Title: Geographic Integration, Transmission Constraints, and Electricity Restructuring
1Geographic Integration, Transmission
Constraints, and Electricity Restructuring
March, 2005 Not for Quotation without Authors
Permission
Andrew N. KleitJames D. Reitzes
- Pennsylvania State University and The Brattle
Group, respectively. - The authors can be contacted at ank1_at_psu.edu and
james.reitzes_at_brattle.com.
2Topics for Discussion
- How to Estimate Arbitrage Costs
- How to Modify the Arbitrage Cost Model for
Electricity Markets in Order to - Estimate the Impact of ISO formation on
Electricity Trading Costs - Assess the Prevalence of Binding Transmission
Constraints under Different Transmission
Organizational Regimes -
- ? How to Estimate the Shadow Value of Adding
Further Transmission Capacity - All with easily available data!
3Arbitrage Cost Estimation
4Arbitrage Cost Estimation Basic Methodology
- The basic arbitrage cost model was developed by
Spiller and Wood (1988), who examined integration
of regional gasoline markets. - Other papers using a similar model include
Sexton et al. (1991) for celery Kleit and
Palsson (1996, 1999) for Canadian cement and
Kleit (1998) in natural gas. -
-
5Arbitrage Cost Estimation Basic Methodology
(cont.)
- Use maximum likelihood techniques to distinguish
two regimes - (a) Arbitrage (Unconstrained Trade) -
inter-regional price differences represent
marginal trading costs. - (b) Autarky - inter-regional price differences
most likely reflect differing regional supply and
demand conditions. - Under autarky,
- (i) no trade occurs, or
- (ii) trade occurs on a long-term contract basis
but does not respond to short-term
arbitrage opportunities.
6Arbitrage Cost Methodology
- Assume a (stochastic) cost of arbitrage the
cost of shippinga good from Region 1 to Region 2
(or vice versa). - The price difference between the two regions
cannot exceed arbitrage costs.
7Basic Arbitrage Cost Model
- Let P1 price of the good in Region 1,
- Let P2 price of the good in Region 2,
- Let Y P1-P2.
-
- Without the threat of arbitrage, the price
difference between the two regions is determined
by the autarky relationship - ?PN ? ?, (1)
-
- ? constant ? N(0, ?2).
-
8Basic Arbitrage Cost Model (cont.)
- If price in Region 1 becomes much higher than
price in Region 2, buyers in 1 will arbitrage the
difference by buying the good in 2 and shipping
to 1. - Now define the arbitrage (i.e., trading) cost of
sending the good from Region 2 to Region 1 - T1 T 1 ? 1, (2)
- ? 1 N(0, ? 12), truncated from below at
-T1 - The reason for the truncation from below is that
arbitrage costs must be nonnegative, (i.e., T1
gt0).
9Basic Arbitrage Cost Model (cont.)
- Now, an observed price difference, Y P1-P2gt0,
could result from two possible states -
- (1) autarky (i.e., the absence of arbitrage),
implying that - arbitrage costs exceed the observed price
difference - ?PN Y and T1gtY.
- (2) arbitrage, implying that the price
difference would be larger under autarky - T1Y and ?PN gt Y.
10Basic Arbitrage Cost Model (cont.)
- The likelihood of observing a particular value of
Y is therefore as follows - L(Yi) Likelihood (?PNYi and T1gtYi)
- Likelihood (T1Yi and ?PNgtYi), (3)
- L(Yi) f(?PNYi)(1-F(T1Yi))
- f(T1Yi)(1-F (?PNYi)), (4)
- where f pdf, Fcdf.
- This is a variant of Tobit with stochastic limits.
11An Extension to the Basic Arbitrage Cost Model
- Autarky price differences should be related to
structural factors (i.e., cost and demand
conditions) in each regional market. -
(7)
12Electricity Restructuring and Market Integration
13Electricity Restructuring and Market Integration
- ISOs were designed to facilitate wholesale
electricity trading by lowering trading costs and
mitigating incentives to manipulate the
transmission system. - --- Has this occurred?
- Hardly any analysis has been performed on this
question. - Thus, we examine the impact of forming the PJM
ISO on electricity trading costs between PJM and
New York and between PJM and the ECAR Reliability
Region.
14Modified Arbitrage Cost Model
- Adding Quantity-Constrained Trade
15Adjusting the Arbitrage Cost Estimator for
Electricity Markets
- Since transmission capacity limits and
institutional impediments may constrain the
quantity of electricity that can be traded
between regions, we modify the traditional
arbitrage cost model to consider three possible
equilibrium states - (1) autarky
- (2) arbitrage (i.e., unconstrained trade), and
- (3) quantity-constrained trade.
16Quantity-Constrained Trade
- Quantity-constrained trade represents a state
where trade takes place up to some capacity
limit, and no more. - Capacity limit can be a physical or institutional
trading barrier. - .
17Quantity-Constrained Trade
- We express the price differential between regions
1 and 2 under quantity-constrained trade as - Ci Ai - FLOWi ?
- Zi'? - FLOWi ? (9)
- Thus, the quantity constrained price difference
equals the autarky price difference, less FLOW1,
where FLOW1 represents the change in the price
difference induced by the flow of electricity
from one region to another up to the available
quantity limit.
18Likelihood Function with Quantity-Constrained
Trade
L(Yi) Likelihood (?PiNYi and T1i Yi)
Likelihood (T1iYi and ?PiN gtYi C1i)
Likelihood (C1iYi and ?PiN gt Yi gtT1i).
(10)
19Modified Trading Cost Equation
- We add indicator variables to estimate the impact
on trading costs of - (a) the formation of the PJM ISO (April 1,
1998) - (b) PJMs switch from cost-based to
market-based - bidding (April 1, 1999)
- Revised trading cost specification is
- T1 T 1 ß98I98 ß99I99 ? 1,
(2') - where I98 1 after April 1, 1998 else 0
- I99 1 after April 1, 1999 else 0
- ? 1 N(0, ? 12), truncated from below at -(T1
ß98I98 ß98I99)
20Calculating Regime Probabilities Using
Bayesian Updating
Recall Pr(AB) Pr (AnB)/Pr(B). Writing
in likelihood space, Pr(AutarkyYi)
L(AutarkynYi)/L(Yi) We calculate probabilities
similarly for the unconstrained and constrained
trading states.
21Institutional Detail and Data
22Institutional Detail
- Our analysis focuses on arbitrage costs
involving - PJM - New York
- PJM ECAR
- On April 1, 1998, the PJM exchange market began
with only cost-based bidding permitted. - However, no explicit mechanism existed for
monitoring compliance with costs. - PJM members were allowed to supply electricity at
market-based rates outside of PJMs service
territory (and through bilateral transactions
within PJMs territory).
23Institutional Detail (cont.)
- After April 1, 1999, market-based bids were
allowed within PJMs service territory. - We use indicator variables to distinguish 3
periods - (i) before April 1998
- (ii) between April 1998 and March 1999
- (iii) April 1999 and after.
24Data
- Time period
- January 1997-July 2002
- --- 1350 observations
- Dependent variable
- daily electricity prices (PJM, NY, ECAR)
- --- volume-weighted averages of the contract
prices - for pre-scheduled, day-ahead 1x16
electricity blocks - (Power Markets Week)
25Data (cont.)
- Demand shifter
- temperatures (PJM, NY, ECAR)
- --- summer and winter degree days calculated
from NOAA temperature data - Cost shifter
- fuel costs
- --- Henry Hub gas prices
26The Results
27Autarky Parameters PJM/NYISO(t-stats in
parentheses)
28Transaction Costs PJM/NYISO(t-stats in
parenthesis)
29Mean Transaction Costs PJM/NYISO(/MWh)
30Expected State Probabilities PJM/NYISO
31Conclusions PJM-NYISO
- Transaction costs fell to PJM from NY, subsequent
to formation of PJM ISO. - Transaction costs to NY from PJM rose by more
than 2/MWh after PJM switched from cost-based to
market-based bidding. - Explanation (1) more inward focus by PJM
suppliers after market-based bidding (2)
differing ISO protocols, perhaps. - Prevalence of quantity-constrained trade similar
in each direction for PJM-NY, but results will be
different for PJM-ECAR!
32The Results
33Autarky Parameters PJM/ECAR(t-stats in
parentheses)
34Transaction Costs PJM/ECAR(t-stats in
parenthesis)
35Mean Transaction Costs PJM/ECAR(/MWh)
36Expected State Probabilities PJM/ECAR
37Conclusions PJM-ECAR
- Transaction costs to PJM from ECAR fell by nearly
1/MWh after formation of PJM exchange market. - Improved price discovery, perhaps.
- Transaction costs to PJM from ECAR rose by more
than 2/MWh after PJM switched from cost-based to
market-based bidding.
38Conclusions PJM-ECAR (cont.)
- High prevalence of quantity-constrained trade
when ECAR has higher prices than PJM is striking,
given apparent lack of binding physical
transmission constraints moving from PJM into
ECAR. - Results suggest that significant efficiencies in
transmission usage may arise from PJMs westward
expansion and the formation of an effective MISO.
39The Value of Expanding Transmission Capability
40Estimating the Shadow Cost of Quantitative Trade
Constraints
- Little research has attempted how to estimate the
efficiency losses imposed by existing quantity
constraints on electricity flows. - Estimating the shadow cost of quantity
constraints in terms of their marginal
contribution to inter-regional price differences
represents a means of assessing the value that
additional transfer capability (e.g.,
transmission capacity) could provide.
41Estimating the Shadow Cost of Quantitative Trade
Constraints
- A two-stage process is used to estimate the
shadow cost arising from quantity constraints
on electricity flows. - (1) We take the observed price difference on each
day and subtract our estimated mean transaction
cost, assuming constrained trading. - Assuming quantity-constrained trade, an
incremental increase in electricity flows from a
lower-priced to a higher-priced region will
reduce energy costs by the observed price
difference, less the transaction cost. - (2) The amount in (1) is multiplied by the
estimated probability that the observed
inter-regional price difference on that day
is associated with quantity-constrained trade.
42(No Transcript)
43(No Transcript)
44(No Transcript)
45Estimated Annual Shadow Cost of Quantity Trade
Constraints (/MW)
- Annual Shadow Cost (Total Shadow Cost)/5.33
years. - Total Shadow Cost S (Actual Daily Observed
Price Difference - Estimated Mean Transaction
Cost) (Probability That Observed State Is
Quantity-Constrained Trade).
46Conclusions Value ofIncreased Transmission
Capability
- Additional transmission capability has
substantial peak load value. -
- Most of shadow value is derived from lessening
price spikes in summer months. - Highest shadow value of increased transmission
capability is to ECAR from PJM (nearly 19,000
per MW year), which may not be a physical
transmission constraint but rather an
institutional constraint.