Title: Status Report: Resource Adequacy RA and Long Term Procurement Planning LTPP
1Status ReportResource Adequacy (RA) and Long
Term Procurement Planning (LTPP)
- CPUC Energy Division
- Molly Tirpak Sterkel
- Email mts _at_ cpuc.ca.gov Tel 415-703-1873
- Power Association of Northern California
- April 11, 2006
2Key Milestones in RA and LTPP
- 2004
- Adopted procurement policy framework (Jan-2004)
- Adopted RAR Framework (Oct-2004)
- Approved first 10-year of Long-Term Plans
(Dec-2004) - 2005
- Established rules for System RAR program (Oct-04)
- 2006
- First round of System RAR compliance process
underway - Two New Proceedings for RA and LTPP
- RA Local RAR program rules under development
- LTPP Next round of 10 year plans (2007-2016)
will be reviewed
3System RAR Program In Place for 2006
- Applicable to all LSEs under CPUC jurisdiction,
including 3 IOUs 12 ESPs - LSEs must meet 15-17 planning reserve margin
based on monthly peaks - Based on a top down approach to monthly peaks
- Must acquire qualifying capacity that meets
availability requirements - Year-Ahead showing is for 90 of 115 of peak
for a 5 month summer period - Month-Ahead is for 100 of 115 of peak
- Sanctions/Penalties for LSE non-compliance
4October 2005 RA Decision onLiquidated Damages
(LD) Contracts
- LD Contracts phased out for RA Counting Purposes
- No LD contracts starting after 10-29-05 count
- Except DWR Contracts, LDs are limited to
- 75 of an LSEs portfolio for 2006
- 50 for 2007
- 25 for 2008,
- and 0 thereafter
- For 2006, there are 6300 MW of LDs
- LD contracts (not inc. DWR) are about 14 of
filed RA Capacity - By 2007, most LD contracts expire
- By 2008, only 2300 MW of non-DWR LD contracts
5System RAR Compliance for 2006/2007
- LSEs filed first year-ahead filings in Feb.
2006 - Showing at least 90 of the RA requirement (115
of forecast load) is covered for 5 peak months of
2006 - Preliminary analysis shows 92 covered in
aggregate - CPUC investigating possible compliance issues
- LSEs will file first monthly filings in May
2006 - Due May 1st for June month
- Monthly thereater
- All LSEs will file year ahead 2007 showings
October 2, 2006 (1st business day after 9/30)
6New RA Proceeding R.05-12-013
- Phase 1 Issues
- Adoption of Local RA Requirement based on
consideration of CAISOs LCR Study - Other Issues as-needed related to
- Implementation
- Compliance
- Tradable Capacity Product
- Phase 2 Issues
- Capacity Markets tradable capacity product
- Multi-year forward RA Requirement
- Zonal RA Requirement
- Other Implementation Issues/ General Order
7Local RAR Consideration Underway
- CAISO 2006 Local Capacity Report (LCR) - Sep-05
- New Proceeding Opened - Dec-05
- Parties filed Local RAR Proposals - Jan 24-06
- CAISO filed supporting info on 2006 LCR -
Jan-31-2006 - CAISO Hosted Meet and Confer on 2007 LCR -
Feb-17-06 - Purpose was to lock in assumptions for 2007 study
- Workshops Held
- 2007 Local RAR Feb 8-9/Mar-15-06 re LCR study
program - RE Tradable Capacity Product - Mar-27-06
- CPUC Staff Report Issued on Local RAR - Apr-10-06
- 2007 LCR expected from CAISO - Apr-21-2006
- Expect CPUC decision to adopt Local RAR -
Jun-2006
8Milestones for Local RAR
4/21 - CAISO submits 2007 LCR study
5/15 - Draft Dec issued
1/24 - Local RAR proposals submitted 1/27 -
CAISO resubmitted 2006 LCR study
6/15 - CPUC vote on dec
10/2 - LSE submit RA filings for both 2007 System
RAR (year ahead) and 2007 Local RAR
4/18 - Opening Comments due
2/17 - CAISO started 2007 LCR study after the
meet confer session
5/3 - Close of CPUC Proceediing Record
4/28 - Reply Comments due
9New Long Term Procurement Plan Proceeding
R.06-02-013
- Phase 1 Issue
- Need for Additional Policies to Support New
Generation - Proposals were due on March 7, 2006
- Workshop on March 14, 2006
- Comments on 4/7 and 4/14
- Planning for a June 2006 Decision
- Phase 2 Issues
- New Long Term Procurement Plans to be filed in
Summer, decision by end of year. - No additional schedule details yet on plan
filings
10Proposals to Support New Generation
- Commission received 18 responses on 3/2
- Blink We must intervene to ensure new
generation gets built - Dont Blink Give RA and LTPP policies a chance
to work (with numerous other fixes) - Proposals that support other issues
- Workshop - 3/14
- Discuss proposals and need numbers
- Intermediary Concept Presented
- Comments Received on 4/7
- Replies due on 4/14
11Upcoming Milestones in Procurement
- April 06 PGE Expected to file new Power Plant
Application - May 06 Additional Schedule Details to be
determined on LTPP Cycle - June 06 CPUC will consider Local RA Decision
- CPUC will consider New Generation Decision
- Summer 06 Long Term Procurement Plans Filed
- Oct. 2 06 LSEs file 2007 Local RAR
Demonstrations - LSEs file Year Ahead Summer 2007 RAR
- December 06 CPUC Decision on LTPP
- Spring 07 CPUC Decision on RA Phase 2 Issues
- Capacity markets
- RA General Order
12CPUC Procurement and RA Website
- Links to LTPP and RA key documents proposals
- www.cpuc.ca.gov/static/hottopics/1energy/r0404003.
htm