1. Electrical Duct Bank. 2. Hwy 93 Sanitary Sewer. 3. Campus Beach. 4. Kingsmore Stadium. 5. Little John Renovation. 6. West Campus Energy Plant. 7. West Campus ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 16
Provided by: clemsonEdu
Learn more at: http://media.clemson.edu
Category:

less

Write a Comment
User Comments (0)
Transcript and Presenter's Notes

Title: 2014 Campus Construction


1
2014 Campus Construction
2015 Campus Construction Projects Summer Impacts
May 1, 2015
2
Table of Contents
  • Overview Map of Projects
  • Project Details By Campus Quadrant
  • Electrical Infrastructure Project Impacts
  • Parking Transportation Update
  • Miscellaneous Disruptions

3
NW
NE
7
1
1
11
10
3
12
14
6
15
5
19
2
13
8
9
4
17
18
20
24
23
21
16
28
27
22
25
26
1
1
29
SW
SE
N
Construction Projects
  • 8. WEZ Ph III / Suites Renovation
  • 9. Memorial Stadium Suites
  • 10. Printer Site Demolition
  • 11. Advanced Technology Center
  • 12. Centennial Blvd Storm Drain
  • 13. Core Campus
  • 14. Riggs Soccer Field
  • 15. Douthit Hills
  • 1. Electrical Duct Bank
  • 2. Hwy 93 Sanitary Sewer
  • 3. Campus Beach
  • 4. Kingsmore Stadium
  • 5. Little John Renovation
  • 6. West Campus Energy Plant
  • 7. West Campus Satellite Parking
  • 23. Freeman Hall Expansion
  • 24. Byrnes Brick Repair
  • 25. Lightsey Bridge Renovations
  • 26. Brooks Center Roof
  • 27. Flour Daniel Roof
  • 28. Hendrix Center Patio
  • 29. Waste Water Treatment
  • 16. Cherry/McMillian Signal
  • 17. Parkway Drive Paving
  • 18. Hardin/Brackett ADA Sidewalk
  • 19. East Campus Satellite Parking Lot
  • 20. Central Energy Facility Boilers
  • 21. Cooper Library North Pavers
  • 22. Watt Innovation Center

4
Northwest Campus
3
McFadden
7
Jervey
12
10,11
6
5
2
4
8,9
  • Construction Projects
  • 7. West Campus Satellite Parking
  • 8. WEZ Ph III
  • 9. Memorial Stadium Suites
  • 10. Printer Site Demolition
  • 11. Advanced Technology Center
  • 12. Centennial Blvd Storm Drain
  • 2. Hwy 93 Sanitary Sewer
  • 3. Campus Beach
  • 4. Kingsmore Stadium
  • 5. Little John Renovation
  • 6. West Campus Energy Plant

NW
N
  • Projects Starting after Summer 15

5
Northeast Campus
15
1
14
1
20
19
13
16
18
  • Construction Projects
  • 18. Hardin/Brackett ADA Sidewalk
  • 19. East Campus Satellite Parking Lot
  • 20. Central Energy Facility Boilers
  • 1. Electrical Duct Banks
  • 13. Core Campus
  • 14. Riggs Soccer Field
  • 15. Douthit Hills
  • 16. Parkway Drive Paving

NE
N
  • Projects Starting after Summer 15

6
Southeast Campus
24
21
1
25
23
22
28
27
16
1
26
Construction Projects
  • 21. Cooper Library North Pavers
  • 22. Watt Innovation Center
  • 23. Freeman Hall Expansion
  • 24. Byrnes Brick Repair
  • 25. Lightsey Bridge Renovations
  • 26. Brooks Center Roof
  • 27. Flour Daniel Roof
  • 28. Hendrix Center Patio
  • 1. Electrical Duct Banks
  • 16. Cherry/McMillian Signal

SE
N
  • Projects Starting after Summer 15

7
Southwest Campus
29
Construction Projects
  • 29. Waste Water Treatment Upgrades

SW
N
  • Projects Starting after Summer 15

8
Electrical Infrastructure Projects
Scope of Work Replace electrical infrastructure
that has reached the end of its useful life.
  • Many short (hours) and long (days) power outages
    will be required.
  • Periodic Parking Roadway Disruptions will also
    be encountered.
  • 1. Electrical Duct Bank

9
Electrical Duct Bank
  • 1. Electrical Duct Bank

10
Electrical Duct Bank InstallationsCentral Campus
N
E
Schedule A. Early Summer B. Early Summer C.
Mid Summer D. Late Summer E. Summer/Fall/Availab
le Opportunity
C
D
B
A
11
Electrical Outages
  • All campus buildings will be affected briefly by
    power outages.
  • A tentative schedule for outages is included here
    although these are subject to change.

12
Tentative Electrical Outages
  • Early Summer Outages still to be determined
    Earle Hall, Fluor Daniel, Harris A. Smith, STI,
    Athletics Facilities in the Bottoms
  • Possible outages late in the summer Shoeboxes,
    Stadium Suites
  • 5/8 5/10 Freeman Hall
  • 5/16 5/17 Sikes and Alumni Center
  • 5/30 5/31 McAdams North, Daniel Hall, East
    Campus Chiller Facility
  • 6/13 6/14 PA Part 1
  • 6/20 6/21 PA Part 2
  • 7/3 7/6 Cooper Library
  • 7/18 7/19 Barre Hall, McAdams South, Lehotsky
    Hall, Jervey/McFadden
  • 8/1 8/2 Lee II, Lowry
  • 8/8 8/9 Sirrine, Riggs, Rhodes
  • 8/28 8/30 Brackett
  • 9/19 9/20 Hardin, Olin, Trustee House, Fernow
    (Fernow Possibly Summer)

13
Parking Transportation Update
  • 45 additional employee spaces are being
    designated on Daniel Dr. on May 4, 2015
  • East West Employee Shuttles will cease
    operation Monday, May 4 until further notice
  • 2 ADA spaces will be closed May 11 Aug. 16 in
    E-15 (East Library) parking lot

14
Parking Transportation Update
  • ROAD CLOSURES
  • Avenue of Champions, between Centennial Blvd
    Perimeter Rd, will be closed to all traffic and
    parking May 11 Aug 19, 2015
  • Parkway Drive will be closed to all traffic and
    parking May 11 June 1, 2015
  • Any single day road or parking lot closures will
    be announced on Parking and Transportations
    website clemson.edu/parking

15
Miscellaneous Disruptions
  • Campus Steam Outage May 17th to May 21st
  • Long Hall/Campbell Museum Concrete Walks
  • Miscellaneous Summer Road Crosswalk Restriping
  • Landscape Improvements Projects
  • Parking Lot Islands C-07, C-09, E-05
  • Window Seal/Caulk
  • Earl Hall (June August)
  • Strode Tower (June September)
  • PA Building (July January 16)
  • Other Planned Small Roof Projects
  • Jordan Greenhouse
  • Rhodes Hall (late summer)
  • Student Union Repair
  • Tillman Flat Roof
  • Hunter Hall Auditorium (late summer)
About PowerShow.com