Case Study 4: CERCLA INTERIM ACTION AT THE SRS PAR POND - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

Case Study 4: CERCLA INTERIM ACTION AT THE SRS PAR POND

Description:

Title: Case Study 4: CERCLA Interim Action at the SRS Par Pond Subject: DOE Workshop Training Materials Author: EH-43 Keywords: Environmental Laws & Regulations ... – PowerPoint PPT presentation

Number of Views:68
Avg rating:3.0/5.0
Slides: 11
Provided by: EH48
Category:

less

Transcript and Presenter's Notes

Title: Case Study 4: CERCLA INTERIM ACTION AT THE SRS PAR POND


1
Case Study 4CERCLA INTERIM ACTION AT THE SRS
PAR POND
2
CERCLA Interim Action at Par Pond
  • CERCLA Interim Action at Par Pond provides
  • An analysis of interim action options at the
    Savannah River Site (SRS)
  • A description of the data gathering process
  • An example of how to address CERCLA requirements

3
The Par Pond
  • The cooling water reservoir for two nuclear
    reactors at the SRS was contaminated with low
    levels of radioactive isotopes and other
    hazardous substances.

4
The Par Pond
  • The water level for the Par Pond was lowered by
    19 feet due to concerns over the structural
    integrity of the earthen dam containing the
    reservoir.

5
The Par Pond
6
The Par Pond
  • Lowering the water level
  • Exposed over 1,300 acres of contaminated
    sediments
  • Triggered the need for a CERCLA interim remedial
    action

7
The Par Pond
  • Risk assessments were conducted to evaluate
  • Potential ecological hazards, or
  • Human health hazards from the exposed
    contaminated sediments

8
The Par Pond
  • A feasibility study (FS) was initiated to develop
    and evaluate possible remediation alternatives.

9
The Par Pond
  • Alternatives outlined in the FS focused on
  • Containment options
  • Remedial approaches that would mitigate
    potential hazards from the exposed sediments

10
The Par Pond
  • This example illustrates the overall objective of
    the RI/FS process, which is to support an
    informed risk management decision concerning the
    most appropriate remediation option for a given
    site.