Provisional Operation and Maintenance of the CTBT IMS Infrasound Network - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Provisional Operation and Maintenance of the CTBT IMS Infrasound Network

Description:

Provisional Operation and Maintenance of the CTBT IMS Infrasound Network – PowerPoint PPT presentation

Number of Views:34
Avg rating:3.0/5.0
Slides: 16
Provided by: THoff7
Category:

less

Transcript and Presenter's Notes

Title: Provisional Operation and Maintenance of the CTBT IMS Infrasound Network


1
Provisional Operation and Maintenance of the CTBT
IMS Infrasound Network
  • Thomas L. Hoffmann
  • IMS Infrasound Section
  • Comprehensive Nuclear-Test-Ban Treaty
    Organization
  • Provisional Technical Secretariat
  • Vienna International Centre
  • P.O.Box 1200
  • A-1400 Vienna - AUSTRIA
  • Infrasound Workshop
  • La Jolla, CA, 27-30 October 2003

2
Station Installation Completed
What comes next?
3
POST-INSTALLATION ACTIVITIES TERMINOLOGY
Station Installation
Testing Evaluation
Station Certification
4
POST-INSTALLATION ACTIVITIES Common Work Tasks
for TE and PCA
5
Testing Evaluation (TE) of Infrasound Stations
6
Station-Specific Considerations
  • State party interests (NDC or basic topology)
  • OM setup (spares, experience, training)
  • Geographical (remoteness, climate, safety,
    infrastructure)
  • Configurations (RF, cable, equipment set, etc.)
  • Entities (commercial, NDC, university, etc.)
  • Data availability (97, 98, and 99.5 during
    TE)

7
Work Tasks for Testing Evaluation
Applies also to PC-Phase
To IMS Ops
8
Post-Installation Activities in Vienna
9
Station Certification
  • Certification Visit
  • Thorough testing of station equipment
  • Review of station documentation
  • Equipment calibration
  • Station Certification
  • Data quality monitoring
  • (Timely) data availability monitoring
  • CTBTO certification meeting

10
Infrasound Certification Program (Status 4Q
2003)
11
Data Monitoring Trouble Shootingin Vienna
12
New Developments Cristal
  • Continuous monitoring tool
  • Data availability monitoring
  • Data quality monitoring
  • Automate tedious monitoring tasks to better
    focus on real station problems
  • The program is being tested in a pilot study
    until the end of 2003
  • New modules are being developed for automated
    monitoring
  • Implementation for full scale IMS station
    monitoring planned in 2004

13
New Developments GUI based IRS
Graphical User Interface to IMS Reporting System
for Station Operators
All report types just one click away Easy to use
browser-based interface for SO Avoid formatting
errors with reporting templates Reduce work load
for manual input of reports in the IRS