Project Enhancement of the capacity and consolidation of the riverbeds of Beli Lom River and Dobrudz - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

Project Enhancement of the capacity and consolidation of the riverbeds of Beli Lom River and Dobrudz

Description:

The project idea is directly connected with the Municipal Plan for Development ... Cutting and clearing the greenery; Correction of the Beli Lom river beds; ... – PowerPoint PPT presentation

Number of Views:33
Avg rating:3.0/5.0
Slides: 8
Provided by: razgr
Category:

less

Transcript and Presenter's Notes

Title: Project Enhancement of the capacity and consolidation of the riverbeds of Beli Lom River and Dobrudz


1
Project Enhancement of the capacity and
consolidation of the river-beds of Beli Lom
River and Dobrudzha Channel in Razgrad
Logo East Programme
  • Joint project of Municipality of Razgrad,
    Municipality of Assen (the Netherlands),
    Municipality of Poznan (Poland), consulting
    Non-governmental organization Activa (the
    Netherlands) and members of the local community

2
RATIONALE
  • The project idea is directly connected with
    the Municipal Plan for Development for the period
    2007-2013 (Priority 2 Planned construction,
    rehabilitation and modernization of the Municipal
    infrastructure, Specific objective 2.4
    -Improvement of the ecological infrastructure,
    Measure 2.4.5 Consolidation and correction of the
    river-beds)
  • The implementation of the project proposal will
    lead to improvement of the living environment and
    supporting the ecological balance in the region
    through prevention of floods and landslides and
    restraint on the bank erosion of the runways of
    Beli Lom River and Dobrudzha Channel.

3
OBJECTIVES
  • Reach the maximum capacity of the river-beds of
    Beli Lom River
  • Prevention in cases of floods the adjoining
    residential and public areas
  • Prevention the bank erosion and the destruction
    of the adjoining technical infrastructure
  • Improvement of the access to the near industrial
    and residential zones.

4
ACTIVITIES
  • Drawing up draft investment projects
  • Cutting and clearing the greenery
  • Correction of the Beli Lom river beds
  • Rehabilitation, facing the river beds and
    construction of other supporting installations
    (walls)
  • Rehabilitation and reconstruction of the existing
    bridge facilities.

5
CHARACTERISTICS
  • Budget of the project 1 250 000
  • Implementation period of the project
  • Start of the project activities January 2008
  • Implementation period 18 months
  • Possible threats for the project implementation
  • Unfavourable climate conditions for
    construction works
  • Natural disasters and averages
  • Changes in the legislation, concerning the
    implementation of such projects.

6
BENEFICIARIES
  • Residents of the municipality of Razgrad, in
    particular the residents in the housing complexes
    alongside the river
  • Representatives of the business sector, located
    in the neighbouring industrial zones
  • Tourists and visitors of the town and the
    municipality of Razgrad.

7
EXPECTED RESULTS
  • Quantity
  • Correction and facing of 5 square metres
    river-beds
  • Rehabilitation and reconstruction of 8 bridge
    facilities.
  • Quality
  • Improvement of the ecological and
    socio-economical status of the municipality
    through preventing from bank erosing, decreasing
    the cases of overflooding in the areas alongside
    the river and improvement of the business
    climate.
Write a Comment