Title: LGA Resource Recovery and Waste Summit - 10 February 2006
1LGA Resource Recovery and Waste Summit - 10
February 2006
Transportation of Waste Greg
Panigas
2LGA Resource Recovery and Waste Summit10
February 2006
- Waste Products
- Kerbside Collection
- Waste
- Recycle Material
- Green Waste
- Drop off Facilities
3LGA Resource Recovery and Waste Summit10
February 2006
- Options
- Direct to End Use/Disposal Facility
- To Resource Recovery / Transfer Station
- Haul from Resource Recovery / Transfer Station to
Disposal Facility
4LGA Resource Recovery and Waste Summit10
February 2006
- Costs Review
- End Use/Disposal Facility Rates
- Resource Recovery / Transfer Station Handling
Charges - Haulage Charges
5LGA Resource Recovery and Waste Summit10
February 2006
- Landfill Disposal Rates
- Based on URS report using the
- EPA Landfill Cost Model
- 1,300 tpa 187 per tonne
- 4,000 tpa 89 per tonne
- 10,000 tpa 83 per tonne
- 20,000 tpa 57 per tonne
- 60,000 tpa 44 per tonne
6LGA Resource Recovery and Waste Summit10
February 2006
- Transfer Station Costs
- Facility
- Drop off /Manned or Unmanned / Enclosed /
- Pre -Sorting
- Volume
- High or Low / Type of wastes
- Costs vary
- 6 to 30 per tonne
7LGA Resource Recovery and Waste Summit10
February 2006
- Transport from Transfer Stations
- Cost Model varies depending on
- Tonnage throughput
- Volume / Frequency of turn around /Compacted
Weight - Location
- B Double Access /Road train Access / Roll On Roll
Off - Costs vary
- Per 100 kilometres 8 to 35 per tonne plus
8LGA Resource Recovery and Waste Summit10
February 2006
- Worse Case _at_ 4,000 tpa (estimates)
-
- Put it through your own Transfer Station 10
- (49.34 stated in Regional Waste Management
Plan) - Haul 100 kilometres to own Landfill (RORO) 30
- Build own landfill 89
- Total 129
9LGA Resource Recovery and Waste Summit10
February 2006
- Another Approach
- Leave the product/waste in the Collection
Vehicle - Compact the truck to legal capacity
- Take the product to someone else's Landfill or
transfer Station - Pay a commercial rate for disposal or End Use
-
10LGA Resource Recovery and Waste Summit10
February 2006
- Costs based on 6 x 4 (leaving waste in Collection
Vehicle) - Waste _at_ 10 Tonne per load
- Road Speed _at_ 90 kph
- Costs _at_ 80 per hour
- 100 kilometres to destination
- 200 kilometre round trip
- Cost per Tonne Transport (17.78) 18
-
11LGA Resource Recovery and Waste Summit10
February 2006
- Worse Case _at_ 4,000 tpa
- Transportation 200 kilometre round trip 18
- Disposal (Quoted rate Transfer Station) 40
- Total 58
- Positive Cost variance of 71
12LGA Resource Recovery and Waste Summit10
February 2006
- Costs based on 6 x 4 (leaving waste in
Collection Vehicle) - Waste _at_ 10 Tonne per load
- Recycling _at_ 5 Tonne per load
- Green Waste _at_ 8 Tonne per load
- 200 kilometre round trip
- Waste Cost per Tonne 17.78
- Recycling Cost per Tonne 35.36
- Green Waste Cost per Tonne 22.22
-
13LGA Resource Recovery and Waste Summit10
February 2006
- Summary
- Evaluate waste streams quantity
- Review external existing facilities both
commercial and government (that meet EPA
requirements) - Get pricing on long term contract from existing
facilities - (currently 10 year plus contract available)
- Evaluate transporting direct in Collection
Vehicle - Review full costing of internalisation
- Compare
-