3Reverse engineer complete swimming pool design to
be code compliant add heating system. Solar
Direct was contracted to bring the pool that was
built in 1961 up to current Health Department
codes, and integrate a new pool heating system
into the plans. In-house engineers engineered
all hydraulic and electrical aspects of the pool,
and completed new CAD Plans and Submittals for
the Health Department. The new heating system
consisted of six Heat Pumps and one 950,000BTU
Gas Backup Heater. The Heaters utilized a custom
built Sequence Control to prevent high electric
demand usage. The Heat Pumps have a C.O.P.
(Co-efficient of Performance) of 5.7, making them
over 570 more efficient than a gas heater.
Project Objective
4Site Plan
5Heat Pump Equipment Area
6Equipment Room
7Equipment Room Detail
8Pool Plumbing
9Sanitation Schematic, Pump Detail
10Project Management and Turn Key Installation
provided by Solar Direct technicians
11Heat Pump Sequence Control
12Final stage operational heat pumps showing
plumbing.