Title: Joint Transmission Planning


1
Joint Transmission Planning
Joint and Common Market Wilmington, DE July
27,2005
2
JOA Planning Committees
  • Joint RTO Planning Committee (JRPC)
  • Sub-committee of the Inter-RTO Steering Committee
    (ISC)
  • Members are MISO and PJM planning staff - Scott
    Gass (Chair), Bill Whitehead, Mark Sims, Jeff
    Webb, Ron Arness, John Lawhorn
  • Responsibilities include
  • Develop common power system model
  • Coordinated generation interconnection studies
  • Coordinated system plans
  • Provide for review by stakeholders through the
    Inter-regional Planning Stakeholder Advisory
    Committee (IPSAC)

3
JRPC Schedule of Activities
  • Generator interconnection study coordination in
    progress (see next two slides)
  • Coordinated system plan scope and schedule review
    with stakeholders (IPSAC) October 1
  • Complete first coordinated system plan August
    2006

4
Generator Interconnection Coordination
  • The coordinated model is screened for generation
    or merchant transmission projects that have an
    impact that is greater than 3 of line rating of
    any element in the opposing system
  • Modeling information for projects that exceed the
    3 screening threshold is exchanged
  • Potentially impacted facilities and corresponding
    system upgrades are identified
  • The impacts of individual projects on all PJM
    MISO facilities is noted in the appropriate
    Feasibility / Impact Study

5
Generation Interconnection Coordination
  • Example ComEd System
  • Ties directly to MISO
  • Not all projects in PJM queue need to be studied
    by MISO
  • Focus coordinated study effort on projects that
    meet the screening criteria

6
IPSAC
  • Structure - by JOA
  • PJM TEAC MISO PAC
  • Function
  • Stakeholder review and input into development of
    coordinated system plan
  • Meetings
  • Three minimum during development and completion
    of coordinated plan the first meeting is
    propose for October 1.

7
Preferred Structure for IPSAC
  • PJM TEAC is an open stakeholder forum facilitated
    by PJM staff
  • MISO PAC forming consists of stakeholder chair
    and specific sector members
  • Preferred structure of IPSAC is to have an open
    forum facilitated by PJM and MISO staff

8
Coordinated System Plan Schedule
  • Develop 2011 MTEP/RTEP Basecase August 2005
  • Develop scope and schedule and review with IPSAC
    September/October 2005
  • Complete preliminary analysis and review with
    IPSAC - 2nd quarter 2006
  • Finalize analysis, report and review with IPSAC
    3rd quarter 2006