1
NEC Article 409 UL508A Industrial Control
Panels
  • Troy Miesse/ IE Business Development

2
Industrial Control Panels
3
Agenda
  • NFPA 70 National Electric Code (NEC)
  • Short Circuit Current Ratings
  • Article 409 Industrial Control Panels
  • UL508A (Supplement SB)
  • Arc Flash and NFPA 70E
  • Personnel Protection Equipment

4
National Electric Code
  • NFPA 70 National Electric Code (NEC)
  • Most states and Authorities Having Jurisdiction
    (AHJ) have adopted the 2005 NEC.
  • NEC is updated approximately every 3 years
  • Article 409 Industrial Control Panels was added
    to the NEC in 2005
  • Article 409 requires all industrial control
    panels to be marked with an SCCR.
  • Empty enclosures do not have a SCCR

5
What is a SCCR ?
  • A Short Circuit Current Rating is the maximum
    current a device or panel can safely withstand
    for 3 AC electrical cycles (50 msec.) or while an
    over-current protective device operates.
  • SCCR is usually expressed in RMS kA at the system
    voltage. Example 18 kA at 480 VAC
  • RMS is the Root Mean Squared AC current.
  • The SCCR of a fuse or circuit breaker is the same
    as its Interrupting Rating (IR).

6
NEC Article 409
  • Industrial Control Panel - An assembly of two or
    more components such as motor controllers,
    relays, CBs, etc..and related control devices
  • Industrial Control Panels do not include the
    controlled equipment.
  • Requires all industrial control panels to be
    marked with SCCR This is a major addition!
  • This addition will impact control panel builders,
    OEMs and end users in numerous ways
  • - How control panel are designed and marked
  • - The selection of power circuit components.
  • - The specification of preferred manufacturers.
  • - How control panels are installed and modified.

7
Before the NEC 2005
  • Only Industrial Machinery required marking for
    interrupting rating or SCCR of main over-current
    protective device
  • Industrial control panels, HVAC control panels,
    motor controllers, and meter disconnects were not
    required to be marked with SCCR

8
2005 NEC
  • The 2005 NEC requires SCCR markings on all
  • Industrial Control Panels -NEC Article 409
  • Motor controllers -NEC Article 430.8
  • HVAC controllers -NEC Article 440.4(B)
  • Industrial machinery -NEC Article 670.3
  • Meter disconnects -NEC Article 230.82(3)

9
How do I Determine the Panel SCCR ? NEC Article
409.110 states that the SCCR of an industrial
control panel is based on one of the following
  • SCCR of a Listed and labeled assembly
  • SCCR based on the use of an approved method
  • UL 508A Supplement SB is given as an example of
    an approved method
  • Method approved by local electrical inspector
    (AHJ)
  • Engineer (PE) approved apparent RMS method.

10
How do I Determine the Panel SCCR ? NEC Article
409.110 states that the SCCR of an industrial
control panel is based on one of the following
  • SCCR of a Listed and labeled assembly
  • Easy enough if you just buying the control panel
  • Not an option if you are building or specifying
    a control panel

11
How do I Determine the Panel SCCR ? NEC Article
409.110 states that the SCCR of an industrial
control panel is based on one of the following
  • SCCR of a Listed and labeled assembly
  • SCCR based on the use of an approved method
  • UL 508A Supplement SB is given as an example of
    an approved method

12
UL 508A Standard
  • UL 508A standard is Industrial Control Panels
  • The standard covers industrial control panels
    intended for general industrial use, operating at
    a voltage of 600 volts or less
  • This equipment is intended for installation in
    ordinary locations, in accordance with the
    National Electrical Code, ANSI/NFPA 70
  • Supplement SB is included to help determine SCCR
    for Industrial Control panels by providing, among
    other things, default SCCR ratings for common
    components

13
UL 508A Supplement SB
  • UL 508A Supplement SB describes three steps to
  • determine the SCCR of industrial control panels
  • Determine the SCCR of all individual power
    components by one of the following methods
  • - SCCR rating marked on the component
  • - Use assumed SCCRs in table SB 4.1 of Supplement
    SB
  • - Use the tested SCCR from component combinations
    per UL508
  • Modify the SCCR of certain series combinations if
    current-limiting devices are used in the feeder
    circuit.
  • Determine the overall panel SCCR according to
    charts in SB4.4
  • - Flow chart that help understanding and
    assignment of SCCR

14
UL 508A Standard Supplement SB
15
UL 508A Supplement SB (review)
  • UL 508A Supplement SB describes three steps to
  • determine the SCCR of industrial control panels
  • Determine the SCCR of all individual power
    components by one of the following methods
  • - SCCR rating marked on the component
  • - Use assumed SCCRs in table SB 4.1 of Supplement
    SB
  • - Use the tested SCCR from component combinations
    per UL508
  • Modify the SCCR of certain series combinations if
    current-limiting devices are used in the feeder
    circuit.
  • Determine the overall panel SCCR according to
    charts in SB4.4
  • - Flow chart that help understanding and
    assignment of SCCR

16
UL 508A Supplement SB4.4 Chart
17
SCCR Calculation Example Individual SCCRs
Main CB
Control Trans W/ fuses
  • Power Circuit SCCR at 480V
  • Main CB 30kA
  • Contactor 5kA
  • Overload Relay 5kA
  • Fuses on C-Trans 200kA
  • Control Circuit
  • Control Trans ---
  • Control Relay ---
  • Terminal Blocks ---

Control Relay
Terminal Blocks
Contactor W/ Overload
18
SCCR Calculation Example Individual SCCRs
Main CB
Control Trans W/ fuses
  • Power Circuit SCCR at 480V
  • Main CB 30kA
  • Contactor 5kA
  • Overload Relay 5kA
  • Fuses on C-Trans 200kA
  • If no additional information is available the the
    Industrial Control Panel must be rated at the
    lowest rating of any component 5kA

Control Relay
Terminal Blocks
Contactor W/ Overload
19
SCCR Calculation Example Tested Combinations
Main CB
Control Trans W/ fuses
  • Power Circuit SCCR at 480V
  • Main CB 30kA
  • Contactor 5kA
  • Overload Relay 5kA
  • Fuses on C-Trans 200kA
  • Control Circuit
  • Control Trans ---
  • Control Relay ---
  • Terminal Blocks ---

Control Relay
Terminal Blocks
Contactor W/ Overload
20
SCCR Calculation Example Tested Combinations
  • Power Circuit SCCR at 480V
  • Main CB
  • Contactor 30kA
  • Overload Relay
  • Fuses on C-Trans 200kA
  • UL508 component combination test results show
    that the CB and starter combination can be rated
    at 30kA. The Industrial Control Panel can now be
    rated at a higher SCCR 30kA

21
How to Increase SCCR
  • Use components and approved combinations with
    higher rated SCCRs.
  • Use current limiting over-current protective
    devices (CB/ fuses) whenever possible.
  • Replace low interrupting rated over-current
    protection with higher rated ones (retrofit).
  • According to UL 508A Articles SB3.2 and SB4.4,
    the SCCR of the panel cannot be greater than the
    interrupting rating of any over-current
    protective device in branch circuits or in the
    primary of control circuits.

22
Industrial Control Panel Marking
  • Per NEC an industrial control panel shall be
    marked with the
  • following information that is plainly visible
    after installation
  • Manufacturers name, trademark, etc.
  • Supply voltage, phase, frequency and full-load
    current
  • SCCR
  • Identify as service equipment (if applicable)
  • Electrical wiring diagram or the index number
  • Enclosure type (rating) number

23
Panel Marking
24
On-site Compliance
  • On-site engineer provides the following
    information
  • Available short circuit current at installation
    point
  • Planned SCCR of the equipment or panel
  • Inspector compares actual marked SCCR to the
    provided data
  • If SCCR data is accurate then approval is give
  • Inaccurate or incomplete data can result in
    red-tag and may require additional analysis
  • Engineers and inspectors must work together

25
Industrial Control Panel Marking
  • Why are Marked SCCRs Important?
  • Needed to ensure compliance with NEC and UL508A
  • Helps to eliminate hazards where components and
    equipment could be applied above their ratings
  • Simplifies inspection approval process for
    engineers and inspectors
  • New installations
  • Machinery relocation
  • Contributes to a safe electrical system
  • Guards against arc-flash hazards

26
What is Arc Flash?
27
What is an Arc-Flash?
  • A flow of current through the air between phase
    conductors or phase conductors and neutral or
    ground
  • Usually unintentional
  • Causes include
  • Human error
  • Insulation failure
  • Animal interference
  • 5-10 times per day in U.S. - arc flash accidents
    injure or kill a worker

28
Arc-Flash Hazard Standards
  • OSHA Standards 29-CFR, Part 1910 Work safety
  • NFPA 70 (NEC) Warning label requirements
  • NFPA 70E 2004 Appropriate work practices
  • IEEE 1584 2002 Arc flash hazard calculations

29
Arc-Flash Hazard
  • An arc flash hazard is defined in NFPA 70E as a
    dangerous condition associated with the release
    of energy caused by an electric arc
  • The NEC requires a label that states the
    existence of an arc flash hazard
  • OSHA regulations state the employers shall
    protect employees from recognized hazards
  • NFPA 70E tells employers how to protect employees
    from recognized hazards
  • IEEE 1584 shows the math to calculate the hazards

30
Arc-Flash Panel Marking
  • Flash Protection Boundary 2.9 ft
  • Boundary where person could receive 2nd
    degree burns from arc flash - 1.2 cal/cm2
  • Incident Energy 2.3 Cal/ cm2
  • Amount of energy produced during an arc flash
  • Working Distance 18 in.
  • The distance between worker and arc source
  • Required PPE Level 1
  • Protective clothing and apparatus to protect
    against arc flash injury

31
Arc-Flash Panel Marking
  • Shock Hazard Voltage 3450 VAC
  • Potential voltage levels that can be delivered
  • Limited Approach 10.0 ft.
  • Shock protection boundary Qualified personnel
    only unless escorted
  • Restricted Approach 2.2 ft.
  • Shock protection boundary Qualified personnel
    only with PPE
  • Prohibited Approach 0.6 ft.
  • Shock protection boundary Qualified personnel
    only with PPE (contact is possible)

32
Arc-Flash Hazard
  • Arc Flash Hazard boundaries are based on voltage,
    available short-circuit current and predicted
    fault duration
  • Different levels mean different protective gear
    required when servicing a panel ( i.e opening the
    panel door)
  • This applies to all personnel that may need to
    access the panel or be exposed to live equipment
  • May need an Arc Flash analysis performed
  • Determine arc flash protection boundaries
  • Personnel Protection Equipment (PPE) and training
    is a must

33
What Does OHSA Say?
  • OSHA regulations state in 1910.333 (a) that
    workers should not work on or near exposed live
    equipment (greater than 50 volts) except for one
    of two reasons
  • De-energizing introduces additional or increased
    hazards such as cutting ventilation to a
    hazardous location.
  • Infeasible due to equipment design or operational
    limitations such as when voltage testing is
    required for diagnostics. When it is necessary to
    work on energized equipment you should follow
    safe work practices including assessing the
    risks, wearing proper PPE, and using the proper
    tools

34
Personnel Protection Equipment - PPE
  • PPE is designed to minimize injuries
  • NFPA 70E requires any body part that is within
    the flash protection boundary be protected by
    using appropriate PPE (OSHA say basically the
    same thing)
  • Hard hat
  • Safety glasses or goggles (Arc-rated face shield)
  • Hearing protection
  • Gloves (leather, rubber)
  • Flash suit (multi-layer clothes)
  • Leather work shoes

35
Personnel Protection Equipment - PPE
  • Notes
  • 1 cal/ cm2 equates to holding ones finger over
    the tip of a flame of a cigarette lighter for 1
    sec.
  • 1.2 cal/ cm2 is considered the threshold for a
    curable burn (second-degree)

36
PPE Protection From Arc-Flash!
37
How to Avoid Arc-Flash Hazards
  • Build control panels within the properly rated
    enclosures
  • Minimize exposure to energized equipment
  • Follow proper lockout/ tag-out procedures
  • Design into control cabinets access options that
    will allow programming, data acquisition and
    system adjustment without having to open the
    panel door
  • Maintain and update equipment and documentation
  • Conduct safety training for all personnel

38
Industrial Control Panel Access Options
  • Properly applied they can reduce arc-flash
    hazards
  • Save time and money - No PPE required
  • Maintains enclosure type ratings
  • Many options available
  • RJ 45, SUB-D9, USB, etc.
  • Eternal shelves
  • Document enclosures
  • Operator panels
  • Viewing windows

39
Updated Industrial Control Panel
40
Industrial Control Panels
41
NEC Article 409 UL508A Industrial Control
Panels
  • Troy Miesse/ IE Business Development
Write a Comment
User Comments (0)
About PowerShow.com