Using Industry-Style Software Engineering and Project Management in a Group Project

Description:

Title: Using Industry-Style Software Engineering and Project Management in a Group Project Author: User Last modified by: User Created Date: 1/3/2010 10:16:53 PM – PowerPoint PPT presentation

Number of Views:390
Avg rating:3.0/5.0
Slides: 46
Provided by: letuEdupe
Learn more at: http://www.letu.edu
Category:

less

Write a Comment
User Comments (0)
Transcript and Presenter's Notes

Title: Using Industry-Style Software Engineering and Project Management in a Group Project


1
Using Industry-Style Software Engineering and
Project Management in a Group Project
  • Jay-Evan J. Tevis
  • Department of Computer Science
  • LeTourneau University
  • Longview, TX
  • jaytevis_at_letu.edu

2
INTRODUCTION
3
Use of a Group Project
  • A group project may be added as a component of a
    software engineering course or course sequence
  • Its goal Students work as a team to design and
    build a large software system for a real-world
    situation
  • Probable result Because of the students lack of
    real-world project experience, they will most
    likely handle the project as a typical
    programming assignment (that, in this case, lasts
    the whole semester)

4
Characteristics of a Programming Assignment
Approach
  • Students are loosely-organized into a team
  • They are given some general directions on the
    software to build
  • They heroically attempt to build the software
    without any established requirements or a design
  • They struggle to make it all look like a
    well-implemented and tested software application

5
Key Weaknesses of an Application Built using this
Approach
  • Has not satisfied any baselined requirements
    (because none exist)
  • Has not followed a baselined design (because none
    exists)
  • Has not been adequately tested because of the
    lack of baselined requirements and test cases
  • Could not be built again the same way
  • Lack of any project planning
  • Lack of any project tracking and oversight of the
    time and resources needed to accomplish the
    project

6
What is a Baseline?
7
Definition of a Software Baseline
  • A configuration management concept that helps
    practitioners to control change without seriously
    impeding justifiable change
  • IEEE Definition A specification or product that
    has been formally reviewed and agreed upon, and
    that thereafter serves as the basis for further
    development, and that can be changed only through
    formal change control procedures
  • It is a milestone in the development of software
    and is marked by the delivery of one or more
    artifacts that have been approved as a
    consequence of a formal technical review

8
A Different Approach for a Group Project
  • We use an approach that goes beyond the concepts
    and skills taught in a traditional computer
    science curriculum
  • Our approach incorporates software engineering
    and software project management, and does so from
    an industry perspective

9
A Software Engineering Approach
  • Software engineering is defined as the
    application of a systematic, disciplined,
    quantifiable approach to the development,
    operation, and maintenance of software that is,
    the application of engineering to software
    (Pressman)
  • Software engineering requires the use of specific
    processes, methods, and tools with a quality
    focus foundation in order to develop software

10
Sample Elements of Software Engineering
  • Software life cycle models
  • Requirements gathering and analysis techniques
  • Design methodologies
  • Standards and metrics
  • Specifications
  • Formal reviews
  • Testing techniques

11
Emphasis on Key Process Areas of Project
Management (SW-CMM, Level 2)
  • Project planning
  • Project tracking and oversight
  • Requirements management
  • Configuration management
  • Quality assurance

5 - Optimized
4 - Managed
3 - Defined
2 -Repeatable
1 - Initial
12
Objectives for Using These Practices
  • Take advantage of the synthesis of computer
    science, engineering, and project management
  • Build a quality product that
  • Meets user requirements
  • Has a robust design
  • Is adequately tested
  • Finished on time and within budget

13
Two-Course Sequence First Course
  • Software engineering process, the SW-CMM, and
    software life cycle models
  • Object-oriented requirements analysis and design
    of a board or card game
  • Creation of a requirements specification and a
    UML-based design
  • Translation of the requirements and design into a
    completed software application

14
Two-Course Sequence Second Course
  • Software testing techniques
  • Group project that is six to seven weeks long
  • Software project management
  • Software metrics
  • Estimation for software projects
  • Risk management
  • Quality management
  • Change management

15
Overview of the Remaining Presentation
  • Group Project Organization
  • The Group Project in Operation
  • Results from Past Group Projects
  • Conclusion and Future Work

16
GROUP PROJECT ORGANIZATION
17
Objective of the Group Project
  • Given a software development problem and a
    software development group
  • the student will apply software engineering and
    software project management principles and
    practices
  • in various assigned roles
  • required to complete the
  • Object-oriented requirements analysis
  • Object-oriented design
  • Construction
  • Testing
  • for a software product

18
Organizational Structure
Software Engineering Directorate Dr. Tevis
CustomerLiaison Stephen Brown Joshua Millet
SoftwareDesign Caleb Reinking Peter Moore
Daniel PattenGary Raduns
Quality Assurance Kim WhiteSilas
BrillBrett ClarkAustin EylerDaniel
FergusonMichael Roettger
Requirements Management Spenser James Aaron
Cutbirth Josh Haines Jon Hersack Aaron
HumeErik Lindow
Project Management Elijah Lofgren
Configuration Management(Contractor)
C SoftwareConstruction Robert Whiting Ben
CooleyJames DentonBrett Smith
Java SoftwareConstruction Benaiah HenryEvan
AllrichDave Estes Bill Tuscher
19
Role of Project Manager
  • Based on the task network, the organizational
    responsibilities, and the project objectives,
    construct an initial timeline chart for the
    project
  • Maintain the timeline chart over the life of the
    project by getting subtask information from the
    team leaders and updating the status of all tasks
    as information becomes available
  • Submit updated timeline charts to the Software
    Engineering Director before each directorate
    meeting and as requested
  • Use the timeline chart to brief the current
    status of the project at each directorate meeting
  • Report any project abnormalities, problems or
    delays to the Software Engineering Director
  • Collect artifacts after each formal review from
    Requirements Management, Software Design,
    Software Construction, and Quality Assurance that
    need to be baselined
  • Submit these artifacts to Configuration
    Management for baselining

20
Note If formal approval does not occur
following a review or audit, this will require an
implied return to the previous non-review step
in the process
Task Network for the Organizational Software
Development Process (Version 4)?
21
List of Formal Reviews
  • Software Requirements Review
  • Preliminary Design Review
  • Critical Design Review
  • Test Readiness Review
  • Test Outcome Review
  • Functional Configuration Audit
  • Physical Configuration Audit

22
Format for the Software Requirements and Testing
Table
Passed Test?
Actual Output
Expected Output
Input Data
Qual. Type
Requirement Description
Req. ID
TestCase
Status
Initial Added Changed Deleted
Analysis Demonstration Inspection Test
23
THE GROUP PROJECT IN OPERATION
24
Software Requirements and Testing Table
25
Group Project Web Page (top half)
26
Group Project Web Page (bottom half)
27
Artifacts from the Requirements Analysis Phase
(Slide 1 of 2)
Use case diagram
Problem-domain class diagram
System-level state diagram
28
Artifacts from the Requirements Analysis Phase
(Slide 2 of 2)
Interface requirements specification
29
Artifacts from the Design Phase (Slide 1 of 2)
Design-level class diagram
Identification of attributes and methods for each
class
30
Artifacts from the Design Phase (Slide 2 of 2)
Interface design description
31
Artifacts from the Construction Phase
Source code files
32
Artifacts from the Testing Phase
The results from performing the test cases
33
Artifacts from the Delivery Phase (Slide 1 of 2)
Updated and detailed class diagram
34
Artifacts from the Delivery Phase (Slide 2 of 2)
Corrected source code
Software version description
35
RESULTS FROM PASTGROUP PROJECTS
36
Reasons for Adapting the Group Project
  • Number of students enrolled in the course
  • Lessons learned from previous projects
  • Feedback from the students on the group project

37
Example Adaptations
  • The course needs to be held on MWF rather than
    T-Th to accommodate the scheduling of the formal
    reviews
  • The project needs to have a written policy on the
    use of laptop computers during the class meetings
  • To create more robust teams, we assign students
    to a team based on student preferences and on
    their performance in previous computer science
    courses

38
The Software Engineering Director
  • This position is filled by the course instructor
  • The role needs to be performed sincerely and
    completely as an integral part of the software
    development company
  • The director should be able to
  • Act as the moderator at class meetings and formal
    reviews
  • Make decisions on the direction of the project as
    it occurs
  • Approve changes in the schedule
  • Baseline project artifacts
  • Handle dissatisfied employees (i.e., students) in
    the company
  • Reassign team leaders or members if a team fails
    to fulfill its responsibilities or needs help

39
Major Keys to Success of the Group Projects
  • A prescribed software process
  • Clearly defined team roles
  • Good organizational skills of the project manager
  • Good performance by the team leaders

40
Example Experiences Gained by each Student
  • Depends on the role of each team
  • Project manager learned about the challenges of
    teams not completing their tasks on time
  • Requirements management team learned about the
    effort to gather and document user requirements
  • Design team learned about the chore of creating
    a design based on pages of user requirements
  • Construction team learned about the
    difficulties of translating a design into source
    code
  • Quality assurance team learned about the
    importance of well-defined and quantified
    requirements and well-written test cases

41
Skills that are Learned and Practiced
  • Communication skills by speaking in front of a
    group
  • Travel skills from planning a hypothetical trip
    to a location for a formal review
  • Coordination skills from working as a team and
    with other teams
  • Leadership, followership, and delegation skills
    working as a team leader or team member
  • Time management skills by following a timeline
    chart and finishing tasks on schedule
  • Discussion skills in handling comments,
    questions, arguments, and compromises in a formal
    review

42
CONCLUSION AND FUTURE WORK
43
Summary
  • A group project should be more than just a
    semester-long programming assignment
  • It can be an opportunity for students to learn,
    experience, and use industry-style software
    engineering and software project management
    techniques
  • We have described our approach for doing this
  • Group project organization
  • The group project in operation
  • Results from past group projects
  • In this group project approach, students
    experience some of the responsibilities, events,
    stress, and elation that come with project work
    in industry

44
Future Plans
  • Continue incorporating
  • Industry processes, methods, and tools into the
    group project
  • Lessons learned from students and recommendations
    from industry professionals
  • Include accounting students in the next group
    project
  • Provide a prediction of project costs
  • Establish a budget
  • Track the actual dollar costs of the software
    development effort as the project proceeds
  • Bring cost data into the decision-making
    discussions of the project

45
GROUP PROJECT WEBSITE
  • www.letu.edu/people/jaytevis/Software-Engineering/
    software-engineering.html

ANY QUESTIONS?