SWIM in SESAR - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

SWIM in SESAR

Description:

SWIM in SESAR – PowerPoint PPT presentation

Number of Views:124
Avg rating:3.0/5.0
Slides: 19
Provided by: lindag2
Category:
Tags: sesar | swim | nene

less

Transcript and Presenter's Notes

Title: SWIM in SESAR


1
SWIM in SESAR
  • Bob Graham
  • Head Concept Strategy Development

2
Agenda
  • SESAR
  • Work Programme
  • Concept Key Components
  • Conclusions

2
3
SESAR IS ORGANISED IN THREE PHASES
Definition phase
Deploymentphase
Development phase
Resulted in the European ATM Master Plan
Implements the results of the development phase,
delivers the service performance increase
foreseen in the ATM Master Plan
Managed by the SESAR Joint Undertaking
Based on the Master Plan, results in Standards,
new operational procedures, new technologies
and pre-industrial components,
2015-2025
2008-2014
2006-2008
4
SESAR JU A PUBLIC-PRIVATE PARTNERSHIP
NORACON
5
Strategic Approaches
  • Partnership
  • Concept Story Board
  • Validation and Verification
  • Architecture / Technology
  • Business
  • Top Down PMP System Engineering

6
Agenda
  • SESAR
  • Work Programme
  • Concept Key Components
  • Conclusions

6
7
Enroute-to-Enroute to encapsulate Gate-to-Gate
WP7 / 13
WP B / C
WP15
WP3 WP16
WP9 / 11
WP9 / 11
ToC
ToD
ToC
ToD
WP5 / 10
WP5 / 10
WP4 / 10
WP4 / 10
CTA
CTA
WP5 / 10
WP5 / 10
WP6 /11/ 12
WP6 /11/12
WP6 /11/ 12
WP8 / 14
7
8
WPB - Target concept Architecture
WPC Master Plan maintenance
The technical solutions to the operational
need Interoperable through standards
The common definitions and logic Facilitation
of delivery of information
The interoperable operational services The
information needed
WP3 Validation Infrastructure
WP16 Transversal areas
8
9
Agenda
  • SESAR
  • Work Programme
  • Concept Key Components
  • Conclusions

9
10
Building SESAR Concept of Operations
11
SWIM in All of That?
  • Moving from airspace to trajectory based
    operations, so that each aircraft achieves its
    agreed route and time of arrival and air and
    ground systems share a common system view.
  • Collaborative planning so that all parties
    involved in flight management from departure gate
    to arrival gate can strategically and tactically
    plan their business activities based on the
    performance the system will deliver.
  • An information rich ATM environment where
    partners share information through system wide
    information management.
  • A globally agreed 4D trajectory definition and
    exchange format at the core of the ATM system
    where time is the 4th dimension providing a
    synchronised time reference for all partners.
  • Airspace users and aircraft fully integrated as
    essential constituents and nodes of the ATM
    system.
  • Dynamic airspace management and integrated
    co-ordination between civil and military
    authorities optimising the available airspace.
  • Network planning focused on the arrival time as
    opposed to todays departure based system, with
    Airport airside and turn-around fully integrated
    into ATM.
  • New Communication, Navigation Surveillance
    (CNS) technologies providing for more accurate
    airborne navigation and spacing between aircraft
    to maximise airspace and airport efficiency,
    improve communication and surveillance.
  • Central role for the human widely supported by
    automation and advanced tools ensuring safe
    working without undue pressure.

12
Concept Story Board
Developing SESAR
13
ATM Operational Roadmap
14
ATM Operational Services
15
Working Together on Validation ?
  • Validation opportunity - partnering with projects
    ?
  • Identify suitable projects, negotiate the
    opportunity
  • Look at the WPx.3 (integrated validation)
  • Bring the issue directly (back) to the SJU.
  • Clearly Articulated
  • Justified
  • Proposals

16
Validation Opportunity
17
Conclusion
  • A Private Public Partnership
  • About change it will change our business and way
    of working
  • Performance Based and Service Oriented
  • Incremental Approach with Operational Steps and
    ATM Operational Services
  • About information and information management, The
    ATM Intranet
  • Information is the baseline for planning and
    execution of the Business / Mission Trajectories
  • Validation through alliances with appropriate
    projects?

17
18
Thank you
www.sesarju.eu
EUROPEAN COMMISSION
Write a Comment
User Comments (0)
About PowerShow.com