RPC Technical Trigger Status - PowerPoint PPT Presentation

1 / 2
About This Presentation
Title:

RPC Technical Trigger Status

Description:

RPC Technical Trigger Status Installation of RBC boards on the detector towers: done Cabling of negative wheels: cables ready, need to be installed – PowerPoint PPT presentation

Number of Views:20
Avg rating:3.0/5.0
Slides: 3
Provided by: Lod80
Category:

less

Transcript and Presenter's Notes

Title: RPC Technical Trigger Status


1
RPC Technical Trigger Status
  • Installation of RBC boards on the detector
    towers done
  • Cabling of negative wheels cables ready, need
    to be installed
  • Installation of TTU boards in USC55 1 out of
    3 (can cover up to 2 wheels)
  • The installation will be completed as soon as
    full production of Trigger Boards (Warsaw) will
    be delivered
  • Received from K.P. firmware for TTU Backplane ?
    develop our part of fw to collect 5 wheel-level
    trigger and produce 1 Technical Trigger signal
  • ?
  • Complete the chain

2
Test to validate the implemented algorithm
  • At sector level done last week with diagnostic
    Readout (from TB)
  • Tower level tomorrow we try to use minidaq and
    TTU on W1 (sect. 2-3-10-11) Unfortunately not
    full tower
  • Wheel level (when ?)
  • Study the timing calibration for cosmic muons
  • xcheck with DT trigger
  • coupling with Global Trigger
  • Provide Trigger for May Global Run and CMS
    startup, as requested by Joao and Wesley ?
    Mission Impossible ???

Develop TTU Emulator (who?)
Analyze Tracker Alignment wishes
Write a Comment
User Comments (0)
About PowerShow.com