North Hudson Sewerage Authority Storm Water Management Improvement Project: H5 Wet Weather Pump Station

Description:

Presentation to Maxwell Place Homeowners Association * – PowerPoint PPT presentation

Number of Views:96
Avg rating:3.0/5.0
Slides: 20
Provided by: Wilso182
Category:

less

Transcript and Presenter's Notes

Title: North Hudson Sewerage Authority Storm Water Management Improvement Project: H5 Wet Weather Pump Station


1
North Hudson Sewerage Authority Storm Water
Management Improvement ProjectH5 Wet Weather
Pump Station
  • Presentation to Maxwell Place Homeowners
    Association

2
Agenda
  • Project Overview
  • Site Plan
  • Construction Process
  • Preliminary Schedule
  • Construction Activities
  • Maxwell Place Engineered Cap
  • Role of LSRP During Construction
  • Traffic Management
  • Access at the Site
  • Effect on Businesses
  • Noise Management
  • Communications with Residents
  • Restoration of the Site
  • Questions

3
Project Site Plan
H5 We Weather Pump Station Control Vault
4
Construction Preliminary Schedule
5
Pre-Construction Activities
  • June 2015 August 15, 2015
  • Pre-Construction Survey
  • Soil Sampling
  • Utility Locations

6
First Phase of Construction
  • August 15, 2015 December 30, 2015
  • Emergency Generator
  • Remove existing generator and provide temporary
    generator
  • Pour Generator Pad
  • Install Emergency Generator
  • Control Vault
  • Excavation and Sheeting
  • Pour Concrete Foundation, Walls, and Top Slab
  • Install equipment in vault
  • Pump Station
  • Excavation and Sheeting
  • Pour Concrete Foundation, Walls, and Top Slab

7
Maxwell Place Engineered Cap
  • The current cap is represented in the Figure
    below
  • The cap or engineered controls has always been
    a semi-permeable layer and is not a vapor
    barrier.
  • There is no active vapor management system only
    engineered controlled fill and semi-permeable
    materials over the site. (e.g. concrete, asphalt
    and pavers).

8
Construction LSRP During Construction
  • LSRP During Construction Provide Notification to
    NJDEP
  • HOA as Property Owner
  • Workers
  • LSRP During Construction Coordinate the
    Engineered Controls Monitoring
  • Air Monitoring
  • Soils Monitoring
  • Maintain Records During Disruption of Engineered
    Cap
  • Contractor to Prepare Record Drawings of New
    Structures and Replacement of Engineered Controls
  • LSRP of Record Document Disruption to Remedial
    Action Permit at Next Bi-annual Certification
  • LSRP During Construction to Coordinate with LSRP
    of Record

9
Construction LSRP Plan During Construction
  • Baseline
  • LSRP will perform baseline data collection, along
    11th Street, for dust and VOC before any
    intrusive activities begins.
  • Monitoring
  • The site will be monitored during excavation at
    the site until a time that it is no longer
    necessary.
  • Based on the review of the chemicals listed in
    the Deed Notice the LSRP has established Trigger
    Levels for proposed intrusive activities where a
    notification would be provided to the Authority
    which is well below a contaminant
  • LSRP Plan
  • Project Specific LSRP Plan will be available
    prior to construction activities.

10
Construction Process Access
  • Traffic
  • Plan has been developed and will be submitted to
    the City during Pre-Construction Phase
  • Goal is to provide as much maintenance access as
    possible
  • Plan has incorporated feedback from HOA Board
  • Uninterrupted Access to Parking Garage
  • East-Bound Traffic Lanes (Between Sinatra Drive
    North and Hudson Street) Open at All Times
  • West-Bound Traffic Lanes Temporary Closures
  • Limited Truck Traffic
  • Concentrated During Excavation and Concrete
    Placement
  • No Need for Constant Trucks In and Out of Site

11
Construction Process Access
  • Access at the Site
  • Limited Truck Traffic
  • Concentrated During Excavation and Concrete
    Placement
  • No Need for Constant Trucks In and Out of Site
  • Sidewalks
  • South Sidewalk Open at All Times
  • South Sidewalk Maintain Drop-Offs for School
  • North Sidewalk Brief Intervals of Closure
    Between Sinatra Drive North and Hudson Street
  • Parking
  • No Street Parking During Construction Hours
  • Limited Parking During Non-Construction Hours
    on Weekends

12
Construction Process Businesses
  • Effect on Local Businesses
  • Sidewalk Access Permits Unimpeded Foot Traffic to
    Local Businesses
  • Traffic Controls at Site Should Not Impact
    Businesses
  • Drop-off Point Will Be Maintained During
    Construction
  • Parking Access May Have Limited Effect
  • Parking Garage Access Remains In Place
  • Restrictions on Street Parking May Have Limited
    Impact

13
Construction Process Noise Management
  • Noise Reduction
  • Hours of Construction Limited to Reduce Community
    Disruption
  • Monday through Friday Only
  • Between Hours of 8 am to 5 pm
  • No Weekend or Off-Hour Construction Activity
  • No Pile Driving East of Hudson Street
  • Substantially Less Noise without Need for Piles

14
Construction Cooling Condensers
  • The Cooling Condensers Only Operate to Cool the
    Controls When the Pumps Run
  • The Condensers Have a Sound Rating of 46 55 dB
    at the units, similar to a Refrigerator at 50 dB.

15
Construction Process Communications
  • Keeping Residents Informed
  • Monthly Progress Report Posted on North Hudson
    Sewerage Authority Website http//www.nhudsonsa.co
    m/
  • Onsite Construction Field Office
  • Executive Director and Authority Engineer
    Available for Update Meetings
  • 24/7 Community Outreach Hotline on Website
  • (866)-689-3970

16
Restoration of Site
  • Street
  • Complete repaving of 11th Street
  • Both Sides Between Sinatra Drive North Hudson
    Street
  • Restoration of Island Landscaping
  • Blend Covers into Landscape Plan

17
Questions?
North Hudson Sewerage Authority1600 Adams
Street Hoboken, NJ 07030 Phone
(201)-963-6043 http//www.nhudsonsa.com/
18
Schedule - Notes
  • Note 1 Air Monitoring Continues Through
    Excavation and until temporary restoration is
    completed
  • Note 2 Soil Monitoring Continues Through
    Excavation and until temporary restoration over
    soils
  • Award of Contract June 2015
  • Notice to Proceed Issued on July 1, 2015
  • Construction Contract Duration is 490 days (400
    days to Substantial Completion and additional 90
    days to Final
  • Minimal Site Activity First 90 Days of
    Construction Contract Period for Shop Drawing
    review and approval
  • Site Mobilized August 2015
  • Heavy Construction Complete August 2016
  • Final Completion October 2016

19
Timeline Descriptions
  • 1A - Award of Contract
  • 1B - LSRP Plan Approval
  • 1C -Shop Drawing Review (Assumed 90 Days)
    Concurrent with Task 1,2 3.
  • 1D - Pre-Construction Survey (Photographic record
    of project area, i.e. buildings, sidewalks,
    roads, etc.)
  • 2 - In-Situ Soil Sampling and Utility locates
  • 3 - Temp Relocate Ex. Generator and Construct
    Generator Pad
  • 4A - Air Monitoring ( Note 1 Continues Through
    Excavation and until temporary restoration is
    completed)
  • 4B - LSRP Site Monitoring (Note 2 Soil
    Monitoring Continues Through Excavation and until
    temporary restoration over soils )
  • 5A - Sheeting and Excavation of Control Vault
    Sub-Project
  • 5B - Control Vault Construction
  • 6A - Sheeting and Excavation of Pump Station
    Sub-Project
  • 6B - Pump Station Construction
  • 7 - Relining outfall
  • 8 - Start-up and Testing
  • 9 - Final Restoration