IEEE P802.15 Working Group for Wireless Personal Area Networks - PowerPoint PPT Presentation

Loading...

PPT – IEEE P802.15 Working Group for Wireless Personal Area Networks PowerPoint presentation | free to download - id: 6a06c8-NGQyN



Loading


The Adobe Flash plugin is needed to view this content

Get the plugin now

View by Category
About This Presentation
Title:

IEEE P802.15 Working Group for Wireless Personal Area Networks

Description:

Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs) – PowerPoint PPT presentation

Number of Views:19
Avg rating:3.0/5.0
Date added: 8 August 2020
Slides: 16
Provided by: IanCGi4
Learn more at: http://grouper.ieee.org
Category:

less

Write a Comment
User Comments (0)
Transcript and Presenter's Notes

Title: IEEE P802.15 Working Group for Wireless Personal Area Networks


1
Project IEEE 802.15 Working Group for Wireless
Personal Area Networks (WPANs) Submission Title
Task Group 1 Opening Report for Session
15/Austin Date Submitted 12Nov01 Source
Ian Gifford Company Consultant Address 23
Kelshill Road, MA USA 01863 Voice1 978 251
3451, FAX 1 978 251 1437, E-Mailgiffordi_at_ie
ee.org Re 01/286r0, etc. Abstract TG1
Chair Overview to TG1,WG, and SEC. Purpose TG1
Chair report to TG1 to update them on the
Derivative Work i.e., 802.15.1 Std. Which was pre
submitted to RevCom on 26Oct01. Notice This
document has been prepared to assist the IEEE
802.15. It is offered as a basis for discussion
and is not binding on the contributing
individual(s) or organization(s). The material in
this document is subject to change in form and
content after further study. The contributor(s)
reserve(s) the right to add, amend or withdraw
material contained herein. Release The
contributor acknowledges and accepts that this
contribution becomes the property of IEEE and may
be made publicly available by 802.15.
2
IEEE 802.15 Working Group for Wireless Personal
Area Networks
  • TG1 Opening Report
  • November 2001 Austin, TX USA

3
Contents
  • Summary
  • Motion Planning
  • Overview of Session 15/Austin
  • Objectives
  • Submissions
  • Session Graphic
  • RevCom Submission
  • 01462r1aP802-15_WG-P802.15.1-RevCom-Submission.pd
    f
  • Project Planning Status
  • Next Meeting
  • Tentative Needs for Dallas
  • Objectives for Dallas
  • Drafting History

4
Summary 1 of 3
  • Task Group 1 (TG1) is deriving a draft standard
    from the Bluetooth specification under IEEE PAR
    802.15.1
  • At Session 15, motion SEC, address WG SEC
    comments, IF ANY
  • achieve majority approval from the WG SEC
    motions and enter RevCom phase. Pre submitted
    26Oct01.
  • During the Jul01/Nov01 between-session-period
  • SB1 ballot resolution
  • SB2 ballot RevCom Application for approval of
    P802.15.1
  • IEEE-SA, PatCom, RevCom, and BSIG

5
Summary 2 of 3
  • SB2 has 2 Disapproving Voters and 19 unresolved
    comments
  • (comment 7 is resolved as the 3rd DISAPPROVING
    Voter changed to a YES w/ comments.)
  • The TG1 will update 00375r3P802-15_TG1-Project-Pla
    nning.pdf once SEC approval is achieved.
  • ETA 17Nov01.

6
Summary 3 of 3
  • The 802.15.1 submittal will be reviewed by
    RevCom.
  • Preliminary comments will be sent to Project
    802.15.1 by the middle of November.
  • Scheduled StB Committee Meetings 4-6Dec01
  • http//standards.ieee.org/board/stdsbd/meeting-not
    ice.html
  • 4Dec01 PatCom - 6.2 Letter of Assurance from
    Bluetooth SIG, Inc. for P802.15.1
  • 5Dec01 RevCom - P802.15.1/D1.0.1 New "Standard
    for Information Technology

7
Planned Motions
  • Motions
  • 1 Wed, 14Nov01 to Full WG
  • 2 Fri, 16Nov01 to SEC

8
Session 15/Austin Motion 1 to the Full WG
  • Move to submit P802.15.1/D1.0.1-2001 to 802 SEC
    for approval of submission to RevCom.
  • Non Technical 50 (Procedural)
  • Moved ?
  • Second ?
  • Y/N/A //

Note TG1 pre-submitted D1.0.1 to RevCom on
26Oct01.
9
Session 15/Austin Motion 2 to the 802 SEC
  • Move that the ExCom forward IEEE Draft
    802.15.1/D1.0.1 to RevCom.
  • Non Technical 50 (Procedural)
  • Moved ?
  • Second ?
  • Y/N/A //

Note TG1 pre-submitted D1.0.1 to RevCom on
26Oct01.
10
Session 15/Austin Graphic
11
IEEE 802.15 Working Group for Wireless Personal
Area Networks
  • Sponsor Ballots (SBs) Summary Report

12
SBs Summary Report
  • Sponsor Ballot 1, passed _at_89
  • 30 Day Electronic Ballot
  • 27Jul01 Opened
  • 25Aug01 Closed
  • Sponsor Ballot 2, passed _at_89
  • 10 Day Electronic Recirculation Ballot
  • 2Oct01 Opened
  • 11Oct01 Closed

The BRC continues to communicate to the three (3)
DISAPPROVING Balloters and we are happy to report
that one (1) DISAPPROVING Balloter has reviewed
the resolutions and changed his initial and
recirculation vote from DISAPPROVING to YES WITH
COMMENTS (see 01/420r10 Comment 7) on 12Oct01.
This 3 to 2 change to the sponsor ballots up the
affirmation to 93.
13
SB1 Summary Report
  • P802.15.1/D0.9.2
  • Closing date 2001-08-25
  • The report is the result from the group 0000130
  • 1. This ballot has met the 75 returned ballot
    requirement.
  • 33 eligible people in this ballot group.
  • 26 affirmative votes
  • 3 negative votes
  • 1 abstention votes
  • 30 votes received
  • 90 returned
  • 3 abstention
  • 2. The 75 affirmation requirement is being met.
  • 26 affirmative votes
  • 3 negative votes
  • 29 votes
  • 89 affirmative

Source -01/420r10
14
SB2 Summary Report
  • P802.15.1/D1.0.1 Recirculation
  • Closing date 2001-10-11
  • This is a recirculation ballot. The report
    collates the results from the following groups
    0000130 0000169.
  • 1. This ballot has met the 75 returned ballot
    requirement.
  • 33 eligible people in this ballot group.
  • 26 affirmative votes
  • 3 negative votes
  • 2 abstention votes
  • 31 votes received
  • 93 returned
  • 6 abstention
  • 2. The 75 affirmation requirement is being met.
  • 26 affirmative votes
  • 3 negative votes
  • 29 votes
  • 89 affirmative

Source -01/420r10
15
SBs Summary Report (cont.)
Source -01/420r10
16
Generalization of Negative Comments
  • Proposed standard operates in the same band as
    802.11
  • Coexistence not addressed
  • Optional power level of 100mw
  • Normative vs. Informative SDL
  • Technical disagreements (how it works vs. how it
    might work better)

17
Tentative Needs for Jan02 Interim
  • 21-25Jan02 (5 Days)
  • 0 People

TG1 leadership is not planning to attend the
Jan02 Interim.
18
In conclusion, the Project 802.15.1 would like to
leave you with this slide ?
About PowerShow.com