Review of Goals and Action Items from last time (O. Lupie)--5 min - PowerPoint PPT Presentation

Loading...

PPT – Review of Goals and Action Items from last time (O. Lupie)--5 min PowerPoint presentation | free to download - id: 79893e-MDUxY



Loading


The Adobe Flash plugin is needed to view this content

Get the plugin now

View by Category
About This Presentation
Title:

Review of Goals and Action Items from last time (O. Lupie)--5 min

Description:

Agenda Review of Goals and Action Items from last time (O. Lupie)--5 min WFC3 and COS Instrument Development Status (G. Blue)--10 min WFC3 FSW Status and Schedule (G ... – PowerPoint PPT presentation

Number of Views:36
Avg rating:3.0/5.0
Slides: 12
Provided by: lup65
Learn more at: http://www.stsci.edu
Category:

less

Write a Comment
User Comments (0)
Transcript and Presenter's Notes

Title: Review of Goals and Action Items from last time (O. Lupie)--5 min


1
Agenda
Review of Goals and Action Items from last time
(O. Lupie)--5 min WFC3 and COS Instrument
Development Status (G. Blue)--10 min WFC3 FSW
Status and Schedule (G. Blue)--20 min WFC3 MOU
Ground System Development Status (O. Lupie W.
Baggett)--15 min Consolidated WFC3 Schedule (B.
Rehm) --20 min Break ? 20 minutes COS FSW
Status and Schedule (G. Blue) --20 min COS MOU
Ground System Development Status (C. Keyes
Wayne Baggett)--15 min WFC3 ICAL Status and
Schedule (D. Fineberg) 15 minutes Transition
Planning (Grant Blue) --15 min Discussion
Lunch
1
2
Revisit Goals
Schedule and schedule drivers review. Provide
forum for discussion. Linkages and Interface
clarification. Improve Information flow. Next
splinter meeting planning. Talk directly with
team counterparts. Establish perspective how
each piece fits into whole. Renew commitment for
timely information exchange.
2
3
Revisit Goals
Schedule and schedule drivers review. Provide
forum for discussion. Linkages and Interface
clarification. Improve Information flow. Next
splinter meeting planning. Talk directly with
team counterparts. Establish perspective how
each piece fits into whole. Renew commitment for
timely information exchange.
3
4
  • Action Items from March 27th Splinter
  • Plan for WFC3 and COS splinter at Ball Summer
    2001 ? CLOSED
  • Initiate Tracking of WFC3 FSW and Ground System
    Development ? CLOSED (Brian, Grant, Olivia,
    Wayne) tracking and dependencies now included
    in Thais development schedule
  • Initiate Tracking of COS FSW and Ground System
    Development ? OPEN (unassigned)
  • WFC3 and COS need updated schedules for the
    delivery of test data suites ? CLOSED (G. Blue)
  • Investigate merging of stimulus keywords with
    science data keywords CLOSED Plan OK (ICAL)
  • WFC3 MOU updated to reflect new schedules and
    March 27 splinter ? CLOSED - O. Lupie
  • WFC3 MOU to address real-time TV support and
    connection to STScI ? CLOSED O. Lupie
  • Investigate COS and WFC3 Transition Plan
    Requirements ? IN WORK B. Friedman to present _at_
    splinter.
  • Scrub DRD Delivery Dates ? CLOSED (G. Blue)
  • Get COS and WFC3 Timing Tests on Grants Schedule
    Grant to work with Tom Wheeler ? INWORK
  • Address Fire-Wall issues for remote access to COS
    and WFC3 Telemetry ? CLOSED
  • Closed Actions from previous splinters
  • Have SISEs participate in WOWG and COWG ? CLOSED
    (R. Henry, STScI)
  • Address details of Tom Wheelers support of ACS,
    COSlt and WFC3 timing tests ? CLOSED (C. Blades,
    STScI)
  • Link from GSFC Private WFC3 pages to GSFC FSW/OPS
    site ? CLOSED (Ball)
  • Provide Instructions to Ball and GSFC for
    accessing the STScI OPR system ? CLOSED (W.
    Baggett, STScI)
  • DM-05 to be placed on Web ? CLOSED (M. Draugelis,
    Ball)

5
STScI - WFC3 Achievements since last time Ops
Telecon support New error message review process
is working well. Ground System functionality
available for basic UVIS Accum, IR Multi-
Accum, Lamp Operation, Darks/Biases (Mike
Robinson, Wayne Baggett). WFC3 Pipeline and
Archive CDR held on 10/16/2001 (Howard
Bushouse) Delivery of AV-03 (Calibration
Requirements) October, 2001. TV Science
Calibration report submission (Neill Reid, Frank
Bartko). TV software support information
gathering meeting 08/2001. Recommendation for
TV Data Handling System submission 10/2001.

Front-end
Pipeline
ICAL
5
6
STScI WFC3 Memorandum of Understanding
  • Driven by Thermal Vac.
  • Documents interfaces/dependencies ? Ball,
    STScI, GSFC, ICAL.
  • Now focuses on two categories of STScI
    support
  • Long-Term OPUS Pipeline processing and long
    term Hubble Archive Storage.
  • Time-Critical- Specialized system for quick-look
    analysis with real-time archive.

recent addition
6
7
Key MOU Items version 10/15/2001
  • 5. Delivery of WFC3 OPS Test Bench Images
    March 1, 2002
  • Source Grant Blue, Ball
  • Recipient WFC3 Science IPT
  • Completion of Code and Unit Test Build 3.0
    March 30, 2002 Source Grant Blue,
    Ball Recipient STScI ESS (T. Wheeler FSET )
  • 7. Delivery of Images from the Integrated
    Optical Bench - June 1, 2002.
  • Source Grant Blue, Ball
  • Recipient WFC3 Science IPT
  • 8. Delivery of TV-Specific and Optical
    Stimulus Keywords
  • Initial version October 31, 2001, Complete
    version May, 2002
  • Source WFC3 ICAL
  • Recipient WFC3 Science IPT


7
8
Key MOU Items version 10/15/2001
9. Delivery of TV-Specific and Optical Stimulus
Keywords Initial version 10/31/2001,
Complete version 05/2002. Source WFC3 ICAL
Recipient WFC3 Science IPT (H. Bushouse,
WFC3 Pipeline and Archive) 11. OPUS Staging
Disk Implementation December, 2002
Source WFC3 ICAL Recipient STScI
OPUS 12. Delivery of Beta Version of OPUS -
June 1, 2002 (Final Version October 2002)
Source STScI OPUS Recipient WFC3 Science
IPT and WFC3 ICAL


8
9
SEPT, 2001
DM-06 snapshot telemetry and internal header
data
OPUS Keywords
OS, TV Keywords
DEC, 2001
SMS timing trials
Test Bench Early Images
MAR, 2002
Test Bench Image Suite
Science SMS Testing Begins
Build 3 C/U Complete
Integrated Optical Bench Images
Beta OPUS
JUN, 2002
ICAL Proto Testing
SEPT, 2002
Final OPUS
KEY
Front End
Archive
Pipeline/Archive
DEC, 2002
TV Cal Support
TV Readiness Test
TV
Thermal VAC
Version October 15, 2001
MAR, 2003
Complete SMS Testing for SMGT
9
SMGT
JUN, 2003
10
  • STScI Ground System Development Linkages
  • 1yr between Build 3 C/U SMGT
  • 2mo between Full Suite Ops Bench Images and Beta
    OPUS
  • 4mo between Beta OPUS and Final OPUS Deliveries
  • Final Opus ready for TV Readiness Test Dec,
    2002
  • 2mo from TV Readiness Test to start of TV.

10
11
SEPT, 2001
DM-06
OPUS Keywords
OS, TV Keywords
DEC, 2001
1-2 month slip
SMS timing trials
MAR, 2002
Test Bench Early Images
Test Bench Image Suite
Build 3 C/U Complete
Start SMS Testing
Integrated Optical Bench Images
JUN, 2002
ICAL Proto Testing
ICAL limited to test of real-time system
BETA OPUS
SEPT, 2002
KEY
Minimal testing of Final OPUS no ICAL tests
Front End
Pipeline/Archive
Final OPUS
DEC, 2002
TV Cal Support
TV Readiness Test
TV
Archive not ready for TV Readiness. No test-time
Archive
Schedule-Incompatibility
Thermal VAC _at_ GSFC
MAR, 2003
Version November 1, 2001
Incomplete SMS testing. Risk final Phase
development effort.
SMGT
JUN, 2003
Complete SMS Testing
11
About PowerShow.com