Title: Mr' Jack Hart Program Manager, Joint CBRN Equipment Assessment Program JEAP Chair, DoD NBCD Shelf Li
1Mr. Jack HartProgram Manager, Joint CBRN
Equipment Assessment Program (JEAP) Chair, DoD
NBCD Shelf Life Sub-Committee
Department of Defense Nuclear, Biological and
Chemical Defense (NBCD) Shelf Life Commodity Panel
2Joint Equipment Assessment Testing Services
3Joint Equipment Assessment Testing Services
Contd.
- Production Lot Testing
- JEAP team conducting production lot level testing
on NBC assets in accordance with applicable
MIL-SPECs to insure serviceability for immediate
and out years field use - Initial quality control standards are achieved
during the acquisition process and issues are
remedied during production, therefore JEAP
involvement at PLT level critical to achieving
cradle-to-grave oversight to the asset - Items tested under the direction of the JEAP
- CBRN protective clothing and equipment
4Joint Equipment Assessment Testing Services
Contd.
- Shelf-Life Extension Testing
- Shelf-life extension testing at defined intervals
key to monitoring serviceability of assets during
aging - JEAP cyclic assessment involvement augments
consolidation of an items performance data at
specific intervals for easy evaluation of its
degradation for shelf life extension or early
disposal - The JEAP is the focal point for all CBRN
protective clothing and equipment testing and
data collection - Chemical Protective Gloves
- BVOs/GVOs
- Southwest Asia Returns
- TAP Aprons
- STEPO
- M291 Kits (new lab in Albany, GA)
5Joint Equipment Assessment Testing Services
Contd.
- Quality Assurance
- JEAP quality assurance processes cover the
spectrum of parameters that affect the quality of
NBC assets. - Cyclic Assessments
- Test Plan Review
- Test Evaluation
- Example 1 TAP Aprons failed surveillance
testing due to insufficient seam strength. - Source of failure manufacturer testing product
incorrectly - Action taken defined correct testing procedure
- Example 2 ALO boots failing porosity testing.
- Source of failure manufacturer testing product
incorrectly - Action taken defined correct testing procedure
- Production Lot Testing
- Example ALO boot lots being lotted incorrectly
- Source of issue multiple lots contained in
single delivery lot - Action Taken defined proper lot delivery
process -
6Joint Service Set-Aside Program (JSSAP)
- Mission To continuously assess the condition
and monitor degradation of CBRN IPE issued to
service members and assets stored at the
wholesale/retail level. To assist the Commanders
at all levels of supply with the readiness of
CBRN equipment. - Warehousing 5 Current Locations
- Providing Samples For Toxic and Physical
Property Testing.
7Defense Reutilization and Management Services
(DRMS) PROJECT
- Mission The mission of the JEAP DRMS Project is
to - provide efficient and cost effective collection,
assessment, - preparation, and reassignment of serviceable CBRN
- /Clothing Textiles. Further, the JEAP DRMS
Project will - ensure proper demilitarization of unserviceable
assets while - striving for complete and accurate
accountability.
8JEAP-Defense Reutilization and Management
Services (DRMS) PROJECT
- FY04 Statistics
- 1.2M items screened for disposal
- 1.1M dollars in Condition Code A assets
recovered - JSLIST
- Have received 47K assets for screening
- Have identified 2400 as Condition Code A
- JEAP-DRMS IPT
- Implement better business processes
- FOC expected Jul 05
- Funding
- Approx 5.6M requirement
9Joint Equipment Assessment Units (JEAUs)
- Army
- Recently teamed with ECBCs assessment team to
conduct a large scale mask assessment for the
Armys V Corp in Germany. - Working with ECBC and Rock Island to develop plan
to assist III Corps in improving mask readiness
for deploying forces - Navy
- Conducted an assessment of a Navy ship at the
beginning of this month. - Plan to conduct additional assessments at a shore
facility and at CNAFs consolidated storage
facility by end of FY05. - Marine Corps Currently developing ConOps for
conducting assessments of CBRN equipment at the
USMC Consolidated Storage Facilities.
10Joint Equipment Assessment Units (JEAUs)
- Air Force Working with AFCESA to
- Transition Protective Mask Assessment Team (PMAT)
to fully functioning JEAU - Teaming with PMAT to conduct Joint assessments at
several Air Force sites by end of FY05. - DLA
- Currently developing the Concept of Operations
for conducting cyclic inspections of CBRN
equipment at DLA facilities. - Conducted a pilot study at DDAG in Dec 04 and are
projected to conduct another at DDBC in Apr 05
11Joint Logistics Advisory Committee (JLAC)
- JPEO-CBD is moving from a multi-service life
cycle management process to include a Joint
Service Sustainment Process. - Meeting held 1-3 December 2004
- Representation from all 5 services and DLA
- Goals and Objectives of the Council
- Obtaining an understanding of every services
Sustainment process - Determine the feasibility of a Joint Service
Sustainment - Determine what to consider for a JSS and how to
proceed - Identify an architecture/IPT structure and POC
list to continue the initiative to next level
12Joint Logistics Advisory Committee (JLAC)
2/28/2005
1
1
13Joint Logistics Advisory Committee (JLAC)
- Follow-up meeting held 8-9 Feb 2005 Fort Belvoir,
VA - Reviewed the JLAC Draft Charter
- JEAP provided the following Draft Documents
- Draft Sub-IPT Charter
- Draft Surveillance Plan
- Draft Assessment Plan
- Draft Tables for all IPE within DoD
14Marine Corps Consolidated Storage Facilities
(CSF)NBCD STRATEGIC LOGISTICS ASSET MANAGEMENT
(SLAM)PURPOSE
- To enhance operational force capabilities by
centrally - managing CBRN equipment in order to establish an
- immediate and sustainable state of readiness in
- conjunction with constitution.
15Marine Corps Consolidated Storage Facilities
(CSF)NBCD STRATEGIC LOGISTICS ASSET MANAGEMENT
(SLAM)
- Methodology
- NBCD SLAM consolidates and regionally locates
Marine Corps Nuclear, Biological, and Chemical
Defense (NBCD) equipment under a single
management concept and operation. - ALMAR 070/03 established that effective 24
November 2003, the Marine Corps consolidated NBCD
equipment funding, acquisition, and management
under the Program Manager (PM) for NBCD
equipment, Marine Corps Systems Command. - CBRN equipment requisitions done through
NBCD/Consolidated Issue Facility (CIF) Branch,
Marine Corps Logistics Command, Albany GA.
16Marine Corps Consolidated Storage Facilities
(CSF)NBCD STRATEGIC LOGISTICS ASSET MANAGEMENT
(SLAM) LOCATIONS