Title: Interstate Operations Study Planning Simulation


1
Interstate Operations StudyPlanning Simulation
  • Fargo-Moorhead Metro COG
  • Wade E. Kline, AICP

2
Interstate Operations Study Study Intent
  • Depict existing freeway operations I-94 1-29
    Metro Area
  • Model existing conditions (2008), 2015, and 2035
    planning horizons
  • Identify deficiencies in relation to
    programmed/planned improvements
  • Develop and analyze alternatives for preservation
    of existing investments
  • Discuss options for bypass/beltway
  • Understand relationship of regional dynamics and
    growth trends
  • Two phase study, combines talents of local,
    state, and Federal agencies
  • Metro COG assisted by Advanced Traffic Analysis
    Center (ATAC)

3
Interstate Operations StudyStudy Area
4
Interstate Operations StudyProjected Population
Growth 2015
5
Interstate Operations StudyPhase I
  • Finalize 2015 and 2035 Regional Demand Model
    (Pending)
  • Interchange ramp and mainline counts (Complete)
  • External Origin and Destination Survey (Pending)
  • Construct Micro-simulation model of existing
    freeway system (Pending)
  • Public Input (early input complete)
  • Data Analysis and Issues Identification
    (complete)
  • Preliminary Goals and Objective Work (complete)
  • Preliminary Alternative Development (pending)

6
Interstate Operations StudyPhase II
  • To be determined
  • Development of Performance Measures
  • Finalize Alternatives Strategies
  • Analyze Alternatives Strategies
  • Issues Analysis
  • Development Policy Plan and Framework

7
Interstate Operations Study Planning Summary
  • Emerging Issue Identification
  • Freight
  • Exurban Growth
  • Job/HH Mismatch
  • East-West Capacity
  • ITS
  • Infrastructure Balance (MN vs ND) Funding
  • Growth vs. new capacity
  • Major Traffic Generators
  • TDM
  • Corridor Preservation

8
Interstate Operations StudySimulation Approach
  • Effectively analyze critical areas
  • Weaving sections, merge/diverge areas, control
  • TDM (Cube) ? VISIM ? VISSIM
  • Measures of Effectiveness (MOE)
  • Overall Network
  • Vehicle Trips, travel time, delay, etc
  • Freeway Interchanges
  • Movement volume, delay time, queue length
  • Routes/Locations
  • Vehicle trips, travel time, speed

9
Interstate Operations StudySimulation Outcome
  • Existing and Future Projected Operations
  • Identify Hot Spots Today and in the Future
  • Test Policy and Programming Alternatives
  • Test capacity, preservation, and policy
  • Develop Performance Measures to track system
    operations