New Opportunities in the Gulf: Creating Business to Business Linkages - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

New Opportunities in the Gulf: Creating Business to Business Linkages

Description:

New Orleans to Venice. West Bank & Vicinity. Grand Isle. South Louisiana Hurricane Protection ... Orleans Parish. Major drainage lines. Additional Pump ... – PowerPoint PPT presentation

Number of Views:34
Avg rating:3.0/5.0

less

Transcript and Presenter's Notes

Title: New Opportunities in the Gulf: Creating Business to Business Linkages


1
New Opportunities in the Gulf Creating Business
to Business Linkages
  • June 5, 2006

2
Topics
  • Overview of the Hurricane Protection System
  • Funding Sources
  • Projects and Project Features
  • Contracting Vehicles
  • Procurement schedules

3
Program Overview
  • Task Force Guardian (TFG) is completing its
    mission of restoring Louisianas Hurricane
    Protection System (HPS) to pre-Katrina level .
  • Significant additional work needs to be done to
    upgrade the HPS so that it can provide the
    designed level of protection.
  • Two new program initiatives will continue the
    effort after TFG stands down
  • Hurricane Protection Office (HPO)
  • Protection Restoration Office (PRO)
  • Hurricane Protection System funding authorized in
    the 3rd Supplemental Appropriations Act.
  • Additional funding is expected to be included in
    the 4th Supplemental Appropriations Act.

4
Program Overview
5
HPS Projects
  • Storm proofing of existing pump stations
  • Levees, Floodwalls, and Selected Armoring for St.
    Bernard Parish, Orleans Parish, Grand Isle, and
    non-federal levees in Plaquemines Parish
  • Two flood gates with supporting structures in
    Inner Harbor Navigation Canal/Mississippi River
    Gulf Outlet System
  • Three pumping stations with operational
    floodgates at the Lake Pontchartrain ends of
    outfall canals
  • Wetlands Restoration

6
Project Features
  • Types of features likely to be designed and
    constructed
  • Levees
  • Floodwalls
  • Pump Stations (3)
  • Pump Station Storm Proofing
  • Levee and Flood Wall Armoring
  • Flood Gates (2)
  • Wetland restoration

7
Levees, Floodwalls, Flood Gates, and Pump Stations
8
Pump Station Storm Proofing
Levee Flood Wall Armoring
9
Funding Authorized under the 3rd Supplemental
  • Total authorized funding 2.077 billion
  • Includes the following projects
  • Lake Pontchartrain
  • Southeast Louisiana
  • New Orleans to Venice
  • West Bank Vicinity
  • Grand Isle
  • South Louisiana Hurricane Protection
  • Inner Harbor Navigational Channel
  • Larose to Golden Meadow

Funding Anticipated under the 4th Supplemental
  • 3.71 Billion expected

10
Lake Pontchartrain Vicinity (LPV) Project
Features
Gates
11
Lake Pontchatrain and Vicinity
  • Located in St. Bernard, Orleans, Jefferson and
    St. Charles Parishes, generally in the vicinity
    of the city of New Orleans, and between the
    Mississippi River and Lake Pontchartrain.
  • Project features include
  • 17th Street Outfall Canal (Metairie Relief)
  • East Jefferson Parish Lakefront
  • Kenner Return Levee (including flood protection
    at Louis Armstrong airport)
  • INHC Floodgates
  • Permanent Pump Stations

12
West Bank Vicinity (WBV) Project Features
13
Westbank and Vicinity Project Features
  • Located on the west bank of the Mississippi River
    in the vicinity of New Orleans and in Jefferson,
    Orleans and Plaquemines parishes.
  • Project will provide Hurricane Protection from
    Lakes Cataouatche and Salvador, and waterways
    leading to the Gulf of Mexico.

14
Westbank and Vicinity Project Features
  • Project features include
  • 22 miles of earthen levee and 2 miles of
    floodwalls extending from the Harvey Canal down
    to the V-levee near the Jean Lafitte National
    Historical Park and back up to the town of
    Westwego
  • The Lake Cataouatche area eliminated the
    west-side closure in Westwego, and added about 10
    miles of levee and 2 miles of floodwalls to this
    project.
  • The East of Harvey Canal area includes a sector
    floodgate in the Harvey Canal just below Lapalco
    Boulevard
  • 25 miles of levee and 5 miles of floodwalls,
    including enlargement of the Federal levees along
    the Algiers Canal.

15
Southeast Louisiana Project Features(SELA)(Orlea
ns and Jefferson Parish)
Lake Pontchartrain
P.S.10
ORLEANS PARISH
P.S.16
DWYER ROAD AREA
P.S.4
P.S. 12
P.S. 3
P.S.4
P.S.2
P.S. 1
Elaine St. P.S.
Grant St. P.S.
ORLEANS PARISH
Amid P.S.
P.S. 7
ST. CHARLES PARISH
P.S. 6
P.S.17
PEOPLES TRIANGLE AREA
P.S.3
P.S.5
Oleander P.S.
P.S.19
P.S.2
IHNC Lock
New P.S.
JEFFERSON PARISH
ST. BERNARD PARISH
River
P.S.1
Mississippi
EAST BANK
Mississippi
JEFFERSON PARISH
River
Algiers Lock
Segnette P.S.
P.S.13
P.S.11
Old Westwego P.S.
UPTOWN HOLLYGROVE AREAS
ORLEANS PARISH
New Westwego P.S.
New Westwego P.S.
Westminster P.S.
Belle Chasse P. S. 2
Planters P. S.
Ames P.S.
WEST BANK-- EAST OF HARVEY CANAL
Miss River Levees Hurricane Prot Levees
Mt. Kennedy P.S.
HARVEY CANAL
Oak Cove P.S.
WEST BANK-- WEST OF HARVEY CANAL
PLAQUEMINES PARISH
16
SELA Project Features
  • Orleans Parish
  • Major drainage lines
  • Additional Pump Capacity
  • New Pumping Station
  • Jefferson Parish
  • Drainage canal improvements
  • Additional pumping capacity
  • Two New Pump Stations

17
Louisiana Recovery Field Office (RFO)
  • Based in Baton Rouge, LA.
  • Primary Responsibility includes Demolition and
    Debris Removal
  • Solicitation for MATOC contracts coming out this
    summer (8(a) LA)
  • These contracts will support Stafford Act
    requirements (FEMA)

18
Potential Contract Values
  • 8(a) Set Asides for LPV, WBV, and SELA from 25M
    to 50M
  • HUBZone Set Asides for WBV and SELA from 50M to
    100M
  • 8(a) Set Asides for RFO in excess of 30M
  • This is subject to change

19
Procurement
  • Types of services likely to be procured
  • AE services
  • Planning
  • Design
  • Environmental
  • Real estate acquisition
  • Construction Services
  • Construction management and inspection
  • Earthwork
  • Pumps, pump station, and installation
  • Gates, flood control structures
  • Floodwalls
  • Trucking

20
Procurement Vehicles
  • Contract Types
  • Small Business Set Asides Programs
  • 8(a)
  • Hubzone
  • Reviewing Service Disabled Veterans Set Aside
    Possibilities
  • Unrestricted
  • Multi Task Order Contract (MATOC)
  • Best Value
  • Design Build
  • Design-Bid-Build
  • Individual contracts worth up to 1 Billion to
    be awarded by September 2007.

21
Contractor Options
  • Partnering
  • Mentor Protégé
  • Joint Venture

22
Website
  • Additional information can be obtained from the
    following website
  • www.mvn.usace.army.mil