Computer Simulation Model for the Stator Subassembly of an Electronic Hydraulic Power Steering Syste - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

Computer Simulation Model for the Stator Subassembly of an Electronic Hydraulic Power Steering Syste

Description:

Computer Simulation Model for the Stator Subassembly of an ... dation. Gather. Results. Determine. Allowances. Model. Constraints. Implement. Into. Model ... – PowerPoint PPT presentation

Number of Views:124
Avg rating:3.0/5.0
Slides: 23
Provided by: jso2
Category:

less

Transcript and Presenter's Notes

Title: Computer Simulation Model for the Stator Subassembly of an Electronic Hydraulic Power Steering Syste


1
Computer Simulation Model for the Stator
Subassembly of an Electronic Hydraulic Power
Steering System
Third Update November 13th, 2001
  • Juan Soto
  • Hugo Sanchez
  • Carlos Terrazas

2
Project Goal
3
Objective
Make the transfer of the production line from
London to El Paso feasible through computer
simulation of its critical subassembly and the
factors affecting it.
4
Agenda
  • Project Status
  • Introduction
  • Project Summary
  • Problems Encountered
  • Future Work
  • Conclusions
  • Open Forum

5
Project Status
  • Data Collection Completed
  • Simulation Model is close to completion
  • Project is on schedule

6
Project Status
7
Background
DANA Automotive components manufacturer. Electron
ic Hydraulic Power Steering System
(EHPS). Prototypes produced in England. El Paso
Facility responsible for transition from
prototypes to mass production.
8
Team Approach
Identify Critical Assembly
Identify Process
Identify Tasks
MOST Analysis
Determine Allowances
Model Constraints
Implement Into Model
Build Learning Curves
Give Recomen- dation
Gather Results
9
Project Summary(work completed)
  • Meetings with Dana
  • Operation Process Charts
  • MOST Work Measurement Analysis
  • Learning Curves

10
Project Summary(work completed)
Motor
Motor
Stator
Stator
The Subassembly was divided into five
subassemblies.
Manifold
EHPS
Manifold
EHPS
Rotor
Rotor
Pump
Pump
EHPS Subassemblies
EHPS Subassemblies
11
Project Summary(work completed)
12
Project Summary(work completed)
13
Project Summary(work completed)
  • Assembly Sequence
  • Operations for each Process

14
Project Summary(work completed)
Routing Sheet for Stator Subassembly
15
Project Summary(work completed)
Bill of Materials for Stator Subassembly
16
Project Summary(work completed)
MOST Time Measure Units (TMU) conversion to time
in seconds and minutes
17
Project Summary(work completed)
18
Project Summary(work in progress)
Draft of Simulation Model for the Stator
19
Problems Encountered
Lack of information from the company. Time study
was substituted with MOST Work
Measurement. Videos were not delivered.
20
Future Work
  • Final Report and Presentation
  • Arena5.0 Simulation Results
  • Recommendations

21
Conclusions
  • Even though some of the data was available later
    than expected, the project is still scheduled to
    be completed on time.
  • Additional factors such as production forecast,
    scrap rates, delivery times, and machine
    characteristics will be added to the final model.

22