Orange County Communications System Re-banding - PowerPoint PPT Presentation

Loading...

PPT – Orange County Communications System Re-banding PowerPoint presentation | free to download - id: 8356ab-OGZjM



Loading


The Adobe Flash plugin is needed to view this content

Get the plugin now

View by Category
About This Presentation
Title:

Orange County Communications System Re-banding

Description:

Radio System rebanding-Tyco Author: J Vail Last modified by: cpcljn1 Created Date: 12/7/2006 7:46:55 PM Keywords: 2008-09-09 Subject: BCC Meeting Presentation ... – PowerPoint PPT presentation

Number of Views:6
Avg rating:3.0/5.0
Slides: 4
Provided by: JVa82
Category:

less

Write a Comment
User Comments (0)
Transcript and Presenter's Notes

Title: Orange County Communications System Re-banding


1
Orange County Communications System Re-banding
Upgrade
  • Facts -
  • Re-banding cost of 7.1M will be paid by NEXTEL.
  • Orange County needs to re-band the system by Dec,
    2009 in order to comply with FCC mandate. Sept
    15th date is self imposed.
  • Orange County Motorola Legacy SmartNet System is
    obsolete this means that the system will have
    to be upgraded by 2012. No longer supported by
    Motorola
  • All Motorola Legacy SmartNet Systems will be
    obsolete and all other Surrounding communities
    around Orange County will have to upgrade P25
    Technology Open protocol

2
Orange County Communications System Re-banding
Upgrade
  • Facts continue-
  • Interoperability between P25 Systems whether a
    Motorola System or a Tyco Electronics System will
    be achieved exactly the same way.
  • Interoperability amongst a P25 System (Motorola
    or Tyco Electronics) and a Legacy Smartnet System
    will be achieved exactly the same.
  • Staff has acknowledge there are Two Major
    Providers why then does the County need to Sole
    Source a project that could exceed 60M.

3
Orange County Communications System Re-banding
Upgrade
  • Facts continue-
  • TE Experience includes
  • Brevard County Volusia County
  • Indian River County Flagler County
  • Hillsborough County City of Tampa
  • Pasco County Manatee County
  • Collier County Miami Dade County
  • State of Florida Cities Municipalities usinf
    SLERS
  • Bottom Line - Orange County will realize 30 to
    40 savings through an RFP Process.
About PowerShow.com