2-Step Upgrade of REX - PowerPoint PPT Presentation

About This Presentation
Title:

2-Step Upgrade of REX

Description:

Title: No Slide Title Author: Garoby Last modified by: tsieber Created Date: 5/29/1998 7:41:06 AM Document presentation format: On-screen Show Company – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 7
Provided by: Garoby
Category:
Tags: rex | amplifier | step | upgrade

less

Transcript and Presenter's Notes

Title: 2-Step Upgrade of REX


1
2-Step Upgrade of REX
New Target Beam Lines !
2
Above 4.2 MeV/u Option 2
Modification of existing Systems
3
rf Requirements I
IH Tank No. Frequency (MHz) Length (m) ?eff MW/m Prf (kW) E. Gain (MeV/u) Veff (MV) Amplifier
1 101.28 1.5 235 50 0.9 4.1 IH 1
2 101.28 1.85 190 90 1.1 4.8 7 Gap1
3 202.56 165 160 280 1.9 8.6 Linac3
4 202.56 0.5 100 90 0.45 2.1 IH 9 Gap
5 202.56 0.5 100 90 0.45 2.1 7Gap2, mod.
6 202.56 0.5 100 90 0.45 2.1 7Gap3, mod.
4
ISTC collaboration
  • International Organisation, Nonproliferation
    Program
  • Coordinates the efforts of numerous Governments,
    International Organizations, and Private Sector
    Industries, providing Weapons Scientists from
    former SU States new Opportunities in intern.
    Partnerships. (Provides Funding for these
    Collaborations)
  • Three Linac4 Projects, which include the
    Construction and Machining of complete
    Prototypes, were approved this year by the ISTC
    (1.5 M, Proposals submitted in 2002/2003), one
    with IHEP

ISOLDE wants to submit 2 Proposals in
Collaboration with IHEP Protvino 1. Construction
of the IH Cavities for the Upgrade to 5.5
MeV/u 2. Design and Construction of additional
Cavities up to 10 MeV/u and of the required
rf-Amplifiers - Discussions have started with
IHEP Staff
5
REX beyond 5.5 MeV/u
Proposed by IHEP An RFQ DTL Section driven at
H-mode of RF Oscillations. Transverse Focusing
period 2bl, Pattern FFDD. Effective acc. Voltage
around 4 MV/m. Aperture Hole Diameter 10 mm.
Normalized transverse Acceptance 34p mm mrad. ?
5.5 10 MeV/u Two 3.5 m Tanks, rf-Power 500
kW/Tank
6
Outlook
- Hall Extension in January 2005, available in
April/May - Shutdown 2005/2006 Installation of
two S-shaped Target Beam Lines in the new Hall
(still 3 MeV/u beam) ? better beam quality,
better X-Ray protection of of MINIBALL etc.
etc. If ISTC Collaboration works out.. -
Production of IH Cavities, Setup of 300 kW
Amplifier in the extended Hall until Shutdown
2007/2008 - Shutdown 2007/2008 Installation of
5.5 MeV/u Linac, in parallel Modification of
BERTRONIX Amplifiers - 2008 2010 Construction
of the 10 MeV/u Linac in Russia
Write a Comment
User Comments (0)
About PowerShow.com