CONSTRUCTION COST DATA OF PAKISTAN INSTITUTE OF COST AND CONTRACTS (PICC) (www.picc.org.pk) By: Engr.M.Mazhar-Ul-Islam (CEO PICC) - PowerPoint PPT Presentation

1 / 32
About This Presentation
Title:

CONSTRUCTION COST DATA OF PAKISTAN INSTITUTE OF COST AND CONTRACTS (PICC) (www.picc.org.pk) By: Engr.M.Mazhar-Ul-Islam (CEO PICC)

Description:

* * A contract is a set of conditions at a price Unreasonable construction cost and inadequate cash flows results poor quality delayed construction Right cost of ... – PowerPoint PPT presentation

Number of Views:1446
Avg rating:3.0/5.0
Slides: 33
Provided by: ITDe64
Category:

less

Transcript and Presenter's Notes

Title: CONSTRUCTION COST DATA OF PAKISTAN INSTITUTE OF COST AND CONTRACTS (PICC) (www.picc.org.pk) By: Engr.M.Mazhar-Ul-Islam (CEO PICC)


1
CONSTRUCTION COST DATAOFPAKISTAN INSTITUTE OF
COST AND CONTRACTS (PICC) (www.picc.org.pk)By
Engr.M.Mazhar-Ul-Islam(CEO PICC)
2
BACKGROUND
  • A contract is a set of conditions at a price
  • Unreasonable construction cost and inadequate
    cash flows results poor quality delayed
    construction
  • Right cost of contract for sustainable
    construction
  • Departmental FBS data found inadequate
  • Need exists for single source authentic data for
    all construction inputs

3
BACKGROUND
  • Needed organization having capacity to prepare
    such data
  • Since year 2007 MoH W initiated such efforts
  • PPRA formally requested to PEC to be resource
    organization for such data
  • Working papers finalized after two years
    deliberations by 12 organizations
  • PEC amendment Bill 2011 envisages creation of
    subsidiary and preparation of construction cost
    data as PEC function

4
ESTABLISHMENT OF PICC
  • Approved by Governing Body on April 30th 2009 Rs.
    50 million seed money for PICC as subsidiary
  • Commenced Operation from May 01, 2009
  • Cost data was hosted on website on Sep 2009
  • PC-1 for three years with an amount of Rs. 118
    million approved by MoST and sent on 13.07.11 to
    PC for CDWP approval

5
ORGANIZATION AND MANAGMENT
  • Incorporated in Lahore with SECP U/s-42 of
    Company Ordinance as non- profit research
    organization
  • PICC members are member organizations-represented
    by their Natural persons
  • Majority members and Chairman in the PICC BoD
    are from PEC and other from NESPAK and APCA
  • Independent Board of Directors comprises of PEC
    and other Stakeholders.
  • CEO PICC to work under the PICC BoD
  • Recruited 35 staff including 8 Market Surveyors
    in major cities

6
ORGANIZATION AND MANAGMENT
  • National Steering Committee for controlling
    authenticity of cost data
  • Prepared and got approved comprehensive Service
    Manual from BoD.
  • PICC management committee holds meeting every
    week for decision making in managing the PICC
    affairs.
  • Recruitment is conducted in accordance with
    predetermined job description and criteria on
    merit.
  • State of the art online office environment.

7
PICC ORGANIZATION CHART
8
FUNCTIONS
  • Prepare, update and maintain on PICC website the
    cost data base for all construction inputs
  • Country specific schedule of rates
  • Country specific procurement documents
  • Guidelines for construction cost estimate
  • Standard method of measurement
  • Uniform classification system for specs BOQs
  • Training and research on cost and contracts

9
 PROGRESS
  • Maintaining, monthly updating and progressively
    uploading on the website the cost data, as per
    detail given below, for all the districts of
    Pakistan including AJK and Gilgit-Baltistan.
  • About 3134 basic input rates
  • About 1986 composite item rates for concrete,
    brick masonry, Stone masonry, Block masonry,
    steel bars, formwork, plastering, pile works,
    Earthwork and road works etc
  • Presently about 644,493 data items are being
    monthly updated which are to be increased
    progressively
  • Per unit rates and rates for quality control tests

10
 PROGRESS
  • Standard methods of measurements and Model BOQ
    guidelines have been developed in line with the
    international standards.
  • Comprehensive mechanism established for
    determining the Transportation Charges for
    various types of terrain.
  • Technical Specifications for concrete, masonry
    works, piles and water supply sanitation are
    developed and uploaded on website whereas for
    various other sections are under development.

11
AUTHENTICITY OF PICC COST DATA
  • PICC Steering Committee of Experts approved the
    PICC rates in six meetings before hosting to web
  • National Conference on Construction Cost on
    10.08.10 validate PICC Cost Data by 19
    stakeholders
  • Compared Oct-Dec, 2010 Govt of Punjab data with
    PICC
  • Bid price of 5 different projects was compared
    with PICC Cost data and found within 10
  • PICC rates for sand, aggregate etc is almost
    double in City than in quarry
  • PICC submitted itself for constant public review
    by displaying providers/ sources detail
    addresses

12
(No Transcript)
13
VIEW OF BASIC INPUT RATES
14
VIEW OF BASIC INPUT RATES
15
VIEW OF BASIC INPUT RATES
16
VIEW OF COMPOSITE ITEM RATES
17
VIEW OF COMPOSITE ITEM RATES
18
VIEW OF COMPOSITE ITEM RATES
19
BASIS FOR DETERMINATION OF TRANSPORTATION CHARGES
  • Truck Capacity Monthly Hired Truck of 10 Ton
    Capacity
  • Speed For a distance of 1 Km the Average Speed
    is taken 10 Km/hr. An increment of 0.5 Km/hr is
    considered for each Km upto a maximum average
    speed of 30 Km/hr
  • Diesel Oil Consumption Diesel_at_3Km/ Liter
    Engine oil_at_100Km/ Liter
  • Labor 06 No. Laborers are considered for
    Loading, Unloading Stacking within 3/ 4 Hours
    for each Trip
  • Allowances For Katcha, Hilly Hard Hilly Areas
    An allowance for Katcha Hilly Areas is
    considered as 25 where as For hard Hilly area as
    40
  • Toll Taxes Toll Taxes are also included

20
TRANSPORTATION CHARGES
  • A comprehensive mechanism is developed for
    determining transportation charges in various
    types of terrain

21
PRICE FLUCTUATION TRENDS OF MAJOR MATERIALS
22
PRICE FLUCTUATION TRENDS OF MAJOR MATERIALS
23
PRICE FLUCTUATION TRENDS OF MAJOR MATERIALS
24
(No Transcript)
25
VIEW OF TECHNICAL SPECIFICATIONS
26
UTILITY OF PICC COST DATA
  • Preparation of budget cost estimates
  • Preparation of Engineers Estimates
  • Cost validation of PC-1 and third party cost
    validation
  • Reference data for resolution of contractual
    disputes
  • Reference data for price adjustment
  • Reference data for Bidders to prepare the bids

27
BENEFITS OF PICC COST DATA
  • Verification for accuracy of project cost
  • Transparency in the estimates
  • Minimize malpractices and corruption
  • Quality construction
  • Timely completion
  • Effective contract administration
  • Minimizing cost overrun and financial loss to
    the National exchequer during the currency of
    contracts
  • Facilitate Cost Plus project execution

28
RECOGNITION OF PICC DATA
  • PICC cost data is appreciated in Seminars/
    Workshops-so far by UET and NUST.
  • ADB from Pakistan mission and Manila made 6
    visits and has approved the reward of Technical
    Assistance of 149,500 U.S Dollar.
  • Upon invitation CEO PICC presented PICC cost data
    in Feb, 2011 in Donors club (WB, USAID, EU,
    DFID, ADB) in Islamabad
  • PICC Cost data was presented in TCDPAP/FIDIC
    conference in Malaysia on 25 April 2011.
  • WB ADB arranged tour for presentation of PICC
    cost data in Kathmandu on 27 April, 2011 as
    model for South East Asia

29
SELF-SUSTAINABILITY PLAN
  • PICC yearly average budget is Rs. 25-30 M
  • PICC is established with Rs. 50 M seed money
    from PEC
  • Sustainability plan envisaged in PEC PC-1
  • 10 of constructors license fees (5th 8th GB
    Minutes)
  • 0.01 from ECNEC approved projects
  • Donations from stakeholders Donor agencies
  • Profit from training programs and Arbitration etc
  • Fees from users of PICC data
  • Advertisements

30
SELF-SUSTAINABILITY PLAN
  • PICC designed Self-sustainability plan in 3-5
    years
  • Issuance of Notification is key to success
  • ADB approved 149,500 grant for non-salary
    component
  • Year 2011-2013 from PC-1 amount Rs. 118 M

31
SELF-SUSTAINABILITY PLAN
  • Year 2013-2015 from 3 years earning and earning
    up to 2015
  • Self-sustainability beyond 2016 through
  • Professional services on cost contracts
  • Fees from users of PICC data
  • Advertisements on PICC website
  • Savings from training programs and Arbitration
  • Donations from stakeholders and Donor agencies
  • Year 2011-13 stop gap funding arrangement by PEC
    due to current financial crunch of GoP

32
Thank you