Agenda Item 2.2: Post-Implementation Analysis of Data Link Performance Following Release 15 (R15) Ground Earth Station Software Upgrade - PowerPoint PPT Presentation

About This Presentation
Title:

Agenda Item 2.2: Post-Implementation Analysis of Data Link Performance Following Release 15 (R15) Ground Earth Station Software Upgrade

Description:

Agenda Item 2.2: Post-Implementation Analysis of Data Link Performance Following Release 15 (R15) Ground Earth Station Software Upgrade SOCM/2 IP/nn – PowerPoint PPT presentation

Number of Views:54
Avg rating:3.0/5.0
Slides: 29
Provided by: Christin645
Category:

less

Transcript and Presenter's Notes

Title: Agenda Item 2.2: Post-Implementation Analysis of Data Link Performance Following Release 15 (R15) Ground Earth Station Software Upgrade


1
Agenda Item 2.2Post-Implementation Analysis of
Data Link Performance FollowingRelease 15 (R15)
Ground Earth Station Software Upgrade
  • SOCM/2 IP/nn
  • Attachment A
  • Bangkok, Thailand
  • 8-10 February 2012

2
Contents
  • Summary of Release 15 GES Upgrade
  • Data Link Performance Analysis of CPDLC and ADS-C
    Technical Performance by GES
  • Before 2 months prior to month in which upgrade
    occurred
  • After 2 months after month in which upgrade
    occurred
  • Most recent November/December 2011

3
Summary of Release 15 GES Upgrade
  • Release 15 (R15) Most recent system software
    upgrade for ground earth stations interfacing
    with Inmarsat Classic Aero I-3 satellites
  • Purpose of upgrade
  • To improve GES data link delivery capability and
    aircraft log-on management subsystems
  • To enhance GES traffic handling and monitoring
    subsystems

GES Identifier and Location Associated DSP Date of R15 Upgrade
XXE Eik, Norway ARINC 31 January 2010
XXC Santa Paula, California, USA ARINC 16 February 2010
AOW2 Aussaguel, France SITA 31 May 2010
POR1 Perth, Australia SITA 6 July 2010
4
Data Link Performance Comparison forEik GES (XXE)
5
(No Transcript)
6
(No Transcript)
7
(No Transcript)
8
(No Transcript)
9
Summary of Observed Performance Following R15
Upgrade
  • Eik GES
  • Improvement in the ACTP was not observed
    immediately following the R15 upgrade, but the
    most recent data does show a noticeable
    improvement in performance for CPDLC transactions
  • ADS-C downlink latency performance is observed to
    have degraded in the period immediately following
    the upgrade as well as in the most recent period

10
Data Link Performance Comparison forSanta Paula
GES (XXC)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
Summary of Observed Performance Following R15
Upgrade
  • Santa Paula GES
  • Improvement can be observed for both the ACTP for
    CPDLC transactions and ADS-C downlink latency
    performance for ADS-C downlink messages
  • Improvement shown to be stable between the period
    immediately following the upgrade and the most
    recent period of observation for both performance
    measures

16
Data Link Performance Comparison forAussaguel
GES (AOW2)
17
(No Transcript)
18
(No Transcript)
19
(No Transcript)
20
(No Transcript)
21
Summary of Observed Performance Following R15
Upgrade
  • Aussaguel GES
  • Improvement can be observed for both the ACTP for
    CPDLC transactions and ADS-C downlink latency
    performance for ADS-C downlink messages
  • Continued improvement shown between the period
    immediately following the upgrade and the most
    recent period of observation for both performance
    measures

22
Data Link Performance Comparison forPerth GES
(POR1)
23
(No Transcript)
24
(No Transcript)
25
(No Transcript)
26
(No Transcript)
27
Summary of Observed Performance Following R15
Upgrade
  • Perth GES
  • Slight improvement can be observed for both the
    ACTP for CPDLC transactions and ADS-C downlink
    latency performance for ADS-C downlink messages
  • Continued improvement shown between the period
    immediately following the upgrade and the most
    recent period of observation for ACTP
  • Improvement shown to be stable between the period
    immediately following the upgrade and the most
    recent period of observation for the ADS-C
    downlink latency performance

28
Conclusions
  • Overall improvement in data link performance at
    GES level following R15 upgrade
  • Improvement most noticeable at the Santa Paula
    and Aussaguel GES
  • In general - upgrade appears to have had more of
    an impact on the ACTP than on the ADS-C downlink
    latency performance
Write a Comment