Title: Chris Harty


1
Chris Harty
George Lyons
Garret Nicodemus
Heather Trumbour
2
Goals
  • The design and construction of the Emergency
    Generator Arm
  • Build a part of the project in each of the four
    major engineering disciplines

Constraints?
Prior Knowledge Variables Restrained Simplicity
3
Electrical
  • Use of AutoCAD
  • Assembly of Circuit Board

4
Circuit Board Schematic
5
Circuit Board Layout
Piecing together the Circuit
6
CIVIL
  • Use of Visual Analysis
  • Design of Cross Members
  • Force Testing

VisualAnalysis 3.12.EDU Report May 12, 2006 446
PM Project Generator Arm Test File H\Generator
Arm Test files\Original setup.VAP Engineer
Christopher Harty Billing For Educational
Purposes Only Default Units Inches, Pounds,
Degrees, ºFahrenheit, Seconds.   Nodal
Displacements
Node Load Case
DX DY RZ
in in
deg
N2 Service Case 2
0.0009 -0.0484 -0.2752

7
Member
Visual Analysis Tests for Cross Bracing Support
8
Test Results
9
Mechanical
  • Designed load cell using AutoCAD
  • Made the load cell with a CNC machine
  • Tested springs
  • Used spring equation

10
Parts
Custom Cut Aluminum Parts used in arm
11
Load Cell
AutoCAD and Gibbs Design used for CNC program
12
Spring Placement
13
Spring
14
Chemical
  • Pitot Tube Equations Used in Final Analysis

Simplified Equation
15
Completed Design
16
Analysis
  • Increased Air Velocity Greater Power Output
  • 3 mW at 30 mph on each resistor
  • 100 ? ,470 ? , 1000?

Goal
17
Results
Circuit Schematic for testing arm in wind tunnel
18
Results 100?
19
Results 470?
20
Results 1000?
21
Cost Analysis
  • Two Options to sell products to Boeing
  • Purchase from Leopard's
  • Manufacture ourselves
  • Guaranteed 15,000 a month from Leopards
  • Range between 1,097 and 19,720 profit if
    manufactured ourselves

22
Improvements
  • SINCE 960? meets the set goal per generator
  • Better Propeller, Bigger or more Aerodynamic
  • Spring is too fast, needs lock mechanism

23
Acknowledgments
  • Professor William Haller
  • Professor Scott Hummel
  • Professor Daniel Lewis
  • Professor Scott Moor
  • Professor Rebecca Rosenbauer
  • Professor Edmond Saliklis
  • Professor David Veshosky