SARVA SHIKSHA ABHIYAN, BIHAR - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

SARVA SHIKSHA ABHIYAN, BIHAR

Description:

SARVA SHIKSHA ABHIYAN, BIHAR In Bihar, we are adhering to the codal provisions of Earth Quake Resistant Building. Prof. P.K. Das, National Consultant, Ed.CIL and Prof ... – PowerPoint PPT presentation

Number of Views:494
Avg rating:3.0/5.0
Slides: 11
Provided by: Sabi81
Category:

less

Transcript and Presenter's Notes

Title: SARVA SHIKSHA ABHIYAN, BIHAR


1
SARVA SHIKSHA ABHIYAN, BIHAR
  • In Bihar, we are adhering to the codal
    provisions of Earth Quake Resistant Building.
    Prof. P.K. Das, National Consultant, Ed.CIL and
    Prof. Yogendra Prasad, H.O.D.,N.I.T., Patna who
    is Doctorate in Structural Design, guided
    structural design of Bihar during DPEP period and
    Prof. Yogendra Prasad is still guiding our
    structural designs.

2
  • We submitted a set of drawings to Dr. A.S.
    Arya, National Seismic Advisor, Ministry of Home
    Affairs, Government of India. He sent his
    detailed comments vide his letter no. nil dt.
    05.12.2006. (Photocopy enclosed).
  • Dr. Arya suggested minor modifications
    consequent upon the revision of I.S. 1893 in
    2002. His suggestions are being implemented and
    buildings are being constructed as per direction
    of Dr. Arya.

3
  • By Lord's grace I was associated as an Executive
    Engineer, Design Quality Control, Ganga Bridge
    at Buxar and as an Executive Engineer in-charge
    of the construction of Ganga Bridge at Patna
    during 1973 to 1980. The experience gained during
    the construction of the prestigious project has
    helped me to contribute my humble lot in the
    construction of earth quake resistant buildings
    under SSA.

4
  • The Civil Works are spread in whole of Bihar.
    Junior Engineers, Assistant Engineers Executive
    Engineers are providing technical assistance in
    construction of civil works. Technical
    Supervisors are also supervising the civil works.
    Our main thrust is on imparting extensive
    intensive training to the VSS/adhoc samiti
    responsible for the construction of civil works.
    S.R.G. members are also providing technical
    assistance in the construction of civil works.

5
  • Paucity of fund is the main constraint which is
    the hindering the progress of the civil works.
    We have impressed upon the MHRD, Govt. of India
    to release the second advance. On the receipt of
    the same we shall able to start all the new civil
    works sanctioned under 2011-12 and complete the
    on going works. We have started the process of
    filling of vacant posts of technical personnel.
  • We have completed 99 of the civil works
    sanctioned up to AWPB 2005-06.

6
  • During AWPB 2006-07 massive sanction of 15,000
    (fifteen thousand) New School Buildings and
    61,000 (sixty one thousand) Additional Class
    Rooms were accorded by the PAB.
  • It tooks nearly one year to organise the
    management structure.
  • So, the major portion of this sanction spilled
    over. During year 2008-09, there was a spurt in
    the inflation rate that hindered the completion
    of the spilled over works.

7
  • We have still 4496 school buildings as deferred
    liabilities. The fund was sanctioned in AWPB
    2011-12 on the old rates.
  • We are getting land slowly but the unit cost of
    the N.S.B. spilled over is hindering the
    completion of the works.
  • We have 21 flood affected districts which also
    contribute a lot in late completion of the works.

8
  • We have stream limed our district management
    structure. Now we have separate District
    Programme Officers
  • for execution of SSA schemes.
  • planning and Accounts
  • Establishment so on coordinated guided by the
    District Education Officer. Formerly we had only
    an officer for SSA works. This re-organisation
    will accelerate the pace of completion.

9

We are constantly monitoring our schemes from
grass root level to state level. We have a
dedicated team. We have completed 77 of all the
sanctioned civil works schemes up to 2010-11 and
are steadily marching towards the completion of
all the sanctioned schemes during 2012-13. ge
gksaxs dkekc ge gksaxs dkekc ge gksaxs dkekc
is always vibrating from us.
10
  • THANKS
Write a Comment
User Comments (0)
About PowerShow.com