Schedule Changes - PowerPoint PPT Presentation

1 / 34
About This Presentation
Title:

Schedule Changes

Description:

Citgo moved to Wednesday at 10:00 in Salon 10 replacing Saudi Aramco presentation ... Sign up for Feedback Forums at Registration ... – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 35
Provided by: davidat9
Category:

less

Transcript and Presenter's Notes

Title: Schedule Changes


1
Schedule Changes
  • Citgo moved to Wednesday at 1000 in Salon 10
    replacing Saudi Aramco presentation
  • Cascade moved on Wednesday from 800am to 845am
    in Salon 3 4
  • Don Smith John Matranga replace Polimeri
    presentation on Wednesday at 845 in Salon 10
  • Sign up for Feedback Forums at Registration

2
(No Transcript)
3
Reliant Resources Generation Information
Environment (GIE) Using ActiveView
Presented By
Billy Crosby Angelina Tran
4
Presentation Summary
  • Reliant Resources Company Overview
  • Business Drivers
  • System Scope
  • Leveraging User Community
  • Generation Information Environment (GIE)
  • Demo
  • Questions and Answers

5
Reliant Resources Company Information
  • Reliant Resources, Inc., based in Houston, Texas,
    provides electricity and energy services to
    retail and wholesale customers in the U.S.,
    marketing those services under the Reliant Energy
    brand name.  The company provides a complete
    suite of energy products and services to more
    than 1.8 million electricity customers in Texas,
    ranging from residences and small businesses to
    large commercial, industrial and institutional
    customers.  Reliant also serves large commercial
    and industrial clients in the PJM (Pennsylvania,
    New Jersey, Maryland) Interconnection.  The
    company has approximately 20,000 megawatts of
    power generation capacity in operation, under
    construction or under contract in the U.S.
  • For more information, visit our web site at
    http//www.reliantresources.com

6
Business Drivers
  • Provide Fleet wide Plant Monitoring
    Capabilities
  • Leverage Staff Expertise, by Providing Remote
    Monitoring Diagnostics for Subject Matter
    Experts (SMEs)
  • Support the Predictive Maintenance Process
  • Provide Stations with Data and Analytical Tools
    to Support Operations
  • Provide Standard Database for Fleet Metrics
  • Generation Data
  • Fuel Usage - Gas Meter and Fuel Burn Data
  • Emissions Data
  • Unit Status and Control System States
  • Align with Power Generations Goal to be the Low
    Cost Power Producer

7
System Scope
  • Utilize an IT approach to Implementation and
    Systems
  • Management
  • 46 Plants
  • 32 Plant PI Servers
  • 5 Central PI Servers
  • 90 API Nodes
  • 199 Interfaces

8
System Scope
  • Common Plant Historian (CPH) Team has developed
    and
  • supports
  • Process Screens (680)
  • Reports and Spreadsheets
  • Performance Equations and ACE Calculations
  • Performance Modeling
  • Provide Training to user community on GIE and OSI
    Tools

9
GIE CPH Architecture
10
GIE CPH Architecture
11
Leveraging User Community
  • Site Champions identified for each plant and
    Central Support Services.
  • Key individuals are responsible for maintaining a
    Master ProcessBook for their site.
  • Accountable for keeping sites local copy
  • Communicate change mgmt to PI Team
  • Subject Matter Experts / Specialist
  • Direction and Priorities are set by
  • Power Operations Management
  • Plant Peer Groups (Coal, Combined Cycle, Cyclic,
    Peaking)

12
Leveraging User Community
  • CPH Team works with our clients to gather and
    receive requirements.
  • Gather requirements through Site Champions and
    SMEs
  • Phone, Web Forms, Email, Internal User Group
    Meetings
  • CPH Team designs, develops, and tests
    applications
  • Co-development of applications with the clients
  • Leverage existing work to minimize redundant
    development
  • Migrate into Production/GIE Environment
  • Proactive communication with client
  • Relationship development

13
GIE ActiveView - Cheswick SO2
14
GIE ActiveView Coolwater Unit Overview
15
GIE ActiveView - Ceredo Gen TU Exhaust
16
GIE ActiveView - Brunot Island Condensate
17
GIE Technical References SMT Tag List
18
GIE Objectives
  • To share PI and technical information throughout
    the Corporation
  • Process Screens
  • Excel Reports
  • Word Documents
  • etc
  • Enable the CPH Support Team to easily maintain
    the menu structure and content of the Reliant
    Resources GIE.
  • Provide a method of submitting requests and
    contacting the CPH Team
  • Provide answers to FAQs and share PI usage best
    practices
  • Give CPH Team a secure location for sharing files
    and conducting administrative tasks.

19
GIE Structure
  • ActiveView
  • This is the Meat and Potatoes section of the
    GIE
  • Dynamically Generated Hierarchical Menu
  • Houses Process Screens and various Plant
    Information Reports
  • Technical References
  • Dynamically Generated Hierarchical Menu
  • Houses Technical Documents, SMT Tag Dumps, etc
  • System Support
  • Password protected area for CPH Team to share
    files and carry out administrative tasks
  • Service Requests
  • Allows users to submit requests via web forms
  • Contact Us FAQs

20
GIE ActiveView - Performance Modeling
21
GIE ActiveView - Automated Reporting
22
GIE Technical References
This is where you will find helpful technical
information relating to PI and the plants. This
information can range from Configuring your
browser to access Active View to specific plant
hardware diagrams or SMT Tag Lists.
23
GIE Service Request - Web Forms
  • Changes
  • Inquiries
  • Issues
  • Tag Requests
  • Screen
  • Development

24
GIE Technical Overview
  • The Dynamic Menus are generated based on the
    structure of the Web Servers directories and the
    files contained within them. This is done via a
    two step process.
  • Step 1
  • An ASP page will be run that reads the
    Folder/File structure of the server using the
    FileSystemObject (FSO) Object. This ASP page
    creates HTML strings based on that structure,
    which it then stores in the servers cache via
    Application Variables.
  • Step 2
  • The menu will be created dynamically on the front
    end by another ASP page reading the HTML strings
    from the Application Variables in the servers
    cache.
  • The menu is hierarchal based on the Folder
    Structure of the server.

25
GIE Technical Overview (cont.)
26
GIE Technical Overview (cont.)
  • Dynamically Displaying PDI files created with
    ProcessBook
  • Our key to dynamically displaying PDI files is an
    ASP page that acts as a container for the
    ActiveView ActiveX object.
  • This ASP page facilitates the following functions
    for the ActiveX object
  • Checks the version of ActiveView the user has
    installed versus the version installed on the
    server. It will automatically update if needed.
  • Updates the known servers list on the clients
    machine
  • Informs the object of which file it needs to
    display

27
GIE PI ActiveView System Requirements
  • Minimum Requirements for Web Server
  • Windows NT server 4.0, SP3 or greater
  • Microsoft Internet Services Personal Web Server
    Version 4.0 (PWS) or Microsoft Internet
    Information Server 4.0 (IIS) or 5.0
  • Minimum Software Requirements for Users
  • Windows 95, Windows 98, Windows NT 4.0 SP3 or
    later, or Windows 2000
  • 16 MB RAM (at least 32 MB RAM is recommended)
  • Microsoft Internet Explorer 4 or Netscape 3.0
  • 32 MB of hard disk space
  • A Netscape browser may be used if you are not
    planning to download installation files from the
    Web site. The Netscape browser must also contain
    a plug-in enabling the use of ActiveX controls.
  • Requirements obtained from http//www.osisoft.com

28
Demonstration
29
GIE Demo
Web Server
GIE Menu
Root level menu Corresponds to Directory
Structure of Web Server
File that resides in the ActiveView Folder
Clicking on the West menu item will display the
folders under the West, just like in Windows
Explorer
Files that resides in the West Folder
30
GIE Demo
Clicking on a file from the menu on the left will
cause that file to open in the right hand side of
the screen. Information about the PDI files is
passed to the Container ASP page.
31
GIE Demo
Scrolling menu When necessary
ActiveX Component allows for scalable process
screens.
32
Questions and Answers
33
(No Transcript)
34
Schedule Changes
  • Citgo moved to Wednesday at 1000 in Salon 10
    replacing Saudi Aramco presentation
  • Cascade moved on Wednesday from 800am to 845am
    in Salon 3 4
  • Don Smith John Matranga replace Polimeri
    presentation on Wednesday at 845 in Salon 10
  • Sign up for Feedback Forums at Registration
Write a Comment
User Comments (0)
About PowerShow.com