Abandoned%20Equipment%20Information%20Exchanged - PowerPoint PPT Presentation

About This Presentation
Title:

Abandoned%20Equipment%20Information%20Exchanged

Description:

Abandoned Equipment Information Exchanged Presented By: Robert Beard Sonja Waters Breakout Session #2 Abandoned Equipment Information Exchanged Two Basic Categories ... – PowerPoint PPT presentation

Number of Views:56
Avg rating:3.0/5.0
Slides: 14
Provided by: Licen168
Learn more at: http://www.cmbg.org
Category:

less

Transcript and Presenter's Notes

Title: Abandoned%20Equipment%20Information%20Exchanged


1
Abandoned Equipment Information Exchanged
  • Presented By
  • Robert Beard
  • Sonja Waters
  • Breakout Session 2

2
Abandoned Equipment Information Exchanged
  • Two Basic Categories of Abandoned Equipment
  • Abandoned - Equipment that is physically isolated
    from active energy sources (Electrically and/or
    mechanically)
  • Inactive - Equipment that is identified as
    inactive. It is still physically connected to
    active energy sources

3
Equipment Status Control Discussion Identified
The Above Categories Are Controlled Differently
  • Abandoned Equipment
  • Physically isolated (electrically and/or
    mechanically
  • Documented on Design Drawings as being abandoned
    and isolated

4
Abandoned Equipment (Continued)
  • Procedures identify equipment status requirements
  • Equipment labeled in field as abandoned

5
  • Information Contact
  • Robert Beard - Configuration Supervisor
  • PSEG Nuclear
  • 856.339.7800
  • Robert.Beard_at_PSEG.com

6
Inactive Equipment
  • Identified on controlled lists as being inactive
  • Monthly PI of how many SSCs are identified as
    inactive

7
Inactive Equipment (Continued)
  • Lists are reviewed periodically
  • Annually (Duke) assessed for impact
  • Bi-Annually (APS) for prioritizing into the mod
    process for abandoning
  • Equipment physically connected to active energy
    sources

8
Inactive Equipment (Continued)
  • Equipment labeled in plant as inactive (Duke)
  • Equipment identified in equipment database as
    inactive (Duke)
  • Design drawings still show equipment as being
    actively installed

9
  • Contacts
  • Sonja Waters - Sect Leader Config/Mods
  • Arizona Public Service
  • 623.393.6933
  • Swaters_at_APSC.com
  • Geary Armentrout - Senior Engineer
  • Duke Energy
  • 864.885.4322
  • glarment_at_DUKE-ENERGY.com

10
General Discussion Items
  • Budget
  • Funding required to develop mod packages to
    abandon equipment
  • Process should identify cost of removal as part
    of total mod cost

11
General Discussion Items (Continued)
  • PM Program Impact
  • Equipment maintenance requirements if abandoned
  • Existing PMS need to be addressed

12
General Discussion Items (Continued)
  • Operation Surveillance Impact
  • Current surveillance test requirements need to be
    addressed
  • Are different surveillance requirements needed

13
General Discussion Items (Continued)
  • Environmental/Safety Hazards
  • Equipment contents disposal requirements
  • Personnel safety impacts need to be addressed