Ceiling%20Radiant%20Cooling%20Panels%20as%20a%20Viable%20Distributed%20Parallel%20Sensible%20Cooling%20Technology - PowerPoint PPT Presentation

About This Presentation
Title:

Ceiling%20Radiant%20Cooling%20Panels%20as%20a%20Viable%20Distributed%20Parallel%20Sensible%20Cooling%20Technology

Description:

Ceiling Radiant Cooling Panels as a Viable ... Penn State University, Dept. of Architectural Engineering. Integrated with Dedicated Outdoor Air Systems ... – PowerPoint PPT presentation

Number of Views:257
Avg rating:3.0/5.0
Slides: 19
Provided by: brentm2
Category:

less

Transcript and Presenter's Notes

Title: Ceiling%20Radiant%20Cooling%20Panels%20as%20a%20Viable%20Distributed%20Parallel%20Sensible%20Cooling%20Technology


1
Ceiling Radiant Cooling Panels as a Viable
Distributed Parallel Sensible Cooling Technology
Integrated with Dedicated Outdoor Air Systems
  • Christopher L. Conroy, E.I.T.
  • L. D. Astorino Companies, Pittsburgh PA
  • Stanley A. Mumma, Ph.D., P.E.
  • Penn State University, Dept. of Architectural
    Engineering

2
Presentation Overview
  • Introduction
  • Radiant Cooling Theory
  • HVAC Paradigm
  • Advantages
  • Example
  • Integration of Fire Suppression
  • Conclusions and Solutions

3
Integrating Dedicated Outdoor Air Systems with
Parallel Terminal Systems
4
Radiant Cooling Theory
  • Uses both Radiation and Convection
  • Radiation (50-60)
  • Stefan-Boltzmann Equation
  • qr 0.15x10-8 (tp460)4 (ta460)4
  • Convection (40-50)
  • ASHRAE SE 1996
  • qc 0.31 tp- ta0.31 (tp- ta)

5
Radiant Cooling Paradigm
  • Expensive
  • High first cost
  • Difficult or improper installation
  • Unavailable
  • Condensation!!!
  • Condensation!!!
  • Condensation!!!

6
Radiant Cooling Panel Construction
7
Cost Advantages
  • Long Term Savings
  • Smaller, More Efficient Chillers
  • Reduced Fan Energy
  • Reduced Maintenance Cost
  • Not paying for Over Ventilating
  • Other Cost Savings
  • Piping is not insulated
  • Reduced Sprinkler Piping
  • Testing and Balancing Made Simpler




8
Indoor Air Quality Advantages
  • High comfort levels
  • No condensate drains or drain pans
  • Meets ANSI/ASHRAE Std 62-1999
  • Quick response time
  • Individual room control at low cost

9
Building Advantages
  • Architecturally Integratable
  • Silk screening available
  • Perforated face (acoustics)
  • Great for Retrofit or New Construction
  • Reduces Mechanical Space
  • Less Ductwork
  • Less vertical shaft space
  • Higher ceilings and/or reduced building heights
  • Simpler Coordination Between Trades
  • Integration of fire suppression
  • Less interferences (crossover ductwork)

10
Example Step 1Defining Parameters
  • Open Office Plan
  • 1000 ft2
  • Define Design Conditions
  • 78ºF DBT / 40 RH
  • 7 People (20 cfm/person)
  • Space Loads
  • 7 People (Office Work)
  • 2 W/sq ft (Lighting)
  • 1 W/sq ft (Equipment)
  • 4,000 Btu/h (Skin Loss)
  • 14,000 Btu/h (Total Sensible)
  • 1,435 Btu/h (Total Latent)

11
Step 2Estimation of CRCP Capacity
12
Step 3Calculation of CRCP Capacity
  • Room DPT 52F
  • 78F / 40 RH
  • DOAS DPT 44F
  • 1,435 Btuh Latent Load
  • 140 cfm _at_ 55F
  • 3,500 Btuh Sensible Load
  • Panel tfi 55F
  • Panel Temp 60F
  • Qs 29.7 Btuh/ft2
  • 10,500 Btuh
  • 354 ft2 of panel

13
Step 4Selection and Layout of CRCP
  • 126 4x2 Ceiling Panels
  • 1000 ft2
  • 24 Light Fixtures
  • 20 of Ceiling
  • 49 Ceiling Radiant Cooling Panels
  • 392 ft2 (40)
  • 400 sq. ft. Leftover
  • Diffusers
  • Sprinklers
  • Qs 26.7 Btuh/ft2
  • Room RH 43
  • Increase DOAS DPT

14
Step 5Compare Acoustical Performance of CRCP
Acoustical Ceiling Vs CRCP
Reverberation Time (sec)
Frequency (Hz)
15
Chilled Water Loop
COMPRESSION TANK
MAKE-UP PUMP
ZONE VALVES
CRCPs
SECONDARY PUMP (VFD)
16
Integrated Fire Suppression System
17
Conclusions and Solutions
  • Seen the Advantages
  • Concluded that CRCPs can be Used Safely with No
    Condensation Problems
  • Defined a Simple Selection Process
  • Examined the Opportunity for Fire Suppression
    Integration
  • Break the HVAC Paradigm
  • More Successful Applications
  • Spreading the Word
  • Explore the Possibilities of Lowering Cost
  • Increase Availability
  • Research a way to produce custom lengths on site
  • Development Through the Solar Industry

18