Title: IS FAILURES The need for well run projects


1
IS FAILURESThe need for well run projects
  • Stan Price

2
A CAPITAL THREE
  • LONDON EMERGENCY SERVICES COMMAND CONTROL
    SYSTEMS.
  • AMBULANCE, FIRE POLICE.
  • AMBULANCE FIRE - LITIGATION
  • POLICE - SUCCESSFUL

3
LONDON AMBULANCE SYSTEM
  • EVERY MISTAKE MADE.
  • COMPREHENSIVE REPORT, BUT
  • SECOND TIME AROUND
  • CHIEF EXEC.

4
LONDON FIRE BRIGADE SYSTEM
  • 3M VALUE - 2M I.S. 1981 PRICES.
  • ENGINEERING LED.
  • WENT TO ENGINEERING COMPANY.

5
NIMROD MK3 -1
  • AIRBORNE EARLY WARNING SYSTEM.
  • 60 I.S.
  • CANCELLED BY THATCHER.
  • 2B SPENT.
  • EXISTING BOEING AWACS BOUGHT.

6
NIMROD MK3 - 2
  • CUT COST - USE AVAILABLE COMET FUSELAGES.
  • PHYSICAL RESTRICTION ON COMPUTER POWER.
  • 2 RADARS - MORE COMPLEX PROCESSING.
  • BAe - MARCONI SCHISM

7
NORTH WEST WATER - 1
  • TOTAL FINANCIAL CONTROL SYSTEM.
  • VISION - WORLDS MOST EFFICIENT PUBLIC UTILITY.
  • 60M SPENT WITH AA.
  • WHAT DID NWW HAVE TO SHOW FOR IT?

8
NORTH WEST WATER - 2
  • CLAIMS BASED ON US (LESS REGULATORY) EXPERIENCE.
  • NO SIGNIFICANT WORK UPFRONT JUST CHIEF EXEC
    DECISION.

9
BED LINEN MILL -1
  • 50K SYSTEM.
  • MAINLY STOCK CONTROL.
  • WENT LIVE.
  • LOST MAIL ORDER BUSINESS.
  • MAIN MILL CLOSED - COMPANY NEARLY WENT UNDER -
    LITIGATION.

10
BED LINEN MILL -2
  • INSUFFICIENT TESTING.
  • ONE MAJOR BUG MISSED.
  • ACTUAL DELIVERY NUMBERS RATHER THAN NUMBER
    ORDERED DEDUCTED FROM STOCK TOTALS.

11
WAFER-FAB PLANT SCHEDULING SYSTEM - 1
  • SMALL BATCHES, VARIABLE, PRODUCTION PATHS,
    EXPENSIVE UNRELIABLE PLANT.
  • MAXIMISE YIELD.
  • COLLAB RESEARCH PROJECT.
  • NOW USED IN EVERY WAFER-FAB IN WORLD.

12
WAFER-FAB PLANT SCHEDULING SYSTEM - 2
  • ACE PROJECT LEADER (MANAGER).
  • DECISIVE DECISION.
  • ACE TEAM.
  • 1B PLANT AS TEST BED.

13
NOT JUST IN UK
  • DENVER AIRPORT BAGGAGE SYSTEM.
  • FAA 6B AAS SYSTEM.
  • FRENCH SNCF TGV RESERVATION SYSTEM (SOCRATE) .
  • SYDNEY AIRPORT APPROACH CONTROL.

14
SOCRATE - 1
  • RESERVATIONS FOR START OF TGV NORD.
  • BASED ON AIRLINE SYSTEM.
  • WENT LIVE 1993
  • GETTING TICKET PARIS- LILLE TOOK LONGER THAN
    JOURNEY.
  • STRIKES LESS PASSENGERS.

15
SOCRATE - 2
  • INTRODUCED IN UNSTABLE ENVIRONMENT.
  • DOUBLE TICKETING PHILOSOPHY CHANGE.
  • NO LIVE TESTING.
  • BIG BANG INTRODUCTION.
  • INSUFFICIENT TRAINING.

16
SWANWICK ALIAS NERC - 1
  • NEW LONDON EN-ROUTE ATC CENTRE - 50 IS.
  • ORIGINAL OPERATIONAL DATE 1996.
  • CURRENT CONFIDENT ESTIMATE 2001/2.
  • MANAGEMENT IN DENIAL.

17
SWANWICK ALIAS NERC - 2
  • TARGET DATE POLITICAL.
  • MIX OLD/NEW SYSTEMS TO MEET DATE.
  • FRAGMENTED ORGANISATION.
  • SHOOT MESSENGER CULTURE.
  • NEW BRIGADE.

18
IS - THE BIG Myths
  • IS can be fully specified at the start.
  • IS are always good for you.
  • Software is an engineering commodity that can be
    predictably manufactured.

19
IT DELIVERY TEN
COMMANDMENTS - 1
  • BE REALISTIC.
  • MANAGE RISK.
  • THINK OF EVERYTHING.
  • STAFF WELL.
  • MOTIVATE STAFF.
  • PROMOTE TEAMS IN OPEN CULTURE.

20
IT DELIVERY TEN
COMMANDMENTS - 2
  • USE A TRULY PROVEN PROCESS.
  • KEEP FOCUSED.
  • MAXIMISE CREATIVITY/MINIMISE BUREAUCRACY.
  • AVOID DOGMATISM PARTICULARLY ABOUT TECHNOLOGY.

21
RECOMMENDATION
  • Teach I.S. Project Management in a Real Life
    Realistic Environment.
Write a Comment
User Comments (0)