Trends in Wind Energy Component Logistics - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Trends in Wind Energy Component Logistics

Description:

Current Logistics Snapshot & Near Term Trends. The Future Breadbox ... Carrier demurrage at origin and wind farm. Lost crane productivity. Construction delays ... – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 10
Provided by: justin146
Category:

less

Transcript and Presenter's Notes

Title: Trends in Wind Energy Component Logistics


1
Trends in Wind Energy Component Logistics
  • Prepared for
  • AWEA Wind Energy Fall Symposium 2008
  • Accelerating Wind Industry Growth Towards 20
  • November 20, 2008
  • Palm Desert, CA

2
Introduction
  • About Professional Logistics Group, Inc.
  • Contents
  • Sizing the Breadbox
  • Current Logistics Snapshot Near Term Trends
  • The Future Breadbox Under 20 by 2030
  • Required Innovations to Get There
  • This presentation will be available at
  • www.prologisticsgroup.com
  • www.awea.org

2
3
Sizing the Breadbox
  • Cost of turbine logistics equal to about 10-15
    of total turbine cost
  • Approx. 225K per turbine
  • Approx. 140K per MW
  • 2008 1.1B US wind transportation market
    85 via truck
  • Hidden costs resulting from built-in
    inefficiencies
  • Carrier demurrage at origin and wind farm
  • Lost crane productivity
  • Construction delays
  • Opportunity cost of delays to commissioning

3
4
Sources of Component Logistics Inefficiency
  • Poor planning
  • Suppliers/sourcing in flux
  • Logistics regarded as an afterthought non-core
    cost center
  • Lack of management depth in logistics
  • EXW sale terms
  • Highway regulations
  • Fuel costs
  • Infrastructure constraints
  • The larger transportation ecosystem

4
5
The Imperative Under 20 by 2030
  • Drive out inefficiencies
  • Keyword Innovation
  • Planning
  • Mode mix
  • Asset utilization
  • Component design

5
6
Current Logistics Snapshot Near Term Trends
  • Double whammy
  • Late renewal of PTC, and only for one year
  • Credit crunch delaying or terminating wind
    projects
  • Impact
  • OEMs late to commit
  • Slack transportation market
  • Aggressive truck pricing
  • No material improvement in highway permitting
  • Inconsistencies in requirements, changes
  • Diesel prices favoring shippers

6
7
The Future Breadbox Under 20 by 2030
  • 8 9.6 MW additions YOY over next five years
  • 1.3 - 1.6B annual transportation spend
  • Driver Change in avg. turbine size over time
  • Forecast of key metrics
  • Logistics cost per turbine est. 338K (50)
  • Logistics cost per MW est. 131K (-9)
  • Challenges by component
  • Nacelles increased weight 3MW machines in
    multiple loads
  • Towers base sections increasing diameter
  • Blades - gt37.3M unable to transport 2x per
    trailer

7
8
A Prescription for Required Innovations
  • Become multimodal innovatively!
  • Include logistics as part of core commercial
    strategy
  • Get logistics involved early in
  • Site selection
  • Sourcing decisions
  • Component design
  • Put transportation in the palette of issues
    advanced by AWEA
  • Utilize 3PL/4PL resources that are mode,
    carrier, and node neutral

8
9
Thank you!
For more information, please contact Graham
Brisben, President Professional Logistics Group,
Inc. 1-708-386-0700 gbrisben_at_prologisticsgroup.c
om WWW.PROLOGISTICSGROUP.COM
9
Write a Comment
User Comments (0)
About PowerShow.com