Chapter 1 An Overview of the Building Delivery Process: How Buildings Come Into Being Building Delivery Process Invoke first principles idea (owner ) building design ... – PowerPoint PPT presentation

Number of Views:213
Avg rating:3.0/5.0
Slides: 46
Provided by: dianear
Category:

less

Transcript and Presenter's Notes

Title: An Overview of the Building Delivery Process: How Buildings Come Into Being


1
An Overview of the Building Delivery ProcessHow
Buildings Come Into Being
Chapter 1
2
Building Delivery Process
  • Invoke first principles
  • idea (owner )
  • building design (architect, engineer)
  • construction (contractor/construction
  • manager)

3
Project Delivery Phases
  • Predesign
  • Design
  • Preconstruction
  • Construction
  • Postconstruction

4
Predesign Definition
  • The owners objectives, schedule, constraints
    and criteria including space requirements and
    relationships, special equipment, flexibility,
    expandability, systems and site requirements
  • From Standard Form of Agreement Between Owner
    and Architect (AIA Document B141)

5
Predesign Phase
  • Define building program
  • Assess economic feasibility
  • Site assessment and/or selection (Ch. 2)
  • Assess governmental constraints (Ch. 2)
  • Select design team

6
Building Program
  • Detailed written document used to guide design
  • reduce liability risk for architect
  • avoid misinterpretation

7
Building Program
  • Activities
  • Functions
  • Space requirements
  • Space sizes
  • Adjacencies

8
Economic Feasibility
  • Owners budget
  • Cost/benefit analysis
  • Availability of financing

9
Design Team
  • Typical design team under traditional contractual
    organization

10
Consultants
  • Civil and structural engineers
  • Mechanical, electrical, plumbing fire
    protection
  • Geotechnical
  • Acoustical
  • Landscape architect
  • Building type specialist

11
Relationships between design team members
  • Relationships between design team members

12
Design phase components
  • Schematic design
  • Design development
  • Construction documents

13
Schematic Design
  • Overall design concept that illustrates key ideas
    of the design solution.
  • Graphic solution to owners program
  • Multiple revisions

14
Design Development
  • Work with consultants to develop practical and
    pragmatic solutions to building systems
    envelope, structure, interior systems, MEPF, etc.

15
Construction Documents
  • Documentation required by the contractor to
    construct the building
  • Drawings
  • Specifications

16
Drawings Specifications
Graphic Written
Product/material shown many times Product/material described only once
Product/material generic Product/material specific
Quantity Quality
Location established Installation requirements established
Size, shape, relationship of building elements Description, properties, characteristics and finishes of building elements

17
Construction Drawings
  • Dimensioned drawings that delineate the building
  • floor plans
  • elevations
  • sections
  • large scale details

18
Specifications
  • Written technical descriptions of design intent.

19
Construction Documents
20
MasterFormat
  • Standard organizational format for specifications
  • Constructions Specifications Institute (CSI)

21
MasterFormat Numbering System
Level 1 Level 2 Level 3
Divisions Sections Subsection
01-50 00 00
22
(No Transcript)
23
(No Transcript)
24
Divisions 2 - 14 Facilities Construction Subgroup
  • Visualize construction process

25
Division 00 - Procurement Contracting
  • Advertisement for bids
  • Invitation to bid
  • Instruction to bidders
  • Prebid meetings
  • Land survey information
  • Geotechnical information

26
Division 00 - Procurement Contracting
(continued)
  • Bid forms
  • Owner-contractor agreement forms
  • Bond forms
  • Certificate of substantial completion form
  • Certificate of completion form
  • Conditions of the contract

27
Division 00 - General Requirements
  • Summary of work
  • Price and payment procedures
  • Product substitution procedures
  • Contract modification procedures
  • Project management and coordination
  • Construction schedule and documentation

28
Division 00 - General Requirements (continued)
  • Contractors responsibility
  • Regulatory requirements (codes, laws, permits,
    etc.)
  • Temporary facilities
  • Product storage and handling
  • Owner supplied products
  • Execution and close-out requirements

29
Preconstruction Phase
  • General Relationships Construction Team

30
Methods of Selecting a General Contractor
  • Competitive bidding
  • Invitational bidding
  • Negotiated contract
  • Multiple prime contracts

31
Bidding Documents
32
Bidding Documents/Contract Documents
  • Design team must produce graphics and text to
    convey design intent to contractors, and assure
  • accurate and competitive bids
  • detailed and descriptive submittals
  • efficient and accurate construction process
  • minimal questions, revisions or changes

33
Surety Bonds
  • Bid bond
  • Performance bond
  • Payment bond

34
Competitive Bidding - public projects
  • Advertisement for bids
  • Bid documents
  • Qualification of bidders
  • Bid bond

35
Invitational Bidding - private projects
  • Competitive process
  • Pre-screened (invited) general contractors

36
Negotiated Contract - private projects
  • Pre-qualified, trusted general contractor
  • General contractor involved during design or
    predesign phase
  • Helps control costs
  • Competition among subcontractors and material
    suppliers

37
Multiple Prime Contracts - fast track delivery
  • Form of negotiated contract used to speed up
    construction time
  • Multiple construction phases and contractors
  • Extensive coordination and sequencing required

38
Construction Phase
  • Implement contract documents
  • Submittals
  • shop drawings
  • mock-ups
  • material samples
  • product data
  • certifications
  • calculations

39
Architects review stamp
40
Construction Contract Administration
  • Review and approve submittals shop drawings
  • Observe construction
  • Prepare change orders (if required)
  • Interpret contract if needed
  • Certify pay requests
  • Inspect work

41
Postconstruction Phase - project closeout
  • Substantial completion
  • Punch list
  • Certificate of final completion
  • Record documents

42
Design - Bid - Build (Traditional ) Process
43
Construction Management
44
Construction Management At Risk - CMAR
45
Design - Build
  • Single firm designs and constructs the building
  • cost plus
  • lump sum