About This Presentation
Title:

Overview of the PBN Airspace Implementation Processes

Description:

Title: Concordia Subject: Air Transport Bureau Author: icao Last modified by: Walter White Created Date: 11/4/2010 2:12:07 PM Document presentation format – PowerPoint PPT presentation

Number of Views:136
Avg rating:3.0/5.0
Slides: 26
Provided by: ICAO7
Category:

less

Write a Comment
User Comments (0)
Transcript and Presenter's Notes

Title: Overview of the PBN Airspace Implementation Processes


1
Overview of the PBN Airspace Implementation
Processes
BEIJING, CHINA 30 JUN-11 JUL 2014
2
General Information
  • SSID Public_at_ICAOBeijing
  • PWD Welcome2icao

3
Schedule Overview
4
Schedule Overview
5
Overview
  • Learning Objective
  • Understand the Processes involved in the
    planning, design, validation and implementation
    of a PBN Airspace Concept
  • This presentation will discuss
  • The activities that lead up to the implementation
    of a PBN Airspace Concept.

6
ICAO PBN Manual Doc 9613
  • Volume I
  • Airspace Concept
  • Implementation Processes
  • Volume II
  • Navigation Specifications

7
ICAO Manuals
Airspace Design is documented in ICAO Manual
Doc 9992 Manual on The Use of
Performance-Based Navigation (PBN) in Airspace
Design
8
ICAO Manuals
CCO and CDO are documented in ICAO Manuals
Doc 9931 - Continuous Descent Operations Manual
Doc 9993 Continuous Climb Operations Manual
9
PBN Implementation Processes
  • High-level sequential outline of processes to use
    when considering PBN implementation

10
PBN Implementation Processes
11
PBN Enables the Airspace Concept
Airspace Concept
COM
NAV
ATM
SUR
PBN
12
Navigation Specification by Flight Phase
OCEANIC / Enroute Remote (nonSUR) RNAV 10, RNP 4,
RNP 2, Advanced RNP 2
RNAV 1/2 RNP 1 STARs ARNP 1 STARs
RNAV 1/2 RNP 1 SIDs ARNP 1 SIDs
RNP Approach RNP-AR Approach
RNAV 5/2/1 RNP 2 Advanced RNP 2 or 1 Enroute
Continental
13
  • Airspace Concept

14
Overview
  • Learning Objective
  • Understand the Airspace Concept
  • This presentation will discuss
  • What is an Airspace Concept
  • Why develop an Airspace Concept
  • Who develops an Airspace Concept
  • What is needed to develop an Airspace Concept
  • What happens after the Airspace Concept is
    developed.

15
PBN Concept Review
1
NAVIGATION APPLICATION
(Use of NS NI)
3
2
NAVAID INFRASTRUCTURE
NAVIGATION SPECIFICATION
(Ground- Space-based)
(RNAV System Perf.)
X
X
Accuracy value
16
RNAV and RNP
RNP 1
RNAV 1
Alert to Pilot
1 Nautical Mile 95 of flight time
Track Centerline
1 Nautical Mile 95 of flight time
RNP is not different from RNAV it is more than
RNAV
The Key Extra Ingredient On-Board Performance
Monitoring and Alerting
17
PBN Enables Airspace Concepts
Airspace Concept
Airspace Concept
COM
NAV
ATM
SUR
PBN
18
Strategic Goals (Expected Benefits)
Safety?
Capacity?
Efficiency?
Environment?
Access?
Airspace Concept
Airspace Concept
COM
NAV
ATM
SUR
NAVIGATION APPLICATION
PBN
NAVAID INFRASTRUCTURE
NAVIGATION SPECIFICATION
RNAV
RNP
19
What is an Airspace Concept?
  • A master plan of the intended airspace design and
    its operation
  • Describes the intended operations within an
    airspace
  • Developed to satisfy explicit and implicit
    strategic objectives (improved safety, increased
    air traffic capacity, improved efficiency,
    mitigation of environmental impact)
  • A fully developed Airspace Concept
  • Describes in detail the airspace organization and
    its operations
  • Addresses all the strategic objectives identified
    for the project
  • Addresses all CNS/ATM enablers
  • Identifies all operational and technical
    assumptions

20
Why develop an Airspace Concept?
  • Airspace Concept development provides a
    structured and systematic way of determining
  • What is to be achieved in an airspace, and
  • How it will be achieved
  • The development process helps ensure
  • Goals (expected benefits) of planned airspace
    structure are clearly stated
  • Objectives of the airspace change are met and
  • The means to achieve these goals are appropriate
    and feasible within the resources available to
    the airspace system

21
What does it look like?
  • An Airspace Concept can be in any document format
  • Maintain configuration control!

22
What is the most critical point in developing an
Airspace Concept?
  • Setting the appropriate objectives and scope
  • Enables the project team to remain focused and
    the budget to be managed within the set time
  • Most projects which fail to meet the intended
    goal do so because of poorly defined scope and
    objectives.
  • Beware of project creep!

23
Once the Airspace Concept is developed, whats
next?
  • Lay out a detailed program plan for the specific
    implementation(s) in the Airspace Concept
  • ICAO sample action plans (domain-specific and
    comprehensive)
  • Consider just as a starting point
  • Adapt as needed to the specific circumstances of
    a project
  • Steps not always conducted in strict sequence
  • Certain steps may be conducted on a recurring
    basis as the project progresses
  • Steps and the sequence in which they are
    performed in the project should be evaluated by
    the implementation team on the basis of
    experience and judgment

24
Airspace Concept Summary
PBN
25
Questions??