Title: LCG Applications Area Milestones


1
LCG Applications Area Milestones
  • Torre Wenaus, BNL/CERN
  • LCG Applications Area Manager
  • LHCC Meeting
  • November 25, 2002

2
Initiation of AA Work via SC2-RTAGS
  • Applications Area prerequisite and priority for
    initiating work
  • RTAGs successfully addressing common projects
  • And SC2 turning over project mandates to the
    PEB-AA
  • Initial round of project mandates emerged from
    RTAGs in April
  • Software process
  • Persistency framework
  • Math libraries
  • Second round emerging now
  • Architecture blueprint (guidance for all
    projects work for several)
  • Event generators
  • Detector description
  • Simulation

Translation into AA projects
3
Apps Area Project Status
  • Apr Software process and infrastructure (SPI)
    Alberto Aimar
  • Apr Persistency framework (POOL) Dirk
    Duellmann
  • Jun Math libraries Fred James
  • Oct Core libraries and services (CLS) Pere
    Mato
  • Nov Physicist Interface (PI) Vincenzo
    Innocente
  • Event generators (Project activity pending)
  • Detector description (RTAG complete SC2
    deliberating)
  • Simulation (RTAG complete SC2 deliberating)

Status relative to preliminary plans at March
Launch Week
4
Top Priorities from March A Current Look
Initiate First half 2002
  • Establish process and infrastructure project
    (Active)
  • Address core areas essential to building a
    coherent architecture, and develop the
    architecture
  • Object dictionary (Active)
  • Persistency (Active)
  • Interactive frameworks (Launched), analysis tools
    (Partially launched)
  • Address priority common project opportunities
  • Driven opportunistically by a combination of
    experiment need, appropriateness to common
    project, and the right moment (existing but not
    entrenched solutions in some experiments)
  • Detector description and geometry model (RTAG
    complete SC2 deliberating)
  • Driven by need and available manpower
  • Simulation tools (RTAG complete SC2
    deliberating)

5
Near term priorities from March
Initiate Second half 2002
  • Build outward from the core top tier components
  • Conditions database (Pending, but common tool
    exists)
  • Framework services, class libraries (Launched)
  • Address common project areas of less immediate
    priority
  • Math libraries (Active)
  • Physics packages (Mandate received by PEB-AA)
  • Extend and elaborate the support infrastructure
  • Software testing and distribution (Active)

Deliver fall/late 2002 basic working
persistency framework (On schedule)
6
Medium term priorities from March
Initiate First half 2003
  • The core components have been addressed,
    architecture and component breakdown laid out,
    work begun. Grid products have had another year
    to develop and mature. Now explicitly address
    physics applications integration into the grid
    applications layer.
  • Distributed production systems. End-to-end grid
    application/framework for production.
  • Distributed analysis interfaces. Grid-aware
    analysis environment and grid-enabled tools.
  • Blueprint RTAG recommends prompt attention (RTAG)
  • Under SC2 consideration
  • Some common software components are now
    available. Build on them.
  • Lightweight persistency, based on persistency
    framework
  • Release LCG benchmarking suite

7
Candidate RTAG timeline from March
Blue RTAG/activity launched or (light blue)
imminent
8
Apps area planning materials on web
  • Planning page linked from applications area page
    in development
  • Applications area plan spreadsheet overall
    project plan
  • http//lcgapp.cern.ch/project/mgmt/AppPlan.xls
  • High level schedule, personnel requirements
  • Applications area plan document overall project
    plan
  • http//lcgapp.cern.ch/project/mgmt/AppPlan.doc
  • Incomplete draft
  • Personnel spreadsheet
  • http//lcgapp.cern.ch/project/mgmt/AppManpower.xls
  • Currently available/foreseen apps area personnel,
    activities
  • Planning materials PBS, milestones, personnel
    resources
  • http//atlassw1.phy.bnl.gov/Planning/lcgPlanning.h
    tml

9
Apps Area Milestones
  • Level 2 milestones developed for existing and
    anticipated projects
  • Except for small projects, not done yet (math
    libs, generators)
  • At least until mid 2003
  • Milestones in the existing projects have been
    either defined by or OKd by the project managers
  • Project data maintained in XProject (in-house
    tool for software project planning)
  • And exported to MS Project for integration with
    other areas, Gantt display, etc.

10
Apps Area Milestones
  • State of the AA milestones reflects the state of
    the AA projects
  • L1 milestones are only in project areas which
    were defined or foreseeable early
  • Persistency and grid interfaces
  • Nonetheless, we probably have the right set of L1
    milestones, unless our mandate in simulation
    warrants L1 milestone(s)
  • L2 milestones are detailed only in the one
    software development project that has been active
    for gt1 month and has developed a work plan
    persistency
  • Other development projects were initiated in Oct,
    Nov or are still pending
  • Will be filling out the L2 milestones and
    delivering work plans to the PEBSC2 over the
    next several months
  • Detailed milestone descriptions are shown on the
    web, but not on these slides

11
L1 Milestones (1)
12
L1 Milestones (2)
13
MS Project Gantt Schedule for POOL
14
Pool Release Schedule
  • End September V0.1 (Released on schedule)
  • Core components for navigation
  • End October (Nov 15) V0.2 (Released on
    schedule)
  • First collection implementation
  • End November (Dec 15) V0.3 (First public
    release)
  • EDG/Globus FileCatalog integrated
  • Persistency for general non-ROOT C classes
  • Event meta data annotation and query
  • End Feb Interface-complete release
  • For experiment software integration
  • Mid Apr Pre-production release
  • Feature-complete with respect to June bug fix
    release
  • June 2003 Public Production Release (L1
    milestone)

15
POOL L1, L2 Milestones
16
Software Process and Infrastructure Milestones
17
Core Libraries and Services Milestones
18
Physicist Interface Milestones
19
Concluding Remarks
  • Applications area schedule in rapid evolution as
    new projects come into scope
  • Level 1 milestones, set last spring, still seem
    appropriate and attainable
  • Their definitions were tightened up as much as
    possible given present knowledge
  • And tightening them further as new (e.g. RTAG)
    info comes in has been built into the schedule
  • Level 2 milestones establish the detailed program
    of work and provide project tracking
  • Granularity 1/month for the major projects, for
    1yr out less frequent beyond 1yr
  • Will be fleshed out for the new projects over
    next 2 months