Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY 2010-11 on 17.02.2010 - PowerPoint PPT Presentation

Loading...

PPT – Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY 2010-11 on 17.02.2010 PowerPoint presentation | free to download - id: 75de41-ZTMzY



Loading


The Adobe Flash plugin is needed to view this content

Get the plugin now

View by Category
About This Presentation
Title:

Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY 2010-11 on 17.02.2010

Description:

Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY 2010-11 on 17.02.2010 – PowerPoint PPT presentation

Number of Views:7
Avg rating:3.0/5.0
Slides: 7
Provided by: OER8
Learn more at: http://www.orierc.org
Category:

less

Write a Comment
User Comments (0)
Transcript and Presenter's Notes

Title: Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY 2010-11 on 17.02.2010


1
Queries raised by Director (Tariff) on ARR and
Tariff Application ofCESU for FY 2010-11
on17.02.2010
2
  • CESU may submit information whether the following
    consumers have been provided with static meters
    to measure power factor directly.

LT category LT category
1. LT Industrial (M) Supply
2. Public Water Works and Sewerage pumping gt22 KVA
HT Category HT Category
3. Specified Public Purpose
4. General Purpose lt110 KVA
5. HT Industrial (M) Supply
3
  • CESU has proposed demand charges to be levied on
    Small and Medium Industries availing power supply
    at LT with CD gt10 KW. In this connection we would
    like to know whether these consumers are having
    static meters to record demand in KVA.
  • CESU has proposed Demand charges for supply of
    power to CGPs beyond 72 hours of supply. CESU may
    submit the basis of fixing 72 hours as cut off
    hour after which demand charge can be imposed.
  • CESU is required to submit each individual bill
    of HT and EHT consumers for FY 2009-10 (i.e. upto
    December, 2009) with necessary computations of
    average rates thereof to enable the Commission to
    verify the same with the average rates per unit
    as approved in the Tariff Order 2009-10.
  • CESU should submit a plan for further reduction
    of cross-subsidy payable by the HT and EHT
    consumers.

4
  • CESU should submit T-6 Format (Upto Dec, 09).
  • It is observed from SLDC online data from 15th
    January, 2010 to 7th February, 2010 that CESU has
    not adhered to the protocol issued by the
    Commission on Power Regulation dtd. 14.01.2010
    and violated the implementable day ahead schedule
    of SLDC as a result of which the licensee has
    overdrawn during these days except on 31st Jan.,
    4th, 6th and 7th Feb., 2010 totaling to 23.62 MU
    more than its entitlement. This has an UI impact
    of Rs. 9.73 cr. CESU may explain reasons of such
    over-drawal and non-adherence to Commissions
    protocol on Power Regulation.
  • As per a tentative estimate, if Bachat Lamp
    Yojana of BEE is adopted in mission mode
    throughout CESU, then annual saving of energy
    would be about 803 MU resulting in less drawal of
    155 MW in evening peak hours from the State Grid.
    CESU may intimate the status of implementation of
    Bachat Lamp Yojana at this acute shortage of
    power under which State is passing through.

5
  • The salaries, wages, allowances reflected in
    Schedule-15 of the audited accounts for 2007-08
    show a quantum jump from Rs.99.45 cr. during
    2006-07 to Rs.174.24 cr. during 2007-08. CESU is,
    therefore, required to explain the reasons for
    such quantum jump by bifurcating the different
    components attributable to such increase.
  • The audited data for employees (excluding
    contractual and outsource employee) cost for
    2006-07 and 2007-08 excluding pay revision
    impact, if any, may be furnished in Form F-21.
  • The huge projection in addition of regular
    employees from 5235 nos. as on 31.03.2010 to
    11091 as on 31.03.2011 may be explained.
  • The licensee is required to submit interest
    earning from consumer security deposit for the
    financial year 2007-08, 2008-09 2009-10 by way
    of investment in various instruments. Further the
    licensee is required to furnish the income from
    other sources like supervision charges etc. for
    the above period.
  • Utilisation of AG expenses over and above the
    normal rise allowed by the Commission for 2008-09
    and 2009-10 may be furnished.

6
THANK YOU
About PowerShow.com