APPA 2004 ENGINEERING - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

APPA 2004 ENGINEERING

Description:

... Equipment History CASCADE Server Automatic Data Synchronization Work Procedure Maintenance Order ... and planning Patrol and Maintenance ... – PowerPoint PPT presentation

Number of Views:58
Avg rating:3.0/5.0
Slides: 21
Provided by: cmsp151
Category:

less

Transcript and Presenter's Notes

Title: APPA 2004 ENGINEERING


1
APPA 2004
ENGINEERING OPERATIONS TECHNICAL
CONFERENCE March 8, 2004
Adams Mark Hotel San Antonio, Texas
SUBSTATION MAINTENANCE
CASCADE Software for Utility Maintenance John
Cummins Lafayette Utilities System
2
CASCADE Software for Utility Maintenance
  • John Cummins
  • Lafayette Utilities System

3
Maintenance Management Inspection
SystemDeveloped specifically for electric
utilitiesSelected by over 60 utilities across
the U.S.Lafayette Utilities is a Municipal
Utility providing Electric, Water, and Wastewater
Services to the City of Lafayette, Louisiana.
Lafayette Utilities System chose Cascade Software
for Substation Maintenance, and incorporated
Commercial Electric Meter Maintenance into the
database.
4
System Overview
CASCADE Server
CASCADE Workstations

Readings
Maintenance Order Reports
Inspections Testing Forms
Work Procedure
Automatic Data Synchronization
Maintenance Orders
CASCADE Field Units (Optional)
Synchronize the data directly to CASCADE
FieldUnits
Maintenance Orders
Inspections Testing
Equipment History
5
Functional Overview
  • Equipment Database
  • Nameplate data, OM history
  • Maintenance Procedures and Triggers
  • Multiple Triggers and Boolean Logic
  • Maintenance forecasting and planning
  • Patrol and Maintenance Inspections
  • Calculated inspection readings
  • Inspection validation


6
Core System Components
7
Asset Database
  • User Defined Structure
  • Location Hierarchy
  • Equipment Types
  • Equipment Nameplate
  • Point Click Navigation
  • Saved Queries Sorts
  • Comments Attachments

Triggers
Procedures
8
Maintenance Procedures
  • Standardized Practices
  • As-found/As-left Maintenance Inspections
  • Parts Tools
  • Standard Hours

9
Maintenance Triggers
  • Multiple Trigger Types
  • Periodicity, Readings, Date, Event
  • Boolean Logic
  • Priority Calculation
  • Five user-controlled variables to determine
    importance of work
  • Alerts or Work Orders

10
Operations Benefits
  • Consolidate your asset data
  • Improve collection and use of data
  • Assess equipment health and risk
  • Develop consistent maintenance practices
  • Prioritize OM dollars and resources
  • Produce accurate maintenance forecasts
  • Enable field personnel with valuable data

11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
(No Transcript)
19
Triggers for Maintenance Orders
  • Lafayette Utilities uses triggers to generate
    Maintenance Orders. In the case of Electric
    Meter Maintenance, the Commercial Meters are
    triggered for calibration after a time interval.
    This way, a percentage of meters is being
    calibrated every month. If a meter is reported
    by a customer and routinely recalibrated, the
    trigger is adjusted so that meters next
    calibration will be triggered in the allotted
    time interval.

20
Questions and answers
  • Introduction of Mr. John Lane
  • Sales Manager
  • Digital Inspections, a KEMA Company
Write a Comment
User Comments (0)
About PowerShow.com