Transcript and Presenter's Notes

Title: INTEGRATION GROUP SUMMARY Absorber and Focus Coil Working Group Meeting


1
INTEGRATION GROUP SUMMARYAbsorber and Focus Coil
Working Group Meeting
  • Experimental equipment
  • Edgar L. Black
  • April 24, 2016

2
CONFIGURATION
  • Accomplished Layouts based on
  • - Parameters generated from approved? physics
    functional and physical requirements
  • - Equipment components were design developed
    based on above parameters
  • In progress
  • - Hard study of details that meet the
    functional and physical interfaces
  • Required
  • - More interaction on defining physical
    interface parameters with the facility and
    services
  • - More definition on the experiment requirements
    (a list of possible immediate and future
    experiments)
  • - Decision on the center for configuration
    control

3
SPECIFICS Hydrogen absorber module
  • Conceptualized the modular construction to
    facilitate the experiments operations
  • In progress- Investigating feasibility of
    constructing the modules with a combined
    flexibility and safety characteristics
  • Required- Acceptance and implementation of
    modular operability.
  • - Facility requirements for
  • Mobility, Connections flexibility, Safety
  • - RF/Hydrogen modules physical and functional
    interfaces definition
  • Next Detail vacuum double wall vessels design
    and interfaces

4
INNER MODULE INTEGRATION
  • Accomplished design that meets RALs safety
    containment requirements.
  • In progress detail feasibility studies of
    components fabrication and assembly. Studies on
    the as designed components functional
  • Structural integrity capabilities, Fluids
    dynamics and Heat transfer characteristics
  • Required coupling coils design and structural
    support interface specifications.
  • RAL Safety recommendation of standards for
    interfaces of
  • Fasteners, cryogenic gas and liquid fluid
    connections, electrical, instrumentation etc.

5
INNER MODULE INTEGRATION (CONTINUED)
  • Required
  • Discussions on removable windows or removable
    absorbers assemblies
  • Bolted or non bolted absorber windows
  • Vertical or side cryo connections
  • Next verify coupling coil structural support
    and interface from magneto dynamics and physical
    specifications .
  • - design the coils cold mass support
  • - fabricate, measure and test the absorber
    windows new design

6
COST AND TIME SCHEDULE
  • Accomplished- preliminary cost and schedule
    studies supported by US vendors estimates on
    earlier absorber designs (costs of magnet coils
    from M. Green).
  • In progress similar effort on current design
    plus in house estimates from on going activities
  • Required a study of the components fabrication,
    partial shipping, sub assembling, stage testing,
    final assembling, retesting, packing, final
    shipping and installation
  • -Need decision on ho, where and when, will the
    various components be fabricated, tested and
    assembled prior to their final installation.

7
Final note
  • The preliminary costs and schedules, for the
    liquid hydrogen absorber only, were based on the
    following
  • - KEK fabricate the absorber heat exchanger
    associated piping connections and absorber vacuum
    chamber.
  • - NIU/IIT fabricate outer containment vessel,
    supports, windows for vacuum and absorber,
  • - LBNL/Oxford provide the coupling coils with
    coils support structures.