Projects - PowerPoint PPT Presentation

About This Presentation
Title:

Projects

Description:

Systems for Projects Airplane Must host surveillance equipment ... Used by all military services. ... Mercury mapper. Both IR and radar. – PowerPoint PPT presentation

Number of Views:43
Avg rating:3.0/5.0
Slides: 10
Provided by: Dave1224
Category:

less

Transcript and Presenter's Notes

Title: Projects


1
Projects
  • Each study group will develop a system.
  • System to be selected by the group from list
    (next slide) or approved by Bell.
  • Im your customer.
  • You will define all the steps and documents.
  • Define and selectively develop program schedule,
    system, documents.
  • Emphasis is on all integration aspects and
    appropriate testing along the way to customer
    acceptance.
  • Each group will develop a SEMP, a TEMP and an A
    spec.
  • Each group will make a presentation (1 hour).
  • Every member presents
  • Each presentation is a portion of a major design
    or test review.

2
Systems for Projects
  • Select one or suggest one to Bell for approval
  • Automobile
  • Airplane
  • Distributed computing
  • Train
  • Spacecraft
  • Health monitoring

3
Systems for Projects
  • Automobile
  • Seats 5 -220 lb, 65 adults.
  • 0-60 mph in 6 sec.
  • Accelerates as quickly as it stops.
  • Has auto-steer and auto-trip capability
  • New capability that uses GPS and obstruction
    sensing to navigate safely from place to place.
  • 2 years to IOC.

4
Systems for Projects
  • Airplane
  • Must host surveillance equipment (provided by
    another vendor).
  • Accommodates aircrew and 5 sensor operators.
  • Delivered with operator USI subsystems installed.
  • Must fly from unimproved airfields.
  • Used by all military services.
  • All weather flying capability.
  • 4 years to IOC, if modified.
  • 6 years to IOC, if new aircraft.

5
Systems for Projects
  • Distributed computing
  • World -wide interconnected users.
  • Business data processing.
  • Scientific data analysis.
  • Includes all communication, computing and data
    storage.
  • 2 years to IOC.

6
Systems for Projects
  • Passenger train
  • Magnetically levitated.
  • 220 mph normal cruise.
  • Less than 80dB noise at 15 feet from train.
  • May use modified version of existing cars for
    passengers.
  • Include first 100 miles of track from DFW to
    Waco.
  • 3 years to IOC.

7
Systems for Projects
  • Spacecraft
  • Mercury mapper.
  • Both IR and radar.
  • Directed subcontractors for the sensors.
  • 3 year on-station life.
  • Uses existing ground stations.
  • 3 years to launch from shuttle in orbit.

8
Systems for Projects
  • Health monitoring
  • Used to monitor ambulatory patients from their
    homes.
  • Realtime notification of physicians of out of
    tolerance parameters (50).
  • Directed subcontractors for the sensors.
  • 5 years between mandatory service.
  • Automatic instructions to patient i.e. not just
    an alarm.
  • 2 years to competitors roll-out.

9
Instructions
  • Develop mini(10 pages each) A Spec with
    section 4, SEMP, and a Master Test Plan.
  • Define subsystems and their performance
    requirements.
  • Include engineering organization with roles and
    responsibilities.
  • Use IPTs.
  • Summarize written documents for a Powerpoint
    classroom presentation of which everyone presents
    an approximately equal portion.
  • For the remaining information you need to know to
    do your project... ask Bell.
  • If no answer in two days, make and document your
    assumptions then continue.
Write a Comment
User Comments (0)
About PowerShow.com