3. Facility Dismantling Procedures. 4. Assessment Locations. 5. Soil Boring and Monitoring Well Installation Procedures ... Facility Dismantling Procedures ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 15
Provided by: tkbog
Learn more at: https://engg.k-state.edu
Category:

less

Transcript and Presenter's Notes

Title: Review of Current Conditions Report and Work Plan for Area 1


1
Review of Current Conditions Report and Work
Plan for Area 1
  • Presented by
  • The Great Plains/Rocky Mountain Technical
    Outreach Services for Communities

2
Report Organization
  • 1. Introduction
  • 2. Current Conditions
  • 3. Facility Dismantling Procedures
  • 4. Assessment Locations
  • 5. Soil Boring and Monitoring Well Installation
    Procedures
  • 6. Soil and Stream Sediment Field Screening and
    Sample Collection and Handling Procedures
  • 7. Groundwater Monitoring Well Development and
    Sampling Procedures and Surface Water Sampling
    Procedures
  • 8. Determination of Remediation Objectives
  • 9. Soil Remediation Procedures
  • 10. Documentation and Reporting
  • 11. Selected References

3
Introduction
  • Area 1 is about 14 acres, 2 miles long, 60 feet
    wide
  • goal of process is to obtain a No Further
    Remediation (NFR) letter from IEPA
  • Area 1 is to be a bicycle trail
  • plan to remediate soil as necessary
  • and/or install an engineered barrier
  • groundwater remediation if necessary would occur
    while Area 1 is in use

4
Current Conditions
  • Area 1 includes
  • underground concrete and piping from several
    buildings that need to be removed
  • a septic tank and piping from office building to
    ditch on Eastern plant boundary
  • no recorded spills within Area 1 boundaries
  • groundwater less than 10 feet below surface, flow
    is 0.05 to 0.57 feet per year

5
Current Conditions
  • no SWMUs in Area 1
  • storm water drainage is to the North and South
    Stormwater Ponds
  • Area 1 crosses 5 wetland areas

6
Preliminary soil assessment (Feb 2000)
  • 62 samples from 23 borings
  • Appendix B tables organic chemicals
  • Tier I remediation objectives exceeded
  • benzene at 2 to 4 feet in two locations (BC-4 and
    BC-10)
  • benzo(a)pyrene at 0 to 2 feet in two locations
    (BC-12 and BC-22)
  • benzo(a)fluoranthene and benzo(a)anthracene also
    at BC-12

7
Preliminary soil assessment (Feb 2000)
  • Appendix B tables organic chemicals
  • benzo(a)pyrene at 0 to 2 feet in two locations
    (BC-12 and BC-22)
  • the detection limit for this chemical is greater
    than the calculated soil remediation objective by
    about 4 times.
  • There appear to be no Tier I remediation
    objectives for 1-methylnaphthalene,
    2-methylnaphthalene and phenanthrene
  • will Tier II calculations be required by IEPA?

8
Preliminary soil assessment (Feb 2000)
  • Appendix B tables inorganic chemicals
  • beryllium in 48 of 62 samples
  • arsenic in 61 of 62 samples
  • It appears that this is a natural occurrence of
    these metals. The average amounts are similar to
    reported values for Will county.

9
Environmental Audit (July 1990) Appendix H
  • 2 sampling locations overlap Area 1 (F3 and F4)
  • toluene, trichloroethylene, and oil and grease
    were detected

10
Facility Dismantling Procedures
  • fluids will be removed from pipes with vacuum
    trucks and burned for energy recovery
  • water in pipes or structures will be tested and
    released, treated or shipped offsite, as
    appropriate
  • a cross section of Area 1 will be trenched to
    search for unknown structures
  • geophysical surveying will be used to identify
    unknown structures

11
Future Assessment Plans
  • at least one soil sample from under each
    structure in Area , except lunch room and gate
    house
  • at least one soil sample for every 250 feet along
    length of Area 1
  • up to 3 monitoring wells will be installed in
    Area 1
  • upstream and downstream surface water and
    sediment will be sampled for each stream crossing
    Area 1

12
Remediation Objectives
  • If Tier I remediation objectives are exceeded,
  • soil or groundwater will be cleaned up
  • an engineered barrier will be used, or
  • a Tier 2 evaluation will be done.

13
Remediation procedures
  • Petroleum impacted soil will be removed
    immediately when found
  • stops ongoing migration of contaminants to
    surrounding soil and groundwater
  • sidewalls and bottom of excavation will be
    sampled and tested for remaining contamination

14
Documentation and Reporting
  • maps showing location of former piping and
    structures
  • summary of assessment and cleanup procedures
  • figures and tables showing sample locations,
    where soil was removed, screening and laboratory
    results
  • laboratory reports
  • description of procedures followed
  • summary of management and final disposal of
    contaminated soil
Write a Comment