Water Resources Vulnerable to Expanding Urban Development in the Texas Hill Country - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Water Resources Vulnerable to Expanding Urban Development in the Texas Hill Country

Description:

Title: Water Resources Vulnerable to Expanding Urban Development in the Texas Hill Country Author: Administrator Last modified by: John Created Date – PowerPoint PPT presentation

Number of Views:102
Avg rating:3.0/5.0
Slides: 10
Provided by: johndaneri
Category:

less

Transcript and Presenter's Notes

Title: Water Resources Vulnerable to Expanding Urban Development in the Texas Hill Country


1
Water Resources Vulnerable to Expanding Urban
Development in the Texas Hill Country
  • A Progress Report

2
Work Completed
  • All criteria have been analyzed and processed for
    analysis
  • Data ranges within each criteria have been
    selected. These ranges are based on the most even
    distribution of data per each category for every
    criteria.
  • A cartographic model was constructed to
    facilitate analysis of the data for each of the
    final maps tat will be produced.

3
Analysis Model
4
Work in Progress
  • Currently we are in the process of performing the
    analysis. We have done a first run of our model
    with equal weights for each criteria.
  • Creation and maintenance of metadata is underway
    and will be an ongoing process.
  • The basic website design has been created and
    will be online within the next two weeks.

5

6
(No Transcript)
7
Work Planned
  • We will evaluate methods for performing criterion
    weighing and will be conducting a sensitivity
    analysis to test the robustness of the results.
  • Cartographic model will be finalized with the
    appropriate formulae to calculate final
    vulnerability scores and show results
    geographically across the scope.
  • The final product includes a website containing
    web maps with the ability to zoom in on a
    particular county.
  • Other final deliverables
  • Static maps with the results
  • two posters with a summary of the analysis
  • Final project analysis report
  • DVD media containing all project data

8
Timeline
  • We are on target for delivery on May 11th 2009!

9
Meet the SMART team
  • John Daneri
  • Project Manager
  • Jacob Powell
  • Assistant Manager
  • Kathleen Callahan
  • GIS Analyst
  • Leah Gibson
  • GIS Analyst
Write a Comment
User Comments (0)
About PowerShow.com