dcom)
TNC
SMS new data query job
LDM
GTS
Background state
QA/QC procedures
NOS Operational Oceanographic Products Services
(CO-OPS) WCOFS (ROM)
Innovation
NDBC
Variational Analysis
1st guess
QA/QC procedures
Background state
SSH, SST, T, S, u, v, w (SSS, HF radar, chl-a,
)
IOOS RAs
Innovation
Boundary conditions
Model Forecast System
Variational Analysis
1st guess
Analysis
NAVO
SSH, SST, T, S, u, v, w (SSS, HF radar, chl-a,
)
FTP via DAPE
Forecast
Model Forecast System
Analysis
Archives Reproduce, Monitor, Reanalyze
NESDIS
FTP via DDS/PDA
Forecast
12
Systems Development Life Cycle
  • WCOFS Research and Development
  • Reviewed by the Project Review Board (PRB) and
    the Model Advisory Board (MAB)
  • Passed the gate criteria to enter Phase 4
    Development and Testing
  • WCOFS Operations Reviewed by the MAB

Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
Phase 6
13
COMT Future
  • Funding for FY15-FY17
  • Make progress on the Aspiring Drivers
  • Connecting with CO-OPS/CSDL Requirements process
  • Connect with other agencies for coastal processes
  • Re-evaluate ToR and governing structure

14
Back Up Slides
15
Organizational Chart
16
Organizational Chart
EOB
TSG?
TMG
17
COMT Ongoing Goals
  • Advance common infrastructure for access,
    analysis and visualization of all ocean model
    data produced by the Federal Backbone and the
    IOOS Regions
  • Improve R2O and O2R by building stronger
    relationships between academia and operational
    centers through collaboration
  • Advance skill metrics and assess models in
    different regions and dynamic regimes
  • Transition models, tools, toolkits and other
    capabilities to federal operational facilities
  • Allow for both continuity of effort and new
    projects
Write a Comment
User Comments (0)
About PowerShow.com