Preparation of Technical Study for the project Motorway on the Corridor Vc using Digital Elevation M - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Preparation of Technical Study for the project Motorway on the Corridor Vc using Digital Elevation M

Description:

... were created by scanning and digitalizing the existing ... 3D image for Motorway on the Corridor VC with the Ortho Photo and the Digital Topographic DATA ... – PowerPoint PPT presentation

Number of Views:65
Avg rating:3.0/5.0
Slides: 15
Provided by: Sel59
Category:

less

Transcript and Presenter's Notes

Title: Preparation of Technical Study for the project Motorway on the Corridor Vc using Digital Elevation M


1
Preparation of Technical Study for the project
Motorway on the Corridor Vc using Digital
Elevation ModelSarajevo, September 2005
  • IPSA
  • INSTITUT

2
Content
  • About IPSA
  • Project Motorway on the Corridor Vc
  • Digital topographic data provided by JICA Study
    Team
  • Motorway location
  • Example for the longitudinal profile of terrain
  • 3D animation of the Motorway

3
About IPSA
  • IPSA Institute is private independent consultant
    company founded in 1958
  • Since its foundation in 1958, IPSA Institute has
    successfully carried out more than 7300 studies
    and designs
  • The scope of services include preparation of
    feasibility studies, research studies, designing
    and supervision for the works in the area of
    transport infrastructure, construction and water
    and energy supply

4
Motorway on the Corridor Vc
  • Motorway on the Corridor Vc Budapest-Osijek-Saraje
    vo-Ploce, through BiH, is the most important
    developmnet project for BiH
  • This Corridor is included in the European
    transport infrastructure network
  • Corridor Vc route, with length about 330 km,
    follows the direction north-south, through the
    area populated with more than 52 of the whole
    population

5
  • General layout of the Corriod V with three
    branches
  • Corridor Vc direction
  • Budapest (Hungary) Osijek (Croatia)
  • Sarajevo (BH)
  • Ploce Harbor (Croatia)

6
Motorway on the Corridor Vc
  • IPSA, together with other firms from Consortium,
    is preparing planning-study documentation which
    includes
  • technical study
  • analitical-documentation basis
  • conceptual design
  • enviornment protection study
  • preliminary design
  • feasibility study

7
Digital topographic data provided by JICA Study
Team
  • DEM (Digital Elevation Model) is used as the
    basis for preparation of Technical Study
  • The DEM is developed from contour line data
    that were created by scanning and digitalizing
    the existing 125000-scale topographic maps by
    ArcInfo software
  • Contour line data from ArcInfo had to be
    converted into .dwg format to become usable for
    the softwares used in local firms

8
DEM for the study area
9
Motorway location
  • Entering terrain data from .dwg format
  • Drawing of the route and vertical alignment
  • Data processing in these softwares gives the
    longitudinal profiles of terrain

10
Longitudinal section - River Trebacka with bridges
11
Longitudinal section tunnel Vijenac L2964 m
12
3D image for Motorway on the Corridor VC with the
Ortho Photo and the Digital Topographic DATA
13
http//www.ipsa-institut.com
14
  • Thank you for your attention!