Title: Integrated Information Governance with New Solutions for Archiving, eDiscovery and Compliance
1Integrated Information Governance with New
Solutions for Archiving, eDiscovery and
Compliance
Ahmad Salama EMC Content Management Archiving
CMA Sales Manager Egypt, Libya and
Gulf salama_ahmad_at_emc.com
2Agenda
- EMC Documentum in Oil Gas
- Oil Gas Information Management Value Chain
- Oil Gas Case Studies
- Sample Content Management Functional Requirements
- Email Management
- Todays tough Email challenges
- Approaches to Email Growth
- EMC SourceOne Email Management
- Case Studies
3EMC Documentum in Oil Gas
4Documentum Middle East Sample Customers
inEnergy, EPC and Utilities ? 90 Penetration
Energy
Engineering, Procurement and Construction (EPC)
Utilities
5Content Management ArchivingOil Gas Case
Studies
6Oil GasInformation Management Value Chain
7Oil and GasInformation Management Value Chain
Marketing, Sales and Customer Service
Refining, Supply, and Distribution
Business Operations and Corporate Administration
Field Exploration Development
Field Data Collection Management Electronic
Well File (EWF) Engineering Standards and
Procedures Quality Specification Management EHS
Standards Procedures Project Document Management
Corporate identify Communications
Management Website Management Customer
Portal Call center Support Distributor Portal
Bid Proposal Management Engineering, Plant
Facility Management Contract Management EHS
Standards Procedures Manuals
Training Division Orders Land Records Management
Correspondence System Contract Management Corporat
e Intranet AP/AR Processing Employee Records
Management Financial Regulatory Compliance Email
Management
8EWF Management Solution at Chevron
- Business Drivers
- Needed improved well file access and security
- Reduction for on-site file space requirements
- Physical degradation/loss of key well data.
- Solution
- Landmark system integration and overall project
management services. Core technology - Documentum
Enterprise Content Management. - Business Results
- 35,000 linear feet of shelving replaced by 500 GB
of storage - File Room Staff reassigned to other duties
- Misfiling eliminated
- Created Disaster Recovery assurance and ensures
business continuity - Historical data degradation problem eliminated
- Data retrieval time reduced from 24 hours to 1
minute - Web access to same data/files
Company Profile Chevron is an integrated energy
company - ranked second largest in the US and
fifth largest worldwide. It conducts business in
180 countries. Around two thirds of the oil
production comes from 20 countries outside the US
a truly global enterprise. Headquartered in
San Ramon, CA, USA. Industry Oil and Gas
9Project Management Solution at ExxonMobil
- Business Drivers
- Need to manage all project documentation
including drawings, correspondence, contracts,
and SOPs - Must scale - anticipated tens of millions of
documents to manage - Collaboration is a must with many organizations
involved in the project, etc. - Enforce consistent, auditable business rules and
processes - Solution
- Core technology - Documentum Enterprise Content
Management. - Business Results
- Document retrieval time reduced from days to
minutes - Documents now accessible in a secure Documentum
repository - Established collaboration environment
- Optimized regulatory compliance processes
Company Profile Exxon is the worlds largest
integrated energy company - ranked 1 in the
Fortune Global 500. Exxon Mobil's 45 refineries
in 25 countries have a capacity of producing 6.4
million barrels per day. The company supplies
refined products to more than 35,000 service
stations in about 100 countries that operate
under the Exxon, Esso, and Mobil brands.
Headquartered in Irving, TX, USA. Industry Oi
l and Gas
10Saudi Aramco Improves Contract Management
- Business Drivers
- Process of creating new contracts is slow,
tedious, and inefficient with many departments
involved in the creation and review process. Huge
economic stake - from millions to billions. - Law obligation to securely keep contracts for 15
years - Difficult to search and access contracts in a
secure environment - Solution
- Documentum Enterprise Content Management solution
with workflows - Business Results
- Contracts Department now creates and audits
contracts using automated process with
significant reduction of contract processing time - Contracts are now securely stored in a Documentum
repository and are accessible on line by
authorized Users - Users can now access contract information within
seconds (from days without the ECM system)
Company Profile Saudi Aramco is the worlds
largest fully integrated petroleum company, with
the world's largest oil reserves - over one
quarter of the global total. Headquartered in
Dhahran, Saudi Arabia. Reserves of 262B
barrels. Production of 11M bpd. Industry Oil
and Gas
11SAP Archiving with Documentum at BP
- Decision Process
- In June 06, a Documentum and Captiva solution
selected as the global SAP archiving standard at
BP - A 6 month decision cycle including head to head
competition with the top 6 SAP archiving vendors - The Solution
- Enterprise wide Documentum product suite
including Captiva for scanning/imaging. - 15K Users expected to be deployed
- Deployment Scenarios
- Raw Data Archiving for SAP
- Data Archiving and Viewpoint
- Data Archiving, scanning and A/P workflow
- Data Archiving with scanning
-
Company Profile BP is the third largest
integrated energy company - ranked 4 in the
Fortune Global 500. BP operates 19 refineries in
26 countries. The company supplies refined
products to more than 28,500 service stations.
Headquartered in London, UK. Industry Oil
and Gas
12Oil GasTypical Functional Requirements
13Functional RequirementsSmart Capturing - Process
- Digitise paper, convert digital content, extract
indexes from - structured, semi-structured and unstructured
documents, - automatic delivery to content management system
Store
14Functional RequirementsSmart Capturing End
User Perspective
15Functional RequirementsDistribution Control
ISO 90012008 Requirement
- Approve documents for adequacy prior to issue
- Availability at point of use
- Review and update as necessary and re-approve
documents - Ensure that changes and the current revision
status of documents are identified - Monitor, measure and analyse quality management
processes
16Functional RequirementsTechnical Documents
(Review Change Management)
-TEMP
Final
17Functional RequirementsTechnical Documents
(Review Change Management) Cont.
18Functional RequirementsArchiving Retention
Management
Core
19Email Management
20Email Challenges
21Which of these challenges are you facing?
- Compliance and eDiscovery
- Responding cost-effectively to eDiscovery
requests - Collecting archive data efficiently during audits
and investigations - Enforcing information management policies for
both e-mail and unstructured data throughout the
enterprise
- Operational Challenges
- Escalating costs for primary storage
- Difficulty meeting backup and recovery windows
- Ensuring timely access to historical information
for users
While IT Budgets are flat or declining
Global purchases of IT goods and services will
equal 1.66 trillion in 2009, declining by 3
percent after an 8 percent rise in 2008. Global
IT Market Outlook 2009, Forrester Research,
January 12, 2009
22Approached to Email Growth
23Approaches to Email Growth Part 1Adding
Production Storage
- Addressing growth by adding capacity is a
stop-gap measure - Not sustainable solution for long term email
management -
- Larger Mailboxes mean
- Slower performance
- Increase admin overhead
- Longer backup windows
- More data to replicate
- Restores take longer
- Duplicate copies
24Approaches to Email Growth Part 2Forcing
Mailbox Limits
- Consequences of mailbox quotas
- Users creating personal archives (.PST and Notes
local archives) to get below quota - Mobile devices (e.g. Blackberry) users can be
locked out when quota is reached cant send or
receive any emails - Risks of PST files
- Unmanaged by corporate retention
- Operational waste of backup and disk resources
(e.g. file servers) - Security risk if PC stolen
- Backup not consistent against PCs may lose all
of the content
User Desktops
EnterpriseSAN
25SolutionEMC SourceOne Email Management
26Solution Email Management Message Flow
- Organize and Classify
- Address Rules
- Retention and disposal policies
- Unique ID for single instancing
- Collect
- Real-time
- Scheduled
- PST/NSF collection
- User Directed Archiving
- User/Admin searches
- Web-based search to access archive
- Full Text Index
- Optional indexing of messages, attachments
- Includes embedded and Zip messages (20 layers
deep) - Ability to set indexing policy at folder level
Email Management Server(s)
- Centera sends back digital finger print content
address
- Archive Messages
- Better than 21 compression
- Create container files
Messaging servers
EMC Centera EMC Celerra
- Store Container Files
- Copy containers to Email Management server
storage - Write to archive storage device on set schedule
- Discovery Manager searches
- Search and collect content in archive for
discovery searches - Put on legal hold
27Solution Phase 1 Shortcut Process
Shortcut
Remove restrictive mailbox quotas through
proactive shortcut process
Message 1 Jan. 1, 2009 To Rick Subject
Question Attached Message 2 Jan. 1, 2009 To
Ron Subject Update Attached Message 3 Feb. 1,
2009 To Bill Subject Training
Message 1 Jan. 1, 2009 To Rick Subject
Question Attached Message 2 Jan. 1, 2009 To
Ron Subject Update Attached Message 3 Feb. 1,
2009 To Bill Subject Training
Users Inbox
E-mail Archive
28Shortcut Process - Before
29Shortcut Process - After
Preview pane unchanged
30Solution Phase 2 Deletion
- Email Management offers two phased approach to
managing mailbox sizes as content ages - Delete from user inbox on production mail server
- Content remains access in the archive via
Web-based search client until retention period
expires
31EMC SourceOne Email Management Case Studies
32Customer Success EMC IT
- Email Archiving Results
- Lifted restrictive mailbox quotas
- Eliminated .PST file creation
- Reduced production storage by 60
- Cut discovery time from days to hours
- Reduced backup times from 10-12 hours to 2-3
hours - SourceOne Email Management Enhancements
- Improve scalability and performance
- Centralize management
- Provide users with Web-based search
- Support multi-byte character sets
Company Profile Microsoft Exchange about 40K
mailboxes 40 of Employees outside of US _at_ 400
sales offices Publicly traded NYSE -
EMC Industry Focus on information
infrastructure with commitment to acting in a
socially and environmentally responsible manner
33Customer Success Orascom Telecom Holding OTH
- Challenges
- Large attachments Quotas
- PST!!!
- Aged content on production storage
- Archive Policies
- 60-day shortcut policy
- 2 year deletion from Exchange
- Results
- Reduced mailbox sizes by 60
- Backup window reduced by over 70
- Company Profile
- A global Telecom, Media and Entertainment player,
with operation in four continents and number of
subscribers approaching 100 Million. - Environment
- Clustered MS Exchange 2007
- Clustered EMC EmailXtender
- 2 x EMC Centera
- HP EVA SAN Storage
We can be used as a reference for EMC Email
Management Solutions!!!. -- Hani Naim,
Messaging Senior Manager
34xCelerated Composition PlatformxCP
35xCelerated Composition Platform
36Business Activity Monitor Dashboard
37(No Transcript)