Light Load / High Voltage Operations in the Boston Area and High VAR Costs in 2004 - PowerPoint PPT Presentation

1 / 16
} ?>
View by Category
About This Presentation
Title:

Light Load / High Voltage Operations in the Boston Area and High VAR Costs in 2004

Description:

... Address the universal issue of needing dynamic versus static reactive support in Boston at light load (clutch Mystic 7? STATCOM?, etc.) ... – PowerPoint PPT presentation

Number of Views:242
Avg rating:3.0/5.0
Slides: 17
Provided by: Defa329
Learn more at: http://www.iso-ne.com
Category:

less

Write a Comment
User Comments (0)
About PowerShow.com