Distribution Statement C: Authorized for Government Agencies and their Contractors Only SSP T&ME LCS Program Overview Michal Dusendang (812) 854-2358 michal.dusendang – PowerPoint PPT presentation

Number of Views:67
Avg rating:3.0/5.0
Slides: 20
Provided by: navicpmar
Category:

less

Transcript and Presenter's Notes

Title: Distribution Statement C: Authorized for Government Agencies and their Contractors Only


1
Distribution Statement C Authorized for
Government Agencies and their Contractors Only
2
  • SSP TME LCS
  • Program Overview
  • Michal Dusendang
  • (812) 854-2358
  • michal.dusendang_at_navy.mil

3
Topics
  • SSP TME LCS Organization
  • SSBN
  • SSGN
  • Key Program Instructions
  • Key Responsibilities
  • SSP Technical Branches
  • SSP TME Requirements Process
  • NAVSEA Requirements Process

4
SSP LCS Organization
SP201 J. SCHAEFER
INTERFACE ROLE
SP2015 B. MORRISON
SP2016 M. RIVERA
NAVY TAMS EXECUTIVE BOARD
SP20163 E. ZACHARIA TME LCS
SP206 P. VOTH LOGISTICS
SP502 A. HUNT
STRATSYS SSGL UK CAL LAB
NAVSEA 07T112 F. COLEMAN
NSWC CRANE (CSM) R. ALLEN
UII (CDM) O. ROBINSON
SWFLANT/PAC (TSBs) J. LANGE / S. SCHAFER
NSWC CORONA (QAM) P. THORNBERRY
NSWC CORONA, MSD (CTM) R. FIGURRES
5
SSBN
  • Fourteen Ohio-Class SSBNs
  • Eight home ported in Silverdale, WA
  • Six home ported in Kings Bay, GA
  • Notional Schedule
  • 21 day maintenance period at home port
    (Silverdale, WA or Kings Bay, GA), 90 Day
    deployment.
  • Two Crews (Blue/Gold)
  • Calibration Support
  • Calibration exchanges of portable TME conducted
    during 21 Day maintenance period 100 portable
    TME calibrated at all times
  • SWFPAC/SWFLANT Navy Calibration Laboratories
    support/coordinate installed and installed
    removable I Level TME calibration support.

6
SSGN
  • First Four Ohio-Class SSBNs converted to SSGN
  • USS Ohio, USS Michigan, USS Florida, USS Georgia
  • Notional Schedule
  • 3-Month Major Maintenance Period at home port
    (Bremerton, WA or Kings Bay, GA), 15 month
    deployment, including 3 forward deployed voyage
    repair periods (VRP).
  • Calibration Support
  • Two calibration exchanges of portable TME
    conducted during MMP (upon return from
    deployment, and just prior to departure)
  • Calibration exchange of portable TME conducted
    at each VRP to lessen impact on forward labs.
  • Short interval installed instruments supported by
    VR site laboratories
  • USS Frank Cable (AS-40) Guam
  • NAVAIR Calibration Laboratory Diego Garcia

7
Key Program Instructions
  • OPNAVINST 3960.16A (TMDE, ATS, METCAL)
  • SSPINST 4200.7C (TME LCS Instruction)
  • OPNAVINST 4000.57F (TRIDENT Logistics Support)
  • OD63913 (METPRO)
  • OD55373A (TME LCS Procedures)
  • OD55551 (SSBN Substitution Guide)
  • OD64498 (SSGN Substitution Guide)
  • OD65701 (Calibration Support Procedures for SSGN
    Forward Deployment)

8
Key Responsibilities for LCS
  • SSPINST 4200.7C (TME LCS Instruction)
  • Paragraph 3.a TME covered by this instruction
  • (1) All SWS, AWS and non-SWS/AWS GPTE, SPTE, GPS
    and SPS onboard SSBN/SSGN
  • Paragraph 7 Responsibilities
  • f. NAVSEA and SPAWAR shall
  • Submit data sheets
  • Outfit and replace non-SWS TME (excluding
    exchange pool)
  • Provide support for new requirements (procedures,
    intervals, equipment)
  • Provide maintenance documentation to NSWC Crane
  • Provide authorized substitute information for
    OD55551
  • Ensure that NAVSEA resources (e.g., provision of
    authorized onboard FCA portable calibrators,
    audit of FCAs, evaluation and certification of
    FCAs, provision of O level calibration
    procedures).and notify SSP when changes are
    planned.

9
SSP Technical Branches
SP23/27
SP23
SP24
INSTRUMENTATION SUBSYSTEM
NAVIGATION SUBSYSTEM
INTERSTATE ELECTRONICS CORP
N
LMNESS/BOEING
FIRE CONTROL SUBSYSTEM
E
GENERAL DYNAMICS ADVANCED INFORMATION SYSTEMS
W
NAVSEA/SP21
S
SP22
SP28
SP23
SP27
GUIDANCE SUBSYSTEM
CHARLES STARK DRAPER LABORATORIES, et al
10
SSP Requirements Process
Originator (generally contractor) initiates TME
Requirement (Data Sheet) via web site
https//tmecranrdte.navy.mil
11
SSP Requirements Process
  • Data Sheet Identifies
  • Originator and Approving Official (SSP or NAVSEA
    Cog)
  • New, Revised or Cancelled Requirement
  • SPTE or GPTE
  • Specific Model, Accessories, Authorized
    Substitutes chosen from OD 54585 Selection List
  • Procurement Required and by who
  • Calibration Support (Completed by MSD)
  • Repair Support
  • Allocation (SSBN, Work Center, Qty, Prime System)
  • Procedural Documents for Requirement (MRC, SMP,
    Tech Manual, RPM, etc.)

12
SSP Requirements Process
13
SSP Requirements Process
  • Electronic Data Sheet Routing Process Flow
  • Originator Creates
  • Designated Government Rep Approves
  • NSWC Crane Review
  • Ensure proper TME selection and non-proliferation
  • Update allowance documentation, initiate
    procurement, update OD55551 (SSBN Substitution
    Guide)
  • NSWC Corona Review
  • Determine calibration support level, update
    METRL, identify ICP

14
SSP Requirements Process
15
NAVSEA Requirements Process
Upload PMS FR
Identify MRCs added, deleted or changed
Identify TME impact
Run comparison routine
Cancel Requirement and Remove TME if required
New Requirement
Link Requirement to Data Sheet
No
Yes
Generate Matrix of Data Sheet requirements
Proliferation of TME
Initiate Data Sheet
No
Yes
Use Equipment Onboard
16
NAVSEA Requirements Data
17
TME Matrix
18
NAVSEA 08 Requirements Process
  • BPMI generate new requirements (Data Sheets)
  • NAVSEA 08 approve requirements
  • NAVSEA 08 determine revised or cancelled
    requirements
  • BPMI procure initial outfitting and exchange
    pool
  • NSWC Crane push requirements to exchange
    pool/boats (need schedule)
  • NSWC Crane update GPTE Addendum with NAVSEA 08
    SCAT requirements
  • NAVSEA 08 remove SCAT requirements from QCOSAL?
  • NSWC Crane update Matrix

19
Questions?