Petroleum Engineering 626 Offshore Drilling Lesson 6C Motion Compensation - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Petroleum Engineering 626 Offshore Drilling Lesson 6C Motion Compensation

Description:

Bumper subs are designed to stroke, and if operated at a single position, they ... Bumper Subs ... Remember: bumper subs fit into the same part of the ... – PowerPoint PPT presentation

Number of Views:320
Avg rating:3.0/5.0
Slides: 13
Provided by: sarak
Category:

less

Transcript and Presenter's Notes

Title: Petroleum Engineering 626 Offshore Drilling Lesson 6C Motion Compensation


1
Petroleum Engineering 626Offshore
DrillingLesson 6C Motion Compensation
2
Lesson 6C - Motion Compensation
  • Bumper Subs
  • T H - wd
  • Buoyant Riser
  • Jackup Rig

3
Bumper Subs
  • Fit into the drill collar string, but do not
    have the ruggedness of drill collars. To obtain
    a reasonable operating life from bumper subs,
    action has to be taken on the following
    points of concern
  • 1. Always run the bumper subs at the neutral
    point in the string.

4
Bumper Subs, contd
  • 2. Bumper subs are designed to stroke, and if
    operated at a single position, they will wear
    at that position.
  • 3. Running the subs in tension minimizes the
    area through which the torque will be
    transmitted, and will cause excessive wear and
    fatigue.

5
Bumper Subs
  • 4. Running the joint in compression increases
    torque reversals and fatigue in the tool. It
    also increases bit chatter and instantaneous
    peak torque, causing unnecessary wear to the
    tool and the string. This is the fault of the
    operation, not the sub.

6
Bumper Subs
  • 5. From items 3 and 4 above, it is evident that
    once the string has been run, the weight on the
    bit is fixed. This weight should not be changed
    until the string has been pulled and the
    number of drill collars below the bumper sub
    changed.

7
Bumper Subs
  • 6.Do not separate the bumper subs in a
    drillstring for heavy drilling operations.
  • 7.Special care and maintenance are required to
    obtain a reasonable operating life.
  • Remember bumper subs fit into the same part of
    the drillstring where drill collars and
    stabilizers have been destroyed. This is a severe
    test of workmanship maintenance.

8
Unbalanced Bumper Subs
9
Buoyant Riser Module
10
Cantilever Jackup Rig
Float out to location Then lower legs to
seafloor Then jack up
11
Jackup Rig Side View
12
Jackup Rig Deck Plan