Polarized 3He Target Lab Update - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

Polarized 3He Target Lab Update

Description:

Most optics components ordered and in house. ... New oven test with all new cells (NMR, EPR, Spin-Flip). Cell characterization. ... – PowerPoint PPT presentation

Number of Views:25
Avg rating:3.0/5.0
Slides: 11
Provided by: Xia113
Category:
Tags: 3he | flip | house | lab | polarized | target | this | update

less

Transcript and Presenter's Notes

Title: Polarized 3He Target Lab Update


1
Polarized 3He Target Lab Update
  • Presented by
  • Xiaohui Zhan
  • MIT

Hall A Collaboration Meeting, Dec. 14, 2007
2
Outline
  • Oven/Support Structure
  • NMR EPR
  • New Oven Other Designs
  • Optics Design Orders
  • Vertical Coils Test
  • BigBite Frindge Field Investigation
  • Software Target Spin Sign Signal
  • Cell Production
  • To Do List

Students Chiranjib Dutta (UKY), Joe Katich
(WM), Xiaohui Zhan (MIT) Postdoc Yi Qiang (DUKE)
3
Oven/Support Structure
  • Support piece on the bottom was burned, install
    new support structure.
  • Working well 250oC.
  • Old cell Carlos was installed for test.

Oven
Cell
4
NMR EPR Tests
  • Good NMR signal
  • EPR underway

5
New Oven/Optics
  • Ordered from Technical Products, Inc..
  • New materical CS85 Structural Insulation.
  • Weigh 29lbs with supports (current oven
    45lbs).
  • Oven and support design was done, installation
    in February.
  • Optics design is done!
  • Most optics components ordered and in house.
  • 6 single FAP and 2 duo FAP in lab, one new duo
    and single were ordered.
  • Alignment for 2 lasers was done for the tests.

6
Vertical Coils
R 94.62 cm Z Beamline Y Vertically up X
Normal to YZ
  • With 16A current, the average field generated by
    vertical coils is 31 Gaus in Y direction
    (vertical).
  • Most field gradients inside lt 10mG/cm (absolute
    value).
  • Large gradients (20mG/cm) only happen at the
    edge of the volume.

7
BigBite Fringe Field
  • BigBite clamp reduces the gradients by half
    compared to previous measurements.
  • But also introduce the mirror coils.
  • Simulation was done (Yi Qiang).

8
Results of Simulation (Transversity)
9
Target Spin Sign SignalDAQ
  • Flip target spin every 20min
  • Hardware signal goes to CODA datastream
  • Software signal LABVIEW to EPICS
  • RF frequency monitoring quarter-wave plate
    rotation monitor

Cell Production
  • 16 new cells were done! (8 from WM and 8 from
    UVa)
  • Most cell polarization gt 40, a fewgt50, max60
    (WM)

10
To Do List
  • New oven test with all new cells (NMR, EPR,
    Spin-Flip).
  • Cell characterization.
  • New pick-up coils inside the oven.
  • Target spin sign signal/DAQ.
  • Target IOC.
  • Software collection analysis.

Will be ready before installation in May 1st,
2008!
Thanks to Jian-Ping, Todd, Walfgang, Al, Susan,
Jaideep, Ameya, Aidan
Write a Comment
User Comments (0)
About PowerShow.com