Collaboration and IPD University of Washington
2
Collaboration Benefits
3
AEC Use of BIM
Construction productivity has actually fallen in
the past 40 years while most industries have seen
an increase.
4
AEC Use of BIM
A major benefit of BIM is the ability to resolve
problems earlier in the design process.
5
BIM Use in AEC
6
BIM Use in AEC
Traditional approach, not using BIM
7
BIM Use in AEC
Traditional approach, not using BIM
8
BIM Use in AEC
Traditional approach, not using BIM
9
BIM Use in AEC
Traditional approach, not using BIM
10
BIM Use in AEC
New approach, implementing BIM
11
BIM Use in AEC
New approach, implementing BIM
12
BIM Use in AEC
New approach, implementing BIM
13
BIM Use in AEC
New approach, implementing BIM
14
BIM Use in AEC
New approach, implementing BIM
15
BIM Use in AEC
New approach, implementing BIM
16
BIM Use in AEC
Design BIM and Construction BIM
17
BIM Use in AEC
Design BIM Used to generate contract documents
and to calculate loads and volumes.
Design BIM and Construction BIM
18
BIM Use in AEC
Design BIM Used to generate contract documents
and to calculate loads and volumes.
Construction BIM Used to coordinate
construction and for assembly pre-fabrication.
Design BIM and Construction BIM
19
BIM Use in AEC
Design BIM and Construction BIM
20
BIM Use in AEC
Design BIM and Construction BIM

Design BIM ? CD ? IFC
IFC ? Research ? Construction BIM
21
BIM Use in AEC
Design BIM and Construction BIM
Real improvement requires collaboration
22
BIM Use in AEC
Design BIM and Construction BIM
23
Collaboration Benefits - IPD
24
Collaboration Benefits - IPD
25
Experience Music Project
26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
Seattle Central Library
30
(No Transcript)
31
(No Transcript)
32
(No Transcript)
33
(No Transcript)
34
(No Transcript)
35
(No Transcript)
36
(No Transcript)
37
(No Transcript)
38
(No Transcript)
39
(No Transcript)
40
(No Transcript)
41
(No Transcript)
42
(No Transcript)
43
(No Transcript)
44
(No Transcript)
45
(No Transcript)
46
(No Transcript)
47
(No Transcript)
48
(No Transcript)
49
(No Transcript)
50
(No Transcript)
51
(No Transcript)
52
(No Transcript)
53
(No Transcript)
54
(No Transcript)
55
(No Transcript)
56
(No Transcript)
57
(No Transcript)
58
(No Transcript)
59
(No Transcript)
60
(No Transcript)
61
B. SCHEDULE ANALYSIS
62
(No Transcript)
63
(No Transcript)
64
(No Transcript)
65
(No Transcript)
66
(No Transcript)
67
(No Transcript)
68
(No Transcript)
69
(No Transcript)
70
(No Transcript)
71
(No Transcript)
72
(No Transcript)
73
(No Transcript)
74
(No Transcript)
75
Portland Marriott
76
Marriott Hotel Expansion, Portland
Point Cloud of One Floor
77
Marriott Hotel Expansion, Portland
Ceiling Points Removed for Visualization
78
Marriott Hotel Expansion, Portland
Surfaces Being Modeled
79
Marriott Hotel Expansion, Portland
Completed Surface Model
80
Marriott Hotel Expansion, Portland
Multiple Floors in Database
81
Marriott Hotel Expansion, Portland
Multiple Floors in Database
82
Marriott Hotel Expansion, Portland
Horizontal Surfaces Removed
83
Marriott Hotel Expansion, Portland
Geometric Quality Control
84
Marriott Hotel Expansion, Portland
Geometric Quality Control
85
Marriott Hotel Expansion, Portland
Geometric Quality Control
86
Marriott Hotel Expansion, Portland
Geometric Quality Control
  • Composite laser scan with line work included.

87
Marriott Hotel Expansion, Portland
Geometric Quality Control
  • Same image with only line work showing.

88
Marriott Hotel Expansion, Portland
Geometric Quality Control
89
Marriott Hotel Expansion, Portland
Geometric Quality Control
90
Marriott Hotel Expansion, Portland
Geometric Quality Control
91
Marriott Hotel Expansion, Portland
Geometric Quality Control
92
Marriott Hotel Expansion, Portland
Geometric Quality Control
  • Deliverable to pre-cast panel manufacturer based
    on laser scan geometry.

93
Marriott Hotel Expansion, Portland
Geometric Quality Control
Typical curb detail.
94
Marriott Hotel Expansion, Portland
Geometric Quality Control
Exterior panel BIM shop drawing.
95
Marriott Hotel Expansion, Portland
Geometric Quality Control
Exterior panels being installed.
96
Marriott Hotel Expansion, Portland
Geometric Quality Control
97
PT Deck As-Built
98
Bellevue Towers, Bellevue
PT Deck As-Built
99
Bellevue Towers, Bellevue
PT Deck As-Built
100
Bellevue Towers, Bellevue
PT Deck As-Built
101
Civil Site Coordination
102
Everett Naval Base, Everett
Civil Site Coordination
103
Everett Naval Base, Everett
Civil Site Coordination
104
Everett Naval Base, Everett
Civil Site Coordination
105
Everett Naval Base, Everett
Civil Site Coordination
106
Everett Naval Base, Everett
Civil Site Coordination
107
Savery Hall As-Built
108
Savery Hall, University of Washington
Structural As-Built
109
Savery Hall, University of Washington
Structural As-Built
110
Savery Hall, University of Washington
Structural As-Built
111
Savery Hall, University of Washington
Structural As-Built
112
Savery Hall, University of Washington
Structural As-Built
113
Savery Hall, University of Washington
Structural As-Built
114
Savery Hall, University of Washington
Structural As-Built
115
Savery Hall, University of Washington
Structural As-Built
116
Savery Hall, University of Washington
Structural As-Built
117
Savery Hall, University of Washington
Structural As-Built
118
Savery Hall, University of Washington
Structural As-Built
119
Savery Hall, University of Washington
Structural As-Built
120
Savery Hall, University of Washington
Structural As-Built
121
Savery Hall, University of Washington
Structural As-Built
122
Savery Hall, University of Washington
Structural As-Built
123
Savery Hall, University of Washington
Structural As-Built
124
Savery Hall, University of Washington
Structural As-Built
125
Savery Hall, University of Washington
Structural As-Built
126
Savery Hall, University of Washington
Structural As-Built
127
Savery Hall, University of Washington
Structural As-Built
128
University of Washington - Savery Hall Size
104,000 SF Construction Cost 37,200,000 Architec
t SRG Partnership Inc.
129
University of Washington - Savery Hall
130
Brightwater Concrete
131
Brightwater WTP, Woodinville, Washington
Concrete Coordination
BWTP Concrete Model
132
Brightwater WTP, Woodinville, Washington
Concrete Coordination
  • Assist in understanding shape of complex
    structures
  • Used to help determine pour sequences and
    construction joints
  • Coordination with embeds and wall penetrations
  • Detailing formwork layout

133
Brightwater WTP, Woodinville, Washington
Concrete Coordination
134
Brightwater WTP, Woodinville, Washington
Concrete Coordination
135
Brightwater WTP, Woodinville, Washington
Concrete Coordination
136
Brightwater WTP, Woodinville, Washington
Concrete Coordination
137
Brightwater WTP, Woodinville, Washington
Concrete Coordination
138
Brightwater WTP, Woodinville, Washington
Concrete Coordination
Waterstop Isometric
139
Brightwater WTP, Woodinville, Washington
Concrete Coordination
140
Brightwater WTP, Woodinville, Washington
Concrete Coordination
141
Brightwater WTP, Woodinville, Washington
Concrete Coordination
Pot-holed Pipe Location
142
Brightwater WTP, Woodinville, Washington
Concrete Coordination
Integration with HDR Model
143
Brightwater WTP, Woodinville, Washington
Concrete Coordination
BWTP Primary Clarifiers
144
Brightwater WTP, Woodinville, Washington
Concrete Coordination
BWTP Primary Clarifiers
145
Brightwater WTP, Woodinville, Washington
Concrete Coordination
BWTP Primary Clarifiers
146
Brightwater WTP, Woodinville, Washington
Concrete Coordination
Concrete As-Built Deliverable
147
Brightwater WTP, Woodinville, Washington
Concrete Coordination
Clarifier End Wall Laser Scan
148
Brightwater WTP, Woodinville, Washington
Concrete Coordination
Centerline of Chain Flight Assembly
Clarifier End Wall Deliverable
149
Brightwater WTP, Woodinville, Washington
Concrete Coordination
Fit-Up of Launder Equipment
150
Olympia City Hall
151
Olympia City Hall, Olympia, WA
Concrete Shop Drawings
152
Olympia City Hall, Olympia, WA
Concrete Shop Drawings
153
Olympia City Hall, Olympia, WA
Concrete Shop Drawings
154
Olympia City Hall, Olympia, WA
Concrete Shop Drawings
155
Olympia City Hall, Olympia, WA
Concrete Shop Drawings
156
Olympia City Hall, Olympia, WA
Concrete Shop Drawings
157
Olympia City Hall, Olympia, WA
Concrete Shop Drawings
158
Olympia City Hall, Olympia, WA
Concrete Shop Drawings
159
Manufacturing Approach to Concrete Formwork
160
(No Transcript)
161
(No Transcript)
162
(No Transcript)
163
(No Transcript)
164
(No Transcript)
165
(No Transcript)
166
(No Transcript)
167
(No Transcript)
168
Fabrication Coordination
169
Genentec, Portland, OR
Fabrication Coordination
170
Genentec, Portland, OR
Fabrication Coordination
171
Genentec, Portland, OR
Fabrication Coordination
172
Fab 32 CUB Expansion, Chandler, AZ
Fabrication Coordination
173
Fab 32 CUB Expansion, Chandler, AZ
Fabrication Coordination
174
Fab 32 CUB Expansion, Chandler, AZ
Fabrication Coordination
175
BUMP Interstitial, AZ
Fabrication Coordination
176
BUMP Interstitial, AZ
Fabrication Coordination
Write a Comment
User Comments (0)
About PowerShow.com